Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹13,681
Closing Date
27 Jun 2026, 4:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
ASSISTANT EXECUTIVE ENGINEER
O/o Assistant Executive Engineer, PWD Electrical Subdivision, Civil Station, Alappuzha-688001
GENERAL-AMC 110 TR Chiller -Annual Maintenance Contract of central air conditioning plant in TDMCH ,Vandanam for the period for one Year (2026-2027)-Electrical AC Work
2026_PWD_856057_1
PWD/BLDG/TR/3132/2026_13_1_1
Open Tender
Electrical Works
365 days
Vandanam
Please refer tender documents
11 documents required · 11 mandatory
₹1,210
₹13,681
16 Jun 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1AMC -Chiller plant | ||||||
| 1.001 | OD319954/2025-2026:Annual Maintenance Contract of the 110 TR water cooled DX Chiller includes:-
1. Check and render preventive maintenance service to all the equipment every 3 month. ie, four times in an year through M/s Blue Star Limited.
2. Attend all breakdown calls
Each Service will include:-
a. Checking the functioning of Chillier Units/ AHU Unit/ FCU Units/ Pumps/ Cooling Towers/ Controls and all other equipment connected with the Chillier machines
b. Free replacing of defective/ worn out parts with new or repaired parts of Compressor/ Thermostat / Cut outs.
c. Repairing of equipment at site/ service station as the case may be
d. Descaling of condensers/ chemical cleaning of evaporator coils/ replacement of pre filters.
e. Checking of compressor for its proper functioning
f. Annual pumping down and re-starting as and when needed
g. Checking of Microprocessor control panel, Control boards, transducers of packaged chillers/ Condensing unit for their correctness and replace if necessary.
h. Replacing of parts due to normal wear and tear.
i. Maintain log book to record the maintenance activity for one year | - | each | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | OD319955/2025-2026:Operation of chiller plant at Govt TDMCH, Vandanam .Always keep all installations in good working order including rectifying minor faults noticed in chiller ,AHU and FCU system. The contractor shall employ at least one qualified mechanic in one shift. But the contractor is liable to engage his labor to replace any spares/components supplied by the department. | - | each | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD319956/2025-2026:Disconnecting the electrical connection from the starter to motor , removing the coupling bolt and foundation bolt , lifting the motor/pump , convey the motor to workshop by vehicle and unloading etc as required .( 10HP/15HP/25HP motor/pump) | - | each | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD319952/2025-2026:Charges for conveying back the repaired motor to pump house, fitting in position, coupling with pump , checking correct alignment , giving connection and trial run etc. | - | each | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD319951/2025-2026:Charges for dismantling 25 HP motor into stator and rotor, removing the whole burnt out coil of the stator winding by cutting and pulling after loosening the buding wires , cleaning the slots cleaning with petrol insulating the slots with best quality insulating material, making coils ,rewinding the whole stator coils with super inamelled seperior quality copper winding wire of existing guage, winding , shaping etc providing fibre wedges, soldering , sleeving, connecting providing fresh lead wires etc heating varnishing using good quality insulating varnish baking crating to get the required magnitude of I R value and making the stator winding in good working condition (Dismantled copper scrap need not be ret | - | each | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | OD319950/2025-2026:Charges for dismantling 10 HP motor into stator and rotor, removing the whole burnt out coil of the stator winding by cutting and pulling after loosening the buding wires , cleaning the slots cleaning with petrol insulating the slots with best quality insulating material, making coils ,rewinding the whole stator coils with super inamelled seperior quality copper winding wire of existing guage, winding , shaping etc providing fibre wedges, soldering , sleeving, connecting providing fresh lead wires etc heating varnishing using good quality insulating varnish baking crating to get the required magnitude of I R value and making the stator winding in good working condition (Dismantled copper scrap need not be returned ) | - | each | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | OD319953/2025-2026:Charges for dismantling 15 HP motor in to stator and rotor, removing the whole burnt out coil of the stator winding by cutting and pulling after loosening the buding wires , cleaning the slots cleaning with petrol insulating the slots with best quality insulating material, making coils ,rewinding the whole stator coils with super inamelled seperior quality copper winding wire of existing guage, winding , shaping etc providing fibre wedges, soldering , sleeving, connecting providing fresh lead wires etc heating varnishing using good quality insulating varnish baking crating to get the required magnitude of I R value and making the stator winding in good working condition (Dismantled copper scrap need not be returned ) | - | each | - | - | BI01010001010000000000000515BI0100001120 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1446884.xls
BOQ • 0.26 MB
viewsbd3132.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid