Loading…
Loading…
Tender Value
₹22.9 L
EMD Value
₹23,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer, Ahmedabad City (R&B) Division, Ahmedabad
Renovation of Govt. Chora Office, Bag-E-Firdos, Maninagar, Ahmedabad. (Construction of Compound Wall and Other misc. Work at Govt. Chora Office, Bag-E-Firdos, Maninagar, Ahmedabad)
345450
15 of 2026-2027
Open
Civil Works - Buildings
Works
Ahmedabad
6 documents required · 6 mandatory
₹900
Executive Engineer, Ahmedabad City (R&B) Division, Ahmedabad
₹23,000
16 Sept 2026
16 Sept 2026
16 Sept 2026
28 Sept 2026
16 Sept 2026
Name of Work : Renovation of Govt. Chora Office, Bag-E-Firdos, Maninagar, Ahmedabad.
(Construction of Compound Wall & Other Misc Work at Govt. Chora Office,
Bag-E-Firdos, Maninagar, Ahmedabad)
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
1 26.00 Demolition of Brick work and 550.40 Rupees Five Cum
stone masonry including Hundred Fifty
stacking of serviceable And Paise
materilas and disposal of Forty Only
unserviceable materials with all
lead and lift.(ii) In Cement
2 325.00 Excavation for foundation upto 117.08 Rupees One Cum
1.5 m depth including sorting Hundred
out and stacking of useful Seventeen And
materials and disposing off the Paise Eight
excavated stuff upto 50 Meter Only
lead.(A) Loose or soft soil
3 59.00 Providing and laying cement 2680.21 Rupees Two Cum
concrete 1:4:8 (1- Cement : 4- Thousand Six
coarse sand : 8- hand broken Hundred Eighty
stone aggregates 40 mm And Paise
nominal size) and curing Twenty One
complete excluding cost of Only
formwork in (A) Foundation and
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
4 20.00 Providing and laying cement 3962.80 Rupees Three Cum
concrete work 1:2:4 (1- Cement Thousand Nine
: 2- Coarse sand : 4- graded Hundred Sixty
stone aggregates 20 mm Two And Paise
nominal size) and curing Eighty Only
complete excluding cost of
formwork and reinforcement for
reinforced concrete work in (A)
Foundations, footings, Base or
columns and Mass concrete
5 6052.00 Providing TMT Bar FE 500D 76.21 Rupees KG
reinforcement for R.C.C. work Seventy Six
including bending, binding and And Paise
placing in position complete Twenty One
upto floor two level Only
6 29.00 Providing and laying cement 4052.59 Rupees Four Cum
concrete work 1:2:4 (1- Cement Thousand Fifty
: 2- Coarse sand : 4- graded Two And Paise
stone aggregates 20 mm Fifty Nine Only
nominal size) and curing
complete excluding cost of
formwork and reinforcement for
reinforced concrete work in (B)
Slabs, landing, shelves,
Balconis , Lintels, Beams,
Girders and Cantilever upto
floor two level.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
7 493.00 Providing formwork of ordinary 173.40 Rupees One Sqm
timber planking so as to give a Hundred
rough finish including centering Seventy Three
shuttering strutting and And Paise
propping etc. Height of Forty Only
propping and centering below
supporting floor to ceiling not
exceeding 4 M. and removal of
the same for in situ reinforced
concrete and plain concrete
work in. (A) Foundations
Footings Bases of Columns
etc. and Mass concrete.
8 24.00 Providing and laying cement 4052.59 Rupees Four Cum
concrete work 1:2:4 (1- Cement Thousand Fifty
: 2- Coarse sand : 4- graded Two And Paise
stone aggregates 20 mm Fifty Nine Only
nominal size) and curing
complete excluding cost of
formwork and reinforcement for
reinforced concrete work in (D)
Columns, Pillars posts and
struts upto floor two level.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
9 500.00 Providing and fixing pre-cast 686.90 Rupees Six Sqm
Rubber Dye / steel Dye inter Hundred Eighty
locking concrete block 60mm Six And Paise
thick with grade of concrete Ninety Only
M300 pnumatic compressed /
vibrated mechanically and as
per approved design
Confirming to IS 15658 :
including 35 mm Sand layer for
levelling and filling the joint with
sand in proper line and level as
per guidlines of IRC : SP 63-
2018 etc. Complete.
10 86.50 Brick work using common burnt 4295.99 Rupees Four Cum
clay building bricks having Thousand Two
crushing strength not less than Hundred Ninety
35 kg./Sq.Cm. in foundation Five And Paise
and plinth in Cement Mortar Ninety Nine
1:6 (1- Cement : 6 -fine sand) Only
in superstructure above plinth
level upto floor two level (B)
Conventional (upto 10 ton)
11 227.50 Filling available excavated 130.39 Rupees One Cum
earth (excluding rock) in Hundred Thirty
trenches. plinth, sides of And Paise
foundations etc. in layers not Thirty Nine Only
exceeding 20 cm. in depth
consolidating each disposited
layer by ramming and watering.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
12 1025.00 20mm thick sand faced cement 300.66 Rupees Three Sqm
plaster on walls upto height 10 Hundred And
metres above ground level Paise Sixty Six
consisting of 12mm thick Only
backing coat of C.M. 1:3 (1-
cement : 3-sand) and 8mm
thick finishing coat of C.M. 1:1
(1-cement : 1-sand) etc.
13 1025.00 Finishing wall with weather 114.53 Rupees One Sqm
proof exterior emulsion paint on Hundred
wall surface (two coats) to give Fourteen And
an required shape even shade Paise Fifty
after thoroughly brushing the Three Only
surface to remove all dirt, and
remains of loose powdered
materials.etc complete
14 765.00 Steel work, welded in built up 84.13 Rupees Eighty Kg
sections framed work including Four And Paise
cutting, hoisting, fixing in Thirteen Only
position and applying a priming
coat of red lead paint. (A)In
beams and joists, channels
angles Tees, flats, with
connecting plates or angle
cleats as in main and cross
beams. Hip and jack rafters,
purlins connetedto common
rafters and the like
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
15 76.50 Painting two coats (excluding 87.81 Rupees Eighty Sqm
priming coat) on newsteel and Seven And
other metal surface with Paise Eighty
enamel paint, brushing, interior One Only
to give an even shade including
cleaning the surface an even
shade including cleanicn the
surface of all dirt, dust and
other foreign matter.
Rupees Twenty Two Lakh(s) Ninety Two Thousand Six Hundred Nine And Paise Seventy Two Only
I / We am / are willing to carry out the work at _________________ % above / below percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under:
*Estimated Amount *Estimated Amount
Put to Tender Rs.________ Put to Tender Rs.________
Deduct _____% below Rs. ________ Add _____% above Rs. ________
Net Rs.________ Net Rs.________
*(Please strike out whicever is not applicable)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
5 Credit of Dismanteled Materials amount Rs. Deducted from 1st R.A. Bill
Deputy Executive Engineer Executive Engineer
Dated Signature of Constn. (R&B) Sub Dn. No.1 Ahmedabad City (R & B) Division
the contractor Ahmedabad. Ahmedabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001-SBD (Chora Office-Bag-e-Firdos).pdf
002-Special Condition-1.pdf
003-Special Condition-2.pdf
004-Brand Pasandgi.pdf
005-Khas Sharat.pdf
006-GR as per SBD (12-01-2024)-City Dn.pdf
007-Standards for Cement Con. Dt.11-5-2017.pdf
008-Single Tender GR Dt.18-2-2017.pdf
009-Tender Negotiation Dt.08-06-2018.pdf
010-Testing Schedule Dt.24-10-1994.pdf
011-GR Reg Laplength in Reinforcement Dt.15-2-2017.pdf
012-FD Circular No 1097 GST Dt.15-9-2018.pdf
013-Registration Mandatory Dt.3-9-2016.pdf
014-Tender Reinvite Guideline Dt.25-8-2015.pdf
015-E-Tendering-Tender Fee and EMD Dt18-1-2008.pdf
016-E-Tendering-Tender Fee and other doc Dt.27-11-2008.pdf
017-COMPUTERISED MB GR Dt.1-2-2017.pdf
018-Payment through RTGS-NEFT Dt.30-4-2018.pdf
019-RMC (Dt.15-07-2023)for above 5 cr works.pdf
020-Mix Design Condition.pdf
021-Guarantee Bond-All.pdf
022-Performance Bond and Bitumen date Dt.04-05-2026.pdf
023-SARDAR SAROVAR-1 (1).pdf
024-Tender Negotiation Dt.17-3-2026.pdf
025-15 year lift amc GR.pdf
026-Sch-B (Chora Office-Bag-e-Firdos).pdf
027-Specification Index.pdf
028-Specification.pdf
029-Material Testing Schedule.pdf
030-GTS Booklet-192 Pg.pdf
031-Tender Notice No.15 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .