Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹27.6 L
EMD Value
₹28,000
Closing Date
4 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Ambica Division, Navsari
CONSTRUCTION OF CSY ON GADAT MINOR & 3L EX GADAT MINOR
367344
5 of 2026-27
Open
Civil Works - Canal
Works
Navsari
14 documents required · 14 mandatory
₹1,500
Executive Engineer, Ambica Division, Navsari
₹28,000
20 Nov 2026
20 Nov 2026
20 Nov 2026
4 Dec 2026
20 Nov 2026
120 days
Name of Work : CONSTRUCTION OF CSY ON GADAT MINOR & 3L EX GADAT MINOR.
Memorandum showing items of work to be carried out
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Dismentalling the existing brick masonry
including sorting outand stacking the useful Rupees Seven
materials and removing the debries and Hundred Fifty
making good the damage etc. complete as Seven and Forty
directed. (b) In cement mortar Paise Only
Dismentalling the existing foundation
concrete including disposing the dismentalled Rupees One
stuff including sorting out and stacking the Thousand One
2 43.68 useful materials and removing the debries 1165.2 Hundred Sixty CM
and making good the damage etc. complete as Five and Twenty
directed. (b) In cement Concrete Paise Only
Dismentalling the existing R.C.C pipes of the
following diameter including sorting out and Rupees Five
stacking the useful materials and refilling the Hundred Eighty
trenches etc. complete as directed. (NP-2 Two and Sixty
Pipes) (b) 450 mm to 600 mm dia. Paise Only
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft &
hard murrum, etc. dry condition including Rupees Eighty
4 200.67 depositing the excavated stuff in uniform 81.50 One and Fifty CM
layers in banks or as directed etc. complete Paise Only
for lead up to 1.0 Km and all lifts. (By
machinery) (a) Above water table.
Providing and fixing in position (different
diameter) I.S NP3 class reinforced pipe with
caulking the joints with cement mortar 1:1 Rupees Five
proportion using jute string soaked in cement Thousand Seven
5 42.50 slurry, finishing joints, and laying pipes to the 5758.40 Hundred Fifty M
designed grade and levels, curing etc. Eight and Forty
complete for all lead and lifts. (g) NP3 class Paise Only
1200mm dia pipe.
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
Construction of Granular Sub Base (GSB) by
providing Well graded material of grading-II,
spreading in uniform layers on prepared Rupees Six
6 84.62 surface, mixing, watering and compacting etc. 611.00 Hundred Eleven CM
complete as per specification or as directed.
Filling in foundation with concrete of cement,
sand and gravel in following proportion Rupees Four
including centering, shuttering, temping, Thousand Five
7 28.55 smooth finishing, curingetc. Complete as 4581.10 Hundred Eighty CM
directed for all leads and lifts. (Manually With One and Ten
Conventional Mixer)(iv)1:2:4 Paise Only
Providing and laying Plain/Reinforced cement
concrete of cement, sand and metal ( 20 mm Rupees Five
to 25 mm size)in following proportion laid Thousand Three
8 337.10 insitu including centering, shuttering, 5380.20 Hundred Eighty CM
temping, smooth finishing, curing etc. and Twenty Paise
complete as directed for all leads and lifts
(Manually With Conventional Mixer) (v)1:1.5:3
Providing and placing in position
reinforcement bars including cutting, bending Rupees Seven
9 35.22 welding, joints where necessary, hooking etc. 7194.00 Hundred Ninety
complete as per drawing for all lead and lifts. Four Only
Providing and laying plain/Reinforced cement
concrete lining of 1:2:4 proportion (Nominal
mix) in bed, side slope and curveture Rupees Three
including mixing transporting, placing, Hundred Sixty
smooth finishing, curing including dewatering Four and Fifty
where required (Manually With Conventinal Paise Only
Mixer Without Paver ) a) 7.50 cm in Bed &
slope (with water curing )
Rupees Twenty Seven Lacs Sixty One Thousand Four Hundred Seventy Nine and Seventy Four paise only
Quantities Total Amount
Quantities Total Amount
Item Estimated according to
Item of work In figure Unit
No. but may be In words Estimated
more or less Quantities
I/We am/are Willing to carry out the work at……………………………...………% above/below Percent(should be written in
figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount Put to tender Rs. 2761479.74 * Estimated amount Put to tender Rs.
Deduct…….%below Rs. Add…….% above Rs.
Net Rs. Total Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture,
Note-4 To be continued on additional sheets, if found necessary.
Divisional Accountant Executive Engineer
Ambica Division Ambica Division
Navsari Navsari
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD BOOK.pdf
2 Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .