Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.0 LAccepted-AOC KUZHIPPALLIL H KATTAPPANA | KATTAPPANA | KERALA | ₹13.0 L | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹20.1 L+₹7.1 L (54.8%)Rejected-Finance | ₹20.1 L+₹7.1 L (54.8%) | 2 | Rejected-Finance 2ND LOWEST |
| Sl No | Description | Qty | Unit | Saju M J L2 | GIFTY MARY SABU L1 |
|---|---|---|---|---|---|
| 1.00 | Quoted Amount of BOQ1 in figures | 1 | Nos | 13.3 ₹17,06,136.81 | 13,00,757.13 ₹13,00,757.13 Lowest |
| 2.00 | GST Rate in percentage | 1 | Nos | 18 ₹3,07,104.63 Lowest | - |
Tender Value
₹19.7 L
EMD Value
₹49,200
Closing Date
21 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER-PMU, THODUPUZHA
EXECUTIVE ENGINEER-PMU, THODUPUZHA KSEB
DS11KV LINE CINSTRUCTION-PRAKASH TO PERUMTHOTTY 3250 M COV.CONDR
2026_KSEB_849174_1
PMU/ TDPA/E tender/15/2026-27/ dated 30.04.2026
Open Tender
Electrical Works
Percentage
90 days
MURIKKASSERY IDUKKI
AS PER TENDER
5 documents required · 5 mandatory
₹5,900
₹49,200
8 Jul 2026
2 May 2026
22 May 2026
2 May 2026
21 May 2026
2 May 2026
2 May 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 35 | Trip | 3,142.26 | ₹1,09,979.1 |
| 2 | FittinganderectingoneHTPSCSinglePoleinposition,includingfitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 60 | No | 3,274.36 | ₹1,96,461.6 |
| 3 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. | 258 | No | 158.91 | ₹40,998.78 |
| 4 | FittingoneAdditional75x40mm,1.8mChannelcrossarminexisting single pole including conveyance of materials. | 48 | No | 481.95 | ₹23,133.6 |
| 5 | LabourchargesforloadingHTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). | 91 | No | 762.14 | ₹69,354.74 |
| 6 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 46 | No | 4,143.14 | ₹1,90,584.44 |
| 7 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 64 | No | 906.41 | ₹58,010.24 |
| 8 | Providingconcretemuffingofsize0.45x0.45x1.5m(0.5maboveGLand 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. | 64 | No | 4,028.29 | ₹2,57,810.56 |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 60 | No | 434.91 | ₹26,094.6 |
| 10 | AdditionalrateforexcavationofonePitforHTPole/HTStayinHard Laterite. | 35 | No | 868.77 | ₹30,406.95 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434946.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
GCC.pdf
Tender Documents • 1.04 MB
Generaltermandconditions.pdf
Other Document • 0.99 MB
SpecialCondition.pdf
Additional Documents • 0.73 MB
BOQ_1434946.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .