Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹14.9 L
EMD Value
₹29,900
Closing Date
16 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE_DHHD
Office of the Executive Engineer, Diamond Harbour Highway Division, PW Roads Directorate
Construction of Temporary Bus Stand at Kakdwip Stadium under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2027
2026_WBPWD_5082132_9
WBPWRD/EE/DHHD/NIT-14/26-27
Open Tender
CIVIL WORKS
Percentage
20 days
KAKDWIP
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,900
Yes
18 Nov 2026
2 Nov 2026
18 Nov 2026
2 Nov 2026
16 Nov 2026
2 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
By Manual Means In area of light jungle | 0.21 | Ha. | 65,471.56 | ₹13,552.61 |
| 2 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor as per the requirement of MORT&H's specification 3003. Note The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal. | 2,070 | Sq.M. | 17.11 | ₹35,417.7 |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | 103.5 | Cu.M. | 1,288.75 | ₹1,33,385.63 |
| 4 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. (d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm) | 2,070 | Sq.M. | 421.13 | ₹8,71,739.1 |
| 5 | Supplying of Silver Sand stored & stack at site | 15 | Cu.M. | 1,002.12 | ₹15,031.8 |
| 6 | Supplying of Brick bats stored & stack at site | 20 | Cu.M. | 1,708.5 | ₹34,170 |
| 7 | Supplying empty cement bags in good condition & filling empty cement bags with earth and placing them in position including tying and sewing mouth (cost of thread included) and all incidental charges complete but including cost od gunny bags and earths | 100 | Each | 9.6 | ₹960 |
| 8 | Supplying of Mazdoor (Male) for emmergent petty works during mela with axe, shovels, jhora etc. | 210 | Head | 414.29 | ₹87,000.9 |
| 9 | Labour for taking out one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm) brick-on-end including removing debris to flank or berm sorting out serviceable materials and stacking. | 2,070 | %Sq.M. | 3,538.22 | ₹73,24,115.4 |
| 10 | GST @ 18.00% over Sl. No. 1 to Sl. No. 9 | - | GST | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_5196245.xls
BOQ • 0.33 MB
WBF_2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .