Loading…
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹50,000
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
MANAGING DIRECTOR
STEEL INDUSTRIALS KERALA LTD.SILK Nagar, Athani P. O, Mulamgunnathukavu,Thrissur - 680 581,Kerala, India.
Supply, Installation, Commissioning and Performance Demonstration of 3MT Diesel operated forklift as per the technical specifications and detailed scope for RVSF at SILK SFU, Cherthala, Alappuzha and SILK SBUA,Kannur
2026_SILK_840075_1
SILK/RVSF/SBUA/SFU/2025-26/13
Open Tender
Miscellaneous Works
Item Rate
21 days
Cherthala
As per the tender documents
9 documents required · 9 mandatory
₹2,950
₹50,000
6 Mar 2026
24 Feb 2026
7 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
24 Feb 2026 - 6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STEEL FABRICATION UNIT, CHERTHALA, ALAPPUZHA, KERALA | |||||
| 1.01 | Supply, Installation, Commissioning and Performance Demonstration of 3MT Diesel operated forklift as per the technical specifications and detailed scope for RVSF at SILK Steel Fabrication Unit, Cherthala | 1 | Nos | - | - |
| 1.02 | First year AMC (after the Gurantee peiod of 2 years as per the tender conditions) | 1 | LS | - | - |
| 1.03 | Second year AMC (after the Gurantee peiod of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 1.04 | Third year AMC (after the Gurantee peiod of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2SHIP BUILDING UNIT, AZHIKKAL, KANNUR, KERALA | |||||
| 2.01 | Supply, Installation, Commissioning and Performance Demonstration of 3MT Diesel operated forklift as per the technical specifications and detailed scope for RVSF at SILK Ship Building Unit, Azhikkal, Kannur | 1 | Nos | - | - |
| 2.02 | First year AMC (after the Gurantee peiod of 2 years as per the tender conditions) | 1 | LS | - | - |
| 2.03 | Second year AMC (after the Gurantee peiod of 2 years and 1 year AMC period as per the tender conditions) | 1 | LS | - | - |
| 2.04 | Third year AMC (after the Gurantee peiod of 2 years and 2 year AMC period as per the tender conditions) | 1 | LS | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
GCC.pdf
Tender Documents • 0.66 MB
COMPLIANCEMATRIX.pdf
Additional Documents • 0.24 MB
TECHNICALSPECIFICATION.pdf
Additional Documents • 0.28 MB
BOQ_1415947.xls
BOQ • 0.29 MB
TENDERENQUIRY.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .