| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹5.1 L+₹1,135.21 (0.22%)Rejected-Finance | 2 | Rejected-Finance 2 |
Tender Value
₹5.5 L
EMD Value
₹13,750
Closing Date
21 Mar 2023, 5:00 pmClosed
Assistant Engineer
LSGD section Kanjirapalli
Annual Plan-353/2022-23 -RENOVATION OF KULAPPURAM EZHARAPPARAMBU CULVERT IN WARD -13
2023_LSGD_566181_6
09/AE/LSGD/KPLY 2022-23
Open Tender
Civil Works - Roads
Item Rate
180 days
Kanjirapalli
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,100
Yes
₹13,750
Yes
20 Jun 2023
14 Mar 2023
23 Mar 2023
14 Mar 2023
21 Mar 2023
14 Mar 2023
Amount
CULVERT & RETAINING WALL
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20
12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I. P.C.C grade M 15 (i) Nominal mix (1:2.5:5)
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
13.3:Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
OD418775/2022-2023: Filling with quarry muck-Filling up low laying and water logged areas with local materials/quarry muck, spreading in layers, levelling the top at site and consolidation by ramming ,etc. quantity for 300 m3(with out roller consolidation
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD418776/2022-2023:Supplying and fixing Granite Name board of size 50x40 cm fixed in solid cement block and plastering the brick work etc complete.
hand rail
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
JAYAKRISHNAN P R (J K ASSOCIATES)
Bidder Name
JAYAKRISHNAN P R (J K ASSOCIATES)
PANTHAPLACKAL CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_835246.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .