Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
8 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
P J Kapdia (AGM)
Tender Enquiry for the Annual Rate Contract (ARC) for Horticulture Works and other stray jobs in the Plant Area / Aniline-TDI complex / Corporate Building Premises / STL-TCL & Neem Complex Area
368266
Admin/SM(USP)/ARC/Horti/Plant/2026
Open
Administration - Horticulture, Grass cutting, Tree planting
Service
Bharuch
3 documents required · 0 mandatory · 3 optional
24 Nov 2026
24 Nov 2026
24 Nov 2026
8 Dec 2026
24 Nov 2026
90 days
The quantity indicated against each item in the Schedule of Rates is only
tentative and is likely to increase/decrease to any extent during the contract
and the Company shall not be obliged to entertain any complaint or claim
what-so-ever in this regard from the Contractor.
The quantum of work/job would vary/fluctuate depending upon the market
requirements/ demands from time to time. The Company reserves its right
not to operate at all or partially operate any of the items of work listed in the
schedule of Rates during the Contract and the company shall not be
obliged to entertain any complaint or claim what-so-ever in this regard from
the contractor.
6. PAYMENT TERMS:
6.1 On satisfactory completion of the work, the contractor shall prepare
and submit bill in duplicate along with all relevant and supporting
papers for the respective month to the Engineer-in-charge / Officer-
in-charge of the work. The payment of the bills shall be made on
monthly basis by NEFT/RTGS after usual deduction of applicable
taxes and other dues as per the rules.
6.2 The bill will be paid within 30 days provided the same is complete in
all respects. Such payment shall be made after completion of the
calendar month and after submission of a certificate from the
Engineer-in-charge / Officer-in-charge duly recommended by him to
the effect that the work carried out by the contractor during the
month is as per the contractual obligations and to the entire
6.3 The payment of running bills/final bill by the Company shall not have
any linkage with the payment of wages and other dues to be made
by the contractor to his deployed manpower. In other words, the
contractor shall discharge from time to time his liabilities for payment
of wages and other dues to his deployed manpower irrespective of
receipt of payment of running bills/final bill from the Company.
6.4 The final bill should be submitted along with documents such as "No
Objection Certificate" from our HR and Security Departments and
No claim Certificate from you.
6.5 The payment towards the Final Bill will be released after 90 days of
submission of the Final Bill / Completion of the defect liability period.
6.6 In case the Contractor abandons the site during the currency of the
contract, no payment what-so-ever shall be released even for the
partial work that might have been done by the Contractor. The
company shall have also right to forfeit the amount of Retention
Money & Security Deposit.
7. TAXES AND DUTIES:
Bidder to clearly mention all applicable taxes and duties in Schedule of
Rates, on supply of goods and / or services to be made.
8. SECURITY DEPOSIT :
In the event of award of Contract, the successful Bidder will submit Security
Deposit at the time of acceptance of contract in the form of Bank
Guarantee / Demand Draft / RTGS or in the form of one Single Bank
Guarantee in prescribed format of GNFC from Nationalized Bank only and /
or Bank approved by GNFC, which shall be valid till faithful execution of
contract plus 3 months claim period for an amount equivalent to 7 % of total
contract value (including taxes and duties).
Security Deposit/ Bank Guarantee shall be released after upon satisfactory
performance of the contract and completion of the defect liability period. In
case extension is granted the Contractor shall accordingly furnish SDBG
for further period of Contract.
9. SUB CONTRACTING:
The Contractor shall not assign or transfer whole or part of the contract
awarded, or whole or part of works, services, obligations, responsibilities,
liabilities and rights or give a sub-contract for carrying out all or any of the
work, service, obligation, responsibility, liability and right, to any other
person or party without Company’s prior written consent.
10. ALTERATION IN SCOPE OF WORK:
The Company may at any time(s) before or after the commencement of the
work by notice in writing issued to the Contractor, alter the scope of work
by increasing or reducing the jobs required to be done by the Contractor or
by adding thereto or omitting there from any specific jobs or operations or
by substituting any existing jobs or operations with other jobs and/or
operations, or by requiring the Contractor to perform any extra works in or
about the job site. And upon receipt of such notice the Contractor shall
execute the job(s) as required within the altered scope of work.
11. PERFORMANCE OF THE CONTRACT:
11.1 The Contractor shall arrange to deploy adequate manpower with
required skill & experience to execute the job smoothly, safely & as
per the schedule &/or frequency.
11.2 The Contractor shall deploy supervisor/s for (i) to coordinate with
Engineer-in-Charge / Officer-in-Charge for job execution (ii)
assignment of the job & to pass on instructions to the manpower
deployed by the contractor for execution of job (iii) effective
supervision of the job (iv) to ensure that manpower deployed by the
contractor are carrying out the job safely, using proper safety
appliances / wearing proper Personal Protection Equipment,
maintaining peace & discipline & observing safety & security
regulations & instructions. (v) to ensure that manpower deployed by
the contractor are not tampering with or operating any machinery /
equipment of the plant.
11.3 The manpower deployed should be engaged for the specific work
under the contract & should not be deployed in other jobs.
11.4 The Company shall have a right to terminate the contract / to split
the job / to get done the work from another agency at the risk & cost
of the contractor, if not deploying adequate manpower / not carrying
out the job as per time schedule / any job is not properly done.
11.5 The contractor shall keep & maintain area neat & clean all the time.
12. CANCELLATION OF CONTRACT:
12.1 The Company shall be entitled at any time at its discretion to cancel
the Contract if, in the opinion of the Company, the cessation of the
work has become necessary owing to any cause, what so ever.
12.2 The Contractor shall not be entitled for any compensation,
whatsoever, in addition to the payment for the work actually
performed by the Contractor, calculated on the basis of the
Schedule of Rates.
13.1 The Contractor shall at all times indemnify and keep indemnified the
Company and its officers, servants and agents from and against all
third party claims whatsoever (including but not limited to property
loss and damage personal accident, injury or death of/to property or
person of any Sub-Contractor and/or the servants or agents of the
Contractor, and Sub-Contractor(s) and/or the Company) and the
Contractor shall at his own cost and initiative at all times hereof take
out and maintain insurance policies in respect of all insurable
liabilities under Employee’s Compensations Act 1923 and all other
applicable labour laws, including but not limited to third party
insurance and Act. Personal injuries insurance Act, etc.
13.2 The Contractor shall also at all times indemnify and keep
indemnified the Company and its officers / employee of the company
including Engineer-in-Charge/ Officer-in-charge against all actions,
proceedings, claims, demands, cost & expenses whatsoever arising
due to failure of the contractor in the performance of his obligations
under the contract.
13.3 The Company shall not be liable for or in respect of any demands or
compensation payable under any law in respect of or in
consequence of any accident or injury to any workman or other
person in the employment of the contractor or his sub-contractor and
the Contractor shall indemnify & keep indemnified the Company
against all such damage and compensation and against claims,
demands, proceedings, costs, charges & expenses whatsoever in
respect thereof or in relation thereto.
14. PENALTY FOR DELAY/ DEFAULT:
14.1 Contractor shall ensure that adequate deployment of labourers is
done and day to day effective co-ordination by trained & experienced
Supervisors to carry out all the activities simultaneously. In case of
inadequate deployment, suitable penalty as may be deemed fit shall
14.2 If in the opinion of the Officer-in-charge, the work of development
and/or maintenance in any of the areas of the gardens/lawns is
unsatisfactory or below the standard and /or any of the provisions of
the labour laws are violated, penalty as may deemed fit shall be
levied on the recommendation of the Officer-in-charge of the work
and deduction of such penalty shall be made from the payments due
to contractor. No payment, however, shall be made for the
rectification done subsequently in such areas.
15.3 FOR DELAY IN STARTING THE JOB: The penalty shall be imposed
to the contractor, for delay in initiation of the assigned work. If the
contractor fails to initiate the job within permitted mobilizing time
limit, the penalty of Rs. 5,000/- per day shall be imposed to him.
However in case of emergency or break-down jobs the contractor
shall mobilize his team immediately and no mobilizing time shall be
given in such condition.
15. SUSPENSION OF CONTRACT:
In appropriate case, the Company may at its discretion, instead of
terminating contract for breach of any terms or conditions by Contractor,
suspend the contract for specified period. In case the contract is so
suspended, Contractor will be under obligation to reimburse the Company
for damages or loss suffered by the Company on account of Company
making alternative arrangement during period of suspension of contract
and if the Contractor fails to reimburse such loss or damages, the same will
be recovered from the Security Deposit or any other payment to be made
to the Contractor under the contract with the Company.
16. TERMINATION:
16.1 Company may, without prejudice to any other remedy for breach of
contract, by written notice of 30 days of default sent to the
Contractor, terminate the Contract in whole or in part if the
Contractor fails to perform any other obligation(s) under the
16.2 If the Contractor goes bankrupt or goes into liquidation.
16.3 In the event of termination of contract by the Company on account of
breach of any terms and conditions of the contract by the Contractor
the entire Security Deposit Bank Guarantee given by the Contractor
will liable to be forfeited.
16.4 The Company may at its discretion, terminate the contract by giving
a notice of 30 days, for convince, at any time, without assigning any
reasons, whatsoever.
17. PAYMENT UPON TERMINATION :
If the Contract is terminated because of a breach of Contract by the
Contractor, the Company shall process payments due to Contractor less all
required deductions. If the total amount due to Company exceeds any
required deductions. If the total amount due to Company exceeds any
payment due to the Contractor, the difference shall be a debt payable by
Contractor to the Company and the same may be recovered from Security
Deposit and/ or any other dues payable by the Company to the Contractor.
18. DEFECT LIABILITY PERIOD AND LATENT DEFECTS :
Defect liability period for works unless otherwise specified shall be NIL
month from the date of issue of Completion Certificate and the Contractor
shall at his own cost and initiative, correct, repair and/or rectify any and all
defect(s) and/or imperfections in the work as shall be discovered during the
said defect liability period and in the event of the Contractor failing to do so
the Company shall be entitled for compensation from the Contractor.
19. GOVERNMENT REGULATIONS:
The Contractor shall comply with and ensure strict compliance by his / its
sub -contractors, servants and agents of all applicable Central, State,
Municipal and Local Laws and regulation / notifications of any Central,
State or Local bodies and authorities and undertakes to indemnify the
Company from and against and levies, damages, penalties and payments
whatsoever as may be imposed by reason of any breach or violation of any
law, rule or regulation whatsoever and all actions, claims and demands
arising there from and / or relative thereto.
GNFC strongly opposes sexual harassment and any such behaviour
against women is prohibited by the law as set down in “The Sexual
Harassment of Women at Workplace (prevention, prohibition and
Redressal) Act, 2013” and Rules framed there under being The Sexual
Harassment of Women at Work place Rules.
You shall ensure compliance of Gujarat Professional Tax Act, 1976 and
required to deduct Professional Tax as applicable from the wages to be
paid to your workers & required to deposit the same to the appropriate
20. COMPLIANCE WITH LABOUR & SAFETY REGULATIONS:
During the continuance of the Contract, the Contractor shall abide at all
times by all existing labour enactments and rules made there under, such
as Minimum wages Act, E.P.F Act.etc., regulations, notifications and bye
laws of the State or Central Government or local authority and any other
labour law (including rules), regulations, bye laws that are in force or may
be passed or notification that may be issued under any labour laws in
future either by the State or the Central Government or the local authority.
The Contractor shall keep the Company indemnified against and/or on
account of contravention of any of the provisions of any Act or rules made
there under, regulations or notifications including amendments.
If the Company is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for non-observance of the provisions
stipulated in the notifications/bye laws/Acts/ Rules/ regulations including
amendments, if any, on the part of the Contractor, Company shall have the
right to deduct all such sums from any money due to the Contractor
including his amount of security. The Company shall also have right to
recover from the Contractor any sum required or estimated to be required
for making the loss or damage suffered by the Company. The employees of
the Contractor in no case shall be treated as the employees of the
Company at any point of time.
21. FORCE MAJEURE:
In the event that performance under the Contract, in the reasonable opinion
of either party (Company & Contractor) is made impossible by force
majeure like war, hostilities, revolution, civil commotion, strike, epidemic,
accident, wind, fire, flood, or because of any law, order, proclamation,
regulation or ordinance of any Government, or of any subdivision thereof or
because of any act of God, quarantine restrictions, epidemics, etc. then
either party shall so notify the other in writing. If such force majeure
circumstances continue for more than three months then either party may
terminate the Contract, or complete performance of the Contract with such
adjustments as are required by the existence of the force majeure and are
agreed upon by the parties.
22. DISPUTE RESOLUTION:
22.1 All disputes or difference(s) whatsoever which shall at any time arise
between the parties hereto touching or concerning the works or the
execution or maintenance thereof of this Agreement/ Contract/ Work
Order/ Purchase Order/ Service Order or the rights touching or
concerning the works or the execution or maintenance thereof of this
Agreement/ Contract/ Work Order/ Purchase Order/ Service Order,
of the construction meaning operation or effect thereof or to the
rights, liabilities of the parties or arising out of or in relation thereto
whether during or after completion of the Agreement/ Contract/ Work
Order/ Purchase Order/ Service Order or whether before or after
determination, foreclosure or breach of the Agreement/ Contract/
Work Order/ Purchase Order/ Service Order, shall be referred by the
disputing Party, in writing to the other Party, within 30 days of
occurrence of such event, to resolve any such dispute or difference.
22.2 If such dispute mentioned above is not resolved amicably by direct
informal negotiation, within a period of 30 days, then such dispute/
difference shall be referred to the Engineer-In-Charge/ Additional
General Manager of the concerned department of GNFC. Engineer-
In-Charge/ Additional General Manager shall give its decision within
60 days of the reference of the dispute to him.
22.3 If any Party serves an Arbitration Notice in respect of any dispute to
the Appointing Authority, the dispute shall be finally settled by
arbitration under the Indian Arbitration and Conciliation Act,
(“Act”) and all statutory amendments, modifications thereof and the
rules made there under, or any other corresponding law for the time
being in force, by the Sole Arbitrator to be appointed as hereinafter
22.4 Within 30 days of receipt of Arbitration Notice, the Appointing
Authority shall appoint the Sole Arbitrator, who shall be a retired
employee of GNFC, not below the rank of General Manager and
who shall be qualified to be appointed as an Arbitrator under the law
in force at the relevant time.
22.5 The provisions of the Indian Arbitration Act, 1996 and all statutory
enactments and modifications thereof and rules made there under
22.6 The Arbitration proceedings shall be conducted in English and the
venue and seat of the Arbitration proceedings shall be at Bharuch
and the Courts at Bharuch shall have exclusive jurisdiction.
22.7 The governing substantive law shall be Indian laws.
23. LABOUR LAWS AND REGULATION:
23.1 The Contractor shall be responsible for strict compliance of and shall
ensure strict compliance by it sub-Contractors, servants or agents of
all labour and other laws, rules or regulation having the force of law
affecting the relationship of employer and employee between the
Contractor/Sub-Contractor and their respective employees.
23.2 The Contractor and Sub-Contractor(s) of the Contractor shall obtain
authority(ies) designated in this behalf under any applicable law, rule
or regulation including but not limited to the Factories Act, ESI Act,
Employees Compensation Act and Contract labour (Abolition &
Regulation) Act, 1970 (insofar as applicable) any and all such
license(s) consent(s), registration(s) and / or other authorisation (s)
as shall from time to time be or become necessary for relative to the
execution of the work or any part or portion thereof or otherwise in
connection with performance of the Contract, and shall at all times
observe and ensure due observance by the Sub-Contractor,
servants and agents of all terms and conditions of the said
licence(s), regulation(s) and other authorisation(s) and laws, rules
and regulations applicable thereto.
23.3 Nothing in the Contract document stated shall anywise constitute
any workman/ employee of the Contractor or any Sub-Contractor as
or to be workman/ employee of the Company, or place obligation or
liability in respect of any such workman/ employee upon the
23.4 Without prejudice to any other liabilities or obligation of the
Contractor relative to Sub-Contractors in terms hereof or otherwise,
the Contractor shall indemnify and keep indemnified the Company
from and against all actions, claims, demands and liabilities
whatsoever under and in respect of the breach of any other
provisions and / or against any claim, action or demand by any
workman / employee of the Contractor or any Sub-Contractor and /
or from any liability anywise to any workman / employee of the
Contractor or any Sub-Contractor under any law, rule or regulation
having the force of law, including but not limited to claims against the
Company under the Employee’s Compensations Act, 1923, The
Employees Provident Funds Act, 1952, and/ or The Contract Labour
(abolition & Regulation) Act, 1970. Contractor has to comply with all
applicable Provisions Under New Labour Codes time to time Notified
by the Government.
24. SAFETY REGULATION, ACCIDENT AND DAMAGE:
24.1 The Contractor shall be responsible at his own cost in and relative to
performance of the work and Contractor to observe and to ensure
observance by his Sub-Contractors, agents and servants of the
provisions of Safety Code as hereinafter appearing and all fire,
Safety and Security regulations as may be prescribed by the
Company from time to time and such other Precautions, measures
as shall be necessary.
24.2 All necessary personal safety / protection equipment as considered
adequate by the Engineer- in-Charge / Officer- in-Charge should be
made available for the use to deployed manpower on the site and
maintained in a condition suitable for immediate use and the
Contractor should take adequate steps / monitor continuously for
proper use of such equipments by those concerned.
24.3 The contractor shall submit immediately in writing about accidents
occurred during the work execution to Company’s Fire & Safety and
HR deptt under intimation to Engineer- in-Charge / Officer- in-
25. SECURITY REGULATIONS:
25.1 The contractor shall ensure for strict compliance with the security
regulations / directives of the Company & shall also ensure that the
manpower deployed follows the rules during Entry / Exit as well as
while they are in the Company premises. All the deployed manpower
shall prominently display the Entry Cards while they are in the
premises of the Company.
25.2 If the Company finds any person / persons deployed by the
contractor to be undesirable the contractor shall immediately
withdraw such person / persons and substitute him / them. The
decision of the Company for undesirability of the persons deployed
by the contractor shall be final and binding on the contractor.
26. QMS, EMS, OHSMS & EnMS COMPLIANCE:
The Company is certified for Quality Management Systems, Environment
Management System, Occupational Health & Safety Management System
and Energy Management System. All the persons (including Contractors,
Supervisors & their workers) working at GNFC or on behalf of GNFC are
required to comply with the QEHSEn guidelines in addition to other
applicable labour laws, safety laws as well as legal compliances.
27. OTHER TERMS:
GNFC reserves its right to enter into parallel Contract/s with other Bidders.
In case, if contract is awarded and bidder fails to execute the same in line
with Conditions of Contract given in the contract, GNFC reserves its right to
source such services from any other source and extra financial implication,
if any, shall be to the defaulting Contractor’s risk and cost.
28. GENERAL CONDITIONS OF CONTRACT: All other terms conditions, not
covered to the extent as provided above and in Annexure attached hereto
shall be as per General Conditions of Contract (GCC) attached and marked
as Annexure – V, which is an integral part of this tender document.
29. GENERAL OBLIGATIONS OF THE CONTRACTOR:
29.1 The Contractor shall deploy suitably qualified and experienced
manpower in adequate numbers to carry out the job as per the
scope of work efficiently, safely & systematically depending upon the
requirement of the Company from time to time.
29.2 The Contractor shall deploy only such persons:
a) who are above the age of 18 (eighteen) years and below the
age of 60 (sixty) years.
b) who are physically sound, well behaved, trustworthy and
c) who are medically fit, with proper eye sight (with or without
d) who can read and write Gujarati / Hindi.
e) who have clean habits and are teetotallers.
f) Who have no criminal record & have authentic ID & birth date
29.3 The Contractor shall deploy Supervisors in adequate numbers to
organize job related activities, supervise closely the job to be carried
out by his deployed manpower as well as to ensure their safety &
security. The contractor / supervisor shall obtain details of jobs to be
carried out from Engineer-in-Charge / Officer-in-Charge & shall
update progress of jobs to concern.
29.4 The Contractor shall solely and exclusively responsible for engaging
and employing the persons for execution of this contract. The
company shall have no liability whatsoever concerning workers. The
Contractor shall indemnify the company against all losses or
damages or liabilities arising out of or in course employing person or
out of their relationship.
29.5 The Contractor shall be responsible and liable for payment of
salaries, wages & other lawful dues of his personnel as
EMPLOYER. The Contractor shall maintain proper books, accounts,
records & documents and comply with all statutory rules &
regulations applicable to the Employer as CONTRACTOR.
29.6 The Contractor shall make payment of wages and other dues to his
personnel on scheduled date but not later than 10th of each
calendar month. The Contractor shall also certify that all personnel
employed have been paid the minimum wages as prescribed by the
Government and all other laws are complied with and that there is
no violation of any applicable laws and no case of litigation is
instituted or pending before any authorities.
29.7 The Contractor shall disburse the monthly wages to his personnel
deployed at our site through bank only, disbursement of wages in
cash shall be not be allowed in any case. The Contractor shall
submit soft copy of file containing full name of worker, his bank
account no. and name of bank & branch as well as PF account /
UAN no., before first wage disbursement to operating department &
29.8 The Company shall be entitled to deduct directly from the bills to be
paid to the contractor any sum payable by him and which sum/sums
the Company is required to pay as Principal Employer on account of
contractor’s default in respect of all liabilities referred to in above
clauses and loss, damage etc. suffered by the Company due to
contractor’s negligence.
29.9 The successful contractor shall arrange (i) to comply with rules and
regulations define under ESI Act and Labour License before
commencement of work (if applicable) (ii) to get verified the wage
sheet from HR Dept. before disbursement of wages and ensure
wage disbursement through Bank on the schedule date notified by
HR dept, (iii) to submit copy of wage sheet along with bank letter
showing transfer of wages as well as PF challan along with ECR
before 20th of every month (iv) to execute agreement on stamp
paper for wage disbursement through bank.
29.10 The contractor shall provide in writing the list of persons to be
deployed by him to Security department of the Company in
prescribed format for allowing them to enter in to Co.’s premises to
carry out subject job. The contractor shall also collect the ID Proof,
Date of Birth proof, Present & Permanent address proof, emergency
contact nos. and shall maintain the proper record.
29.11 On expiry of the validity of the Contract or in the event of the
company terminating the contract prematurely, the contractor shall
ensure that all the entry passes issued to his workers are collected
back and deposited with the Security Department. The Contractor
shall be solely responsible for misuse of any of the entry pass issued
to his workers and the final payment if any, applicable shall be made
after confirmation of the Security department to that effect.
29.12 The contractor shall obtain License for deployment of workers from
the appropriate authorities & also get insured them under W. C.
policy as per the provisions of laws and shall submit copies thereof
to the Company.
29.13 All tools & tackles, safety items etc. which are required to carry out
the work safely shall be arranged by you as & when required, except
where some special tools & tackles are being provided by the
29.14 The Contractor shall provide free of charge all required safety
equipment / Personal Protection Equipment to the deployed
manpower & ensure that they use the same while carrying out the
job. If required for specific job, the contractor shall approach
Engineer in-charge / Officer in-charge for special tools/ tackles and
safety appliances if required. Any loss or damage to the specialized
tools and tackles provided by the Company to the contractor due to
deliberate or negligence of the deployed manpower shall be
recovered from the payment due to contractor at the rate as decided
by the Company.
29.15 All safety precautions while executing the contract shall be strictly
observed by the contractor. Corrective measures as penalty for non
- compliance and eventual termination of contract followed by de-
registration, as approved contractors / vendors are the
consequences of repeated non - compliance and negligence.
29.16 Company is committed to safety of all the persons working inside the
factory, including contractors/agencies/their supervisors /workers /
sub contractors / agents, etc. Health & Safety Policy of GNFC is
enclosed herewith at Annexure–‘VII’ which demonstrates GNFC's
strong commitment to safety. In this regard, the Company shall
imparting necessary job related training. The Contractor shall be
required to spare the deployed manpower to participate in such
29.17 The Company is certified for Environment, Occupational Health &
Safety, & Quality Management System, under which there are good
number of legal and other requirements to be fulfilled. In this regard,
the Company shall imparting necessary job related training. The
Contractor shall be required to spare the deployed manpower to
participate in such programme. We enclose herewith a copy of
combined “Environment Policy” “OH & S Policy” and “Quality Policy”
of the Company as well as EHS Guidelines to Contractors at
Annexure–‘VIII’ & Annexure–‘IX’.
29.18 The Contractor shall be fully liable for any delay, loss or injury
caused directly or indirectly by any act or omission on the part of his
labourers, agents or persons. In case, if any damage, loss or injury
is caused, the Contractor shall be liable to compensate for the same
as per the decision of GNFC, which shall be final and binding.
29.19 Company, however, reserves its right to terminate the contract
prematurely without giving any notice or any compensation
whatsoever, in case of failure by the contractor to discharge the jobs
under the scope of the subject contract to the satisfaction of the
Company or in case of misbehaviour/indiscipline on the part of the
Contractor himself or his labourers or agents or persons. The
decision of the Engineer-in-charge / Officer-in-charge of the
Company in this regard shall be final and binding upon the
29.20 In case the contractor fails to discharge his obligations in time, then
the Company shall get the services of other contractor/agency at
contractor’s risk and cost. The expense towards this shall be
recovered from the contractor. The decision of the Company shall be
final in this regard.
A. MAINTENANCE OF AVENUE TREES/SHRUBS:
(Item of work at Sr. No. 1 of the ‘Schedule of Rates’)
1. Watering, Weeding & Earthing up of the Plants to be done as per the
requirement or as directed by the Officer-in-charge of the company.
2. Application of Farm Yard Manure (FYM) and Fertilizers and cleaning the
area surrounding the Trees / Plants / Shrubs to be done as and when
required and / or as per requirement of the Company.
3. The work, inter alia, includes pruning of unwanted branches and stacking
wherever required and any other work pertaining to the maintenance of
Avenue Trees and Flowering Shrubs as per the requirement of the
Company. Most of the Plantation sites are away from the source of water
and therefore, the Contractor will have to arrange for a suitable system for
carrying water to the Plantation sites.
4. The rate should be quoted for maintenance of Per Plant / Month.
B. MAINTENANCE OF LAWN/GARDENS:
(Item of work at Sr. No. 2 (A) & 2 (B) of the ‘Schedule of Rates’)
Maintenance of gardens including lawns, shrubbery, flower beds, ground
covers, ornamental saplings, hedges, rockery, seasonal flower beds, if any,
would inter alia include the following:
1 Hoeing, shaping the hedges by pruning/trimming the ornamental saplings,
shrubbery, flower beds, ground covers, etc. as and when required.
2 Sweeping the lawns from time to time for removal of dry leaves, twigs etc.
particularly under the trees so as to keep the entire area neat and clean.
3 Collection and removal of debris and garden waste to specified location at
least twice in week or as and when required by the Company, by engaging
a tractor along with trailer and adequate number of labourers. For any
reason, if the garden waste could not be disposed of on the specified day,
the same should be disposed of on the next day only. This will be allowed
only in exceptional cases. However, If the delay is more than one day,
penalty as may be deemed fit shall be recovered from the payments due of
the Contractor.
4 Mowing of the lawn twice in a month or as and when required.
5 Watering as required so as to keep the lawn green all the time. Watering
the lawns/ gardens is to be done as may be required during the monsoon
months/Sundays/holidays also and/or as per the requirement of the
Company from time to time.
6 Keeping the area under the trees in the gardens/lawns neat and clean.
7 Weeding of the lawns/gardens shall be carried out as may be required from
time to time. However, weeding shall have to be carried out at least twice a
month. For the purpose, adequate number of labourers with suitable tools
& tackles shall be arranged by contractor as and when required. This is a
part of garden/lawn maintenance activity and hence no separate payment
shall be made for the weeding activity.
8 The Contractor shall, at his own cost, arrange for the required no. of
labourers, leak proof hose pipes, lawn mower machines with cables of
good quality with proper Safety devices, shears and other tools & tackles
required for carrying out the garden maintenance job.
9 In case the maintenance work i.e. mowing, watering and weeding in any
area is found unsatisfactory or below the standard, suitable penalty shall be
levied for the deficiency (ies) observed. The Contractor, on being informed
about such poor quality of work, be required to attend to such areas
immediately and carry out the work to the satisfaction of the Officer-in-
charge of the work. However, no payment whatsoever shall be made to
Contractor for such areas which are attended to only after the same is
brought to the notice of the Contractor by the Officer in-charge of the work.
10 During the currency of the Contract, if digging and/or excavation is done in
the lawn/garden area for laying cables, pipes etc. and also due to the
exigencies of work related to the operation and maintenance of the plants,
the same shall be rectified by the Contractor free-of-charge and restoration
of the lawns/gardens in such areas shall be done by the Contractor without
any additional charges.
11 Any other job or jobs pertaining to maintenance and beautification of
lawns/gardens which is/are not specifically mentioned herein above and
which in the opinion of the Company is necessary to ensure proper
maintenance of the gardens/laws, the same shall be carried out by the
Contractor without any additional charges.
12 Application of yellow soil as required. The required quantity of good quality
yellow soil shall be arranged by the Contractor for which, the payment shall
be made on m3 basis and no separate/extra charges shall be payable for
applying the Yellow Soil.
13 Application of well decomposed cattle manure, fertilizers, etc. as required.
The required quantity of Farm Yard Manure (FYM) of good quality shall be
arranged by the Contractor for which, the payment shall be made on M3
basis and no separate/extra charges shall be payable for applying the Farm
14 Maintenance of garden shall include maintenance of Duck House and
Lotus Pond in the Aniline-TDI Complex.
15 In case of non-execution of any of the above mentioned items of
activities related to maintenance of lawns/gardens during any month, no
payment shall be made even for the partial work, if any, done during the
month in a particular lawns/garden area.
The Contractor shall maintain the lawns/garden as per the measured
quantity; however, the quantity may increase or decrease by up to 10%.
16 The area of garden/lawns including flower beds, shrubbery, hedges etc.
maintained shall be measured in M2.
17 The rate should be quoted for Per M2 Per Month of lawn/garden to be
C. MAINTENANCE OF HORTICULTURE NURSERY:
(Item of work at Sr. No. 03 of the ‘Schedule of Rates’)
The Contractor shall maintain the Nursery of around 1200 M2 at ANI-TDI
Complex as per the Company’s requirement. The work of up keeping
/maintaining the Nursery, inter alia, covers the following activities:
1 Up keeping of the Nursery area from fallen leaves, weeds etc. as per
2 Multiplication work such as gouty making, preparation of cuttings, bulbs,
suckers etc., planting them in pots or beds as per the requirement of
3 Application of Geru to flower pots as and when required or on the occasion
of functions. Required quantity Geru & brush shall be arranged by the
Contractor at his cost.
4 Preparation of Nursery beds as per the requirement of the Company.
Sowing flower seeds, planting, cutting etc. and maintenance till they are
taken for planting elsewhere.
5 Irrigating the flower pots, Cactus beds and Nursery beds as and when
required. The Water outlets as may be required shall be provided in the
nearby areas, as far as possible.
6 Application of well decomposed Farm Yard Manure (FYM) of good quality
shall be arranged by the Contractor for which, the payment shall be made
on M3 basis and no separate/extra charges shall be payable for applying
the Farm Yard Manure.
7 Application of Yellow Soil of good quality shall be arranged by the
Contractor for which, the payment shall be made on M3 basis and no
separate/extra charges shall be payable for applying the Yellow Soil.
8 Spraying of insecticides, pesticides and fungicides as and when required or
as directed by the Officer-in-charge to keep the plants free from pests and
diseases. Required quantity of the prescribed pesticides and fungicides
shall be arranged by the Contractor at his cost.
9 Potting, depotting, repotting etc. of the plants and display of flower pots
during functions.
10 Any other work pertaining to Nursery, sale of plants, raising of forest
seedling/saplings and preparation of beds as per the requirement of the
Company from time to time.
11 For raising of forest seedlings/saplings, the required quantity of seeds and
polyethylene bags will be supplied by the Company.
12 Required tools and tackles shall be arranged by the Contractor. The rate
should be quoted for lump sum basis per month.
D MAINTENANCE & PLACEMENT OF POTTED PLANTS:
(Item of work at Sr. No. 04 of the ‘Schedule of Rates’)
1 The work of maintenance of potted indoor plants, flowering shrubs and
decorative foliage of all sizes includes necessary watering, hoeing,
manuring, stacking, geru painting, trimming, cleaning, including placing
them in various offices irrespective of the level of the floors in which such
offices are located, replacing them with fresh plants once in a week and
putting back the old ones to the Nursery as per the requirement of the
Company from time to time, with required no. of labourers and tools.
2 Maintenance & placement charges shall be payable only for the number of
plants actually taken away from the Nursery for placement in various
offices. At present, there are around 800 nos. of potted plants of which
only 33 nos. are used in the offices. However, the no. of potted plants to be
placed may vary from time to time. The rate should be quoted for per
potted plant per month.
E. PROVIDING TRACTOR TRIP SERVICES:
(Item of work at Sr. No. 5 of the ‘Schedule of Rates’)
1. Providing tractor services with trailer for movement of plants and other
horticultural materials or any other materials from one place to the other,
both inside and outside the Company’s premises.
The scope of work shall include rendering services of a tractor of the
capacity of 35 HP or more with trailer. The rate shall include cost of diesel,
oil and other incidental expenses for the tractor, trailer etc. Contractor shall
ensure having valid RTO documents like RC Book, PUC Certificate,
Fitness Certificate and full comprehensive insurance coverage for the
tractor & trailor. The driver should have valid RTO license for heavy
vehicle. The Rate should be quoted for Per Trip of services to be rendered.
F. INITIAL DEVELOPMENT OF LAWNS/GARDENS:
(Item of work at Sr. No. 6 of the ‘Schedule of Rates’)
1 Digging of soil to a depth of 6" (Six inch) manually or mechanically
depending upon the site condition and removal of all debris whether lying
mixed with the soil or otherwise, roots of trees, big stones and other
unwanted materials from the site including loading, transportation and
unloading at a designated place as directed by the Officer in-charge of the
2 Breaking the clods, cleaning, leveling, dressing up of the area to make the
ground suitable for planting lawn with all tools, tackles etc. as per the
requirement of the Company.
3 Planting grass with maximum 6 cms. spacing either side, including watering
the lawns as required during the period of development. Lawn is to be
arranged by the Contractor from the existing points at Company's premises
or other places including transportation, labour etc. as directed by Officer-
in-charge of the work.
4 The plant materials, viz. Flower Seedling, Seeds, Pots, Avenue Trees,
Ornamental Saplings, Shrubs, Stump etc. as may be required shall be
issued by the Company free-of-charge.
5 Collection of flower seedlings, avenue trees, ornamental saplings etc. from
Plant Site/Township Nursery or any other place and planting the same
wherever required and as directed by the Officer-in-charge of the work.
This includes watering the plants as required during the course of
6 Application of yellow soil as per requirement. The required quantity of good
quality yellow soil shall be arranged by the Contractor for which, payment
shall be made as per M3 basis on actual measurement. However, no
separate charges shall be payable for application of the same.
7 Application of well decomposed cattle manure, fertilizers etc. as per the
requirement. The required quantity of good quality Farm Yard Manure shall
be arranged by the Contractor for which, payment shall be made on M3
basis on actual measurement. However, no separate charges shall be
payable for application of the same.
8 Planting of hedge materials, flowering shrubs, avenue tree seedlings,
preparation of hedges of plants, circles/pockets of avenue trees, flower
beds etc. are required to be established as per the advice of the Officer-in-
charge of the work.
9 Watering the lawns, flower beds, avenue trees, ornamental saplings etc. as
may be required shall be done by the Contractor during the development
10 Mowing and rolling the lawns, trimming/pruning the avenue trees, hedges,
flower beds, ornamental saplings/shrubs etc. may be done as required
during the period of development stage.
11 Any other jobs pertaining to initial development of the garden which are not
specifically mentioned herein above and which, in the opinion of the
Company, is necessary to complete the proper development of garden.
The rate would include maintenance of the garden/lawns so developed for
a period of 3 (three) months from the date of completion of the
development work.
12 The area developed with lawns/gardens including flower beds, shrubbery,
hedges, avenue trees, ornamental saplings etc. if any, shall be measured
in M2. The rate should be quoted for Per M2 basis.
G. CUTTING AND REMOVAL OF WILD GRASS:
(Item of work at Sr. No. 7 of the ‘Schedule of Rates’)
1 Cutting of wild grass/small bushes at ground level from the Company's
premises, both inside and outside the Plant area, Corporate Building,
Tissue Culture Laboratory Complex, Demonstration Farm area, ANI-TDI
Complex, Gadkhol Reservoir complex etc. and its removal to the desired
place by engaging tractors with trolley as per the requirement of the
Company. Contractor shall arrange for required number of labourers, tools
& tackles etc. for cutting, collecting, loading, unloading and disposal of the
wild grass/bushes. The rate should be quoted for per M2 of area cleaned.
2 The cut grass/bushes/branches should be disposed of at specified place.
The same should be lifted and disposed of within 2 to 3 days. However, if
the delay is more than 7 days, penalty, as may be deemed fit shall be
levied and recovered from the payment due to the Contractor.
H. SUPPLY AND APPLICATION OF FARM YARD MANURE:
(Item of work at Sr. No. 8 of the ‘Schedule of Rates’)
1 Supply and application of well decomposed Farm Yard Manure (FYM) of
approved quality for gardens/lawns/flower beds etc. The quantity will be
measured based on the volume of the carriage i.e. Truck or tractor in
which the Farm Yard Manure is brought in. The requirement shall be
based on the development and maintenance needs of the garden
areas. The Contractor shall be informed verbally of such requirement
(three) days in advance.
2 The rate should be quoted for Per M3 basis.
I. SUPPLY AND APPLICATION OF YELLOW SOIL:
(Item of work at Sr. No. 9 of the ‘Schedule of Rates’)
1 Supply and application of good quality yellow earth free from stones and
clods, for the gardens, lawns and flower beds etc. The quantity will be
measured based on the volume of the carriage i.e. Truck or tractor in
which the yellow earth is brought in. The requirement shall be based on
the development and maintenance needs of the garden areas. The
Contractor shall be informed verbally of such requirement 3 (three) days in
2 The rate should be quoted for Per M3 basis.
J. TRACTOR WORK:
(Item of work at Sr. No. 10 of the ‘Schedule of Rates’)
1 The Contractor shall provide the services of a tractor of the capacity of
HP or more with cultivator, plough, disc harrow, supdi, planker, etc. for
ploughing, harrowing, earth work, leveling etc. as and when required. The
rate should include cost of diesel, oil and other incidental expenses for the
2 The contractor shall ensure having valid RTO documents like RC Book,
PUC Certificate, Fitness Certificate and full comprehensive insurance
coverage. The driver should have valid RTO license for heavy vehicle. The
rate should be quoted for per hour basis. For Tillage work additional tractor
with driver is required.
K. RENDERING OF LABOUR SERVICES:
(Item of work at Sr. No. 11 of the ‘Schedule of Rates’)
1 For rendering services of miscellaneous nature which are not covered in
the items of work listed in the Schedule of Rates (E-tender) hereto and if in
the opinion of the Company, such services are required for achieving the
completeness and quality of the Horticultural activities viz. cutting of grass
from area which are scattered and/or is/are not feasible to measure,
bushes, tree branches, removal of fallen trees & leaves, twigs or other
miscellaneous work related to horticultural activities that may arise during
the operation of the Contract, the Contractor shall be required to deploy
manpower, as and when required basis, in the required strength for which
one day advance verbal notice shall be given. The rate should be quoted
for per manday.
2 As regards Item No. 11 of (SOR), the payment will be made as per
prevailing rate of minimum wage applicable to unskilled category + 34.69%
Labour Liability.
OTHER TERMS & CONDITIONS APPLICABLE TO CONTRACT
1) TOOLS & TACKLES:
To undertake the Scope of work at Annexure-III on day to day / regular
basis, following tools & tackles has been required:
Electrically operated lawn mower machine (Roller type) with necessary
safety devices and required cables – 05 Nos. (03 for Plant & 02 for ANI-TDI
Complex) – Ambica / Kamlesh / Sharpex / Falcon or equivalent brand.
Electrically operated Ghanti machine (Rotary Lawn Mower) with necessary
safety devices and required cables – 02 Nos. for Plant Area – Ambica /
Kamlesh / Sharpex / Falcon or equivalent brand.
Manual operated hedge cutter – 05 Nos. (03 for Plant & 02 for ANI-TDI
Complex) – Falcon / Sharpex brand
Secateurs – 08 Nos. (04 for Plant & 04 for ANI-TDI Complex) - Falcon
professional model.
Manual Operated Branch Cutter for Trimming of Shrubs – 05 Nos. (03 for
Plant & 02 for ANI-TDI Complex) – Sharpex / Falcon or equivalent brand.
Manual Operated Magic Pruning Saw – 03 Nos. (02 for Plant & 01 for ANI-
TDI Complex) – Sharpex / Falcon or equivalent brand.
Enough quantity of garden hosepipes required for watering in garden area,
and no leaky hosepipes will be allowed in any case. Each pipe should be of
one inch (1”) diameter and 30 Mtr. Length garden pipes - 55 nos. for Plant
Area and 30 nos. for ANI-TDI Complex of standard quality. Pipe should be
replaced as per requirement.
Tractor and trailer services with driver of the contractor with capacity of
HP or more on daily basis. (Valid Driver License, Spark Arrestor and
required documents of Tractor like RC Book, Valid insurance policy, PUC,
Fitness Certificate etc. is Compulsory). For Tillage work additional tractor
with driver is required.
To keep & maintain minimum stock of Insecticides, Fungicides, Pesticides,
Herbicides, Termite Control Powder (01 Ltr. Insecticide/Pesticide, 01 Kg.
Fungicide, 01 Kg. Phorate, 01 Ltr/Kg. Herbicide, 01 Kg. Termite Control
Powder) each for garden area of Plant & ANI-TDI Complex.
Manual operated Aspee make Hi-Tech spray pump – 03 Nos.
Required quantity of Geru & Brush for potted plants maintenance in
Nursery & 04 Nos. of Water Can with sprayer of 10 Ltr. Capacity are to be
required & Plastic Piece & Jute Rope for Gootee Preparation.
In addition to above, other tools & tackles like Sickle, Axe, Dhariya, Kudali,
Paliya, Pickaxe, Tagara, Pawda, Panjeti, Vansi, Hand Cultivator etc.
required for execution of the job. Quantity as per the company’s
requirement from time to time.
Other tools & tackles as per the requirement of the company from time to
All required essential tools and tackles, Safety items / Personal Protection
Equipment (PPE) etc. will be arranged by the contractor, except some
special tools and tackles (hydra, crane, ladder etc.) to be provided by the
company. In general contractor shall brought tools & tackles like lawn
mower machines, Ghanti machines with cable and proper safety device,
standard quality garden pipes for watering purpose, shears, hedge cutter,
branch cutter, long Cutter, Magic Pruning Saw, sickle, Axe, Dhariya, Kudali,
Pickaxe, Panjeti, Tagara, Pawda, Vansi, Hand Cultivator etc. as may be
required to execute the job. Tractor-cum-trailor of the contractor of the
capacity of 35 HP or more with spark arrestor having valid RTO documents
like RC Book, PUC Certificate, Fitness Certificate and full comprehensive
insurance coverage. The driver should have valid RTO license for heavy
vehicle. In case contractor fails to provide the above items, his bills will be
hold up to compliance of the same.
1) All the jobs shall be carried out as per the requirement and to the
satisfaction of GNFC.
2) Supplying, application and/or spraying of the insecticides, pesticides,
fungicides, herbicides as and when required or as directed by the Officers
in-charge to keep the plants free from pests and diseases shall be carried
out by the contractor. For such activities, insecticides, pesticides,
fungicides, herbicides, sprayers and dusters of standard quality shall be
arranged by the Contractor at his cost and shall maintain a minimum stock
of insecticides, pesticides, fungicides, herbicides in the store at Site.
3) The entry passes for the contract labourers will be issued by the Security
Department of the Company only after verification of required documents
by HR Department of the Company.
4) The rates under the contract shall be applicable to the garden/lawn area at
the Company's Reservoir Site at Gadkhol also which is about 12 kms.
away from the Plant Premises at Narmadanagar.
5) The Contractor shall have to strictly observe all the safety precautions as
may be necessary for smooth execution of the work and shall be required
to provide necessary safety equipment viz. safety helmet, safety belts,
hand-gloves, gum/safety shoes, face mask etc. to his labourers from time
to time. The entire responsibility for the safety of your workers shall be on
you. The Contractor shall be required to provide ELCB/MCB switches on
the Lawn Mowers and spark arrestors on his diesel vehicles.
6) In addition to the manpower engaged for the regular activities of
maintenance of garden at Item Sr. No. A, B, C, D & E of the Annexure – III
(Scope of Work) hitherto, contractor shall be required to deploy/redeploy
adequate labour force for execution of the jobs mentioned at Sr. No. F, G, J
& K of the Annexure – III (Scope of Work) as and when such jobs are
required to be undertaken. In other words, the item of work listed at Sr. No.
F, G, J & K not being daily activities or routine jobs, contractor shall be
required to bring in the requisite number of additional labourers as and
when such jobs are required to be undertaken and shall not be allowed to
make the use of the labourers already deployed on regular activity listed at
A, B, C, D & E of the Annexure – III (Scope of Work).
7) The Company reserves its right not to operate at all or partially operate any
of the items of work listed in the Schedule of Rates (SOR) during the
Contract period and the Company shall not be obliged to entertain any
complaint or claim whatsoever in this regard from the contractor.
8) The quantity indicated against each item in the Schedule of Rates (SOR) is
only tentative and is likely to increase/decrease to any extent at the starting
of the contract or during the currency of the Contract and the Company
shall not be obliged to entertain any complaint or claim whatsoever in this
regard from the Contractor.
9) The periodicity of the job mentioned in the Scope of Work at Annexure – III
shall be decided by the Officer-in-charge.
10) The Company reserves its right to delete or add any item, decrease and/or
increase the quantity to any extent.
11) The contractor shall carry out all works which are ancillary to and/or
connected with horticultural activities and other stray jobs even if such
works are not covered under the ‘Scope of Work’ hereunder so as to
ensure tidiness of the Company’s Premises and make the premises look
beautiful and impressive.
12) If and when required, contractor shall engage labourers for irrigating the
lawns and also for attending to other Horticulture related works late in the
evening hours and on Sundays/Holidays. No additional payment/overtime
charges whatsoever shall be payable for such extra hours of work including
Sundays and Holidays.
13) To fulfill the obligations and execute the jobs as per the Scope of Work
mentioned in Annexure – III, contractor shall engage, as per the
requirement from time to time, adequate manpower possessing the
required background and well trained supervisory staff for execution of the
job, if awarded.
The contractor shall also be required to engage tractor and trailer services
with driver for removal of the garbage and garden waste as per the
instruction of Officer in charge to ensure that the work is carried out in line
with the Scope of Work mentioned in Annexure – III.
14) The Company shall explore the possibilities of introducing mechanization in
the Horticulture activities so as to ensure speedy completion of the work
besides achieving better efficiency. This would ultimately result in reduction
in the manpower by bringing down the no. of labourers required to be
engaged by contractor on the activities under the Scope of Work.
Contractor shall have no objection in reducing the quantity of any or all of
the items of work under the Contract nor reduction in the labourers required
15) The contractor shall provide tools & tackles within 05 days on receipt of the
LOI. In case of failure to provide tools & tackles within time limit, suitable
penalty as may be deemed fit shall be levied. Any delay of work due to non
availability of tools and tackles will be responsibility of the contractor.
16) The Contractor shall not undertake any Horticultural activities on Sundays.
Similarly, no such activities shall be carried out on Republic Day and
Independence Day. The shortfall in labour strength occurring due to
festivals viz. Holi (2nd day), Rakshabandhan, Diwali, New Year, Bhaibij etc.
shall be made up by deploying extra number of labourers during the
currency of the month. No extra payment shall be admissible for the
labourers engaged on Sundays and other working days to make up the
GENERAL CONDITIONS OF CONTRACT
http://mygnfc/mygnfc/images/finance/VR4U/FORM/GENERAL%20CONDITIONS
%20OF%20CONTRACT%2028122016%20(2).pdf
(Available with Department)
CONDITIONS OF LABOUR LAWS TO BE COMPLIED BY THE CONTRACTOR
1.0 Labour Laws:
The contractor shall be solely responsible for strictly following all Labour
Laws, Industrial Laws, Factories Act, and such other laws which are
applicable from time to time including but not limited to the notification
amendments or additions which are made to these laws during the period of
contract. The contractor shall also be responsible for various levies of State
Government, Government of India or any Statutory Body. The contractor
shall have to, at his own expenses, comply with labour laws and keep the
company indemnified in respect thereof. Some of the major liabilities under
various labour and industrial laws which the contractor shall comply with as
under, but not limited to:
1.1 The contractor shall submit all relevant and required documents including
but not limited to the following documents to HR Deptt. of GNFC before
commencement of the job.
i.) Copy of the documents showing legal status of the firm.
ii.) Copy of the documents showing allotment of PF Code No. by the RPFC
iii.) Copy of the documents showing allotment of ESI Code No. by the ESI
iv.) Copy of receipt / cover note / insurance policy obtained to comply with the
provision of Workmen Compensation Act,
v.) Copy of challans showing remittance of security deposit and license fee
to obtain the labour license as per the provisions of The Contract Labour
After verification of above stated documents, entry permits for the contract
labours will be issued by Security Deptt. to the contractor.
1.2 The contractor shall submit application to the Licensing officer to obtain the
license as per the provisions of the Contract Labour (R&A) Act, 1970 before
commencement of the job after remittance of license fee and deposit as
i.) Payment of deposit in respect of each contract labour at the rates
prescribed by the Govt., with the office of Commissioner of Labour,
Ahmadabad as per the Contract Labour (Regulation and Abolition) Act,
ii.) License fee as prescribed under the Contract Labour (Regulation and
Abolition) Act and rules framed there under depending upon the number
of workman employed by the contractor.
The contractor shall also submit copy of labour license to HR Deptt. of GNFC
within 15 days from the date of commencement of work.
1.3 The contractor shall not employ any contract labour whose age is below
years. However, you shall not employ any person who has reached the age
of superannuation (i.e. 60 Years of Age) under “The Bombay Industrial
Employment (Standing Order) Rules, 1959 (As applicable in State of
1.4 The contractor shall also maintain valid labour license under Inter State
Migrant Labour Act if required under this law and shall comply with the
provisions of interstate migrant Labour Act.
1.5 The contractor shall allow women employees to work in factory between the
hours of 06.00 a.m. to 07.00 p.m. only.
1.6 The contractor shall obtain photo identity cards cum entry passes for all his
labours and supervisors as per the security regulation of the company in
force from time to time and no person shall be allowed entry without such
1.7 The contractor shall make payment of contribution by way of employees,
contribution towards provident fund, Pension Scheme, Deposit Linked
Insurance Scheme, Administrative Charges, etc. at the rates made
applicable from time to time by Government of Gujarat / Government of India
or other Statutory Authorities.
1.8 The contractor shall make payment of contribution by way of employees,
contribution towards Employee State Insurance at the rates made applicable
from time to time by Government of Gujarat / Government of India or other
Statutory Authorities.
1.9 The contractor shall provide safety appliances / articles / equipments at his
own cost to his labours.
1.10 The contractor shall pay extra wages for overtime to the labours as per
provisions of the Factories Act,
1.11 The contractor shall pay the wages as fixed by him or rates fixed under the
Minimum Wages Act from time to time, whichever is higher. The wages of
every contract labour employed by him under this contract shall be paid by
him before the expiry of 7th day of the month in respect of which the wages
are payable. The payment shall be disbursed through bank only.
1.12 The contractor shall pay bonus to his eligible employees in accordance with
provision of payment of Bonus Act. He shall keep and maintain register as
prescribed under payment of Bonus Act and shall produce before authorized
officers of the Company as and when asked for inspection.
1.13 The contractor shall pay Gratuity to his employees in accordance with
provision of payment of Gratuity Act. He shall keep and maintain required
registers as prescribed under payment of Gratuity Act and shall produce
before authorized officers of the Company as and when asked for
1.14 The contractor shall keep and maintain registers and forms as prescribed
under the Factories Act, 1948, Payment of Bonus Act, 1965, Payment of
Gratuity Act, Contract Labour Act, PF Act, and other Labour Laws in force
from time to time.
1.15 The contractor shall allow his employees to avail paid leave at the rate of
one day for every 20 days of working or shall encash the earned leave as
per the provisions of the Factories Act.
1.16 The contractor shall make payment of retrenchment compensation, notice
pay and other liabilities as per Industrial Dispute Act, any payment to the
contractor's employee arising out of any claim or dispute under Industrial
Dispute Act, 1947 or any other labour laws.
1.17 The contractor shall make payment of compensation in case of accidental
injury in accordance with provisions of Workmen Compensation Act,
For this, the contractor shall take insurance policy for the labours engaged
for this job. The contractor shall also submit copy of insurance policy to HR
Deptt. of GNFC before commencement of work.
1.18 The Company reserves the right to terminate work order if awarded under
this tender enquiry / work order if contractor fails to comply with the labour
laws as stated above and the labour laws which are applicable to his firm
from time to time.
1.19 The contractor shall give his office and residential telephone numbers,
mobile number(s) and addresses to the Company so that in case of labour
trouble etc. the contractor can be contacted.
1.20 The company will be entitled to deduct directly from the bills to be paid to the
contractor any sum or sums payable by him and which sum / sums the
company is required to pay as Principal Employer on account of his default
in respect of all liabilities referred to in above clauses.
1.21 The contractor shall pay Cash Canteen Assistance and Medical Assistance
at the rate of RS. 08.00 AND RS. 04.00 per day respectively. However, CCA
& MA shall not attract any indirect liability on PF, Bonus, Gratuity, OT etc.
The amount of CCA & MA is to be paid to the labourers alongwith wages,
failing which the same shall be deducted from running / pending bill of the
1.22 The contractor shall display notice on his notice board showing the rate of
wages, hours of work, wage period, date of payment of wages, name and
address of Govt. Labour Officer and Inspector under Minimum Wages Act
having jurisdiction. The notice shall be displayed in language understood by
the majority of workers.
1.23 The contractor shall ensure adherence to the provisions of Gujarat Labour
Welfare Fund in respect of his labours from time to time.
1.24 Periodic Medical check-up of the contract labours shall be got done as per
the provisions of The Factories Act. The medical check-up of new
incumbents shall be got done by the contractor and the reports shall submit
to the HR Deptt.
Health & Safety Policy
Annexure – VIII
INTEGRATED MANAGEMENT SYSTEM POLICY
QEHSEn GUIDELINES TO CONTRACTORS
As GNFC Limited, Bharuch is certified for Environment, Occupational Health &
Safety and Quality Management Systems, all the persons (including Contractors,
Supervisors & their workers) working at GNFC or on behalf of GNFC are required
to comply with the EHS guidelines in addition to other applicable labour laws,
safety laws as well as legal compliances as mentioned below:
The Contractor shall strictly comply with the following EHS Guidelines while
working at site. These guidelines form a part of the terms & conditions as
mentioned in our referred contracts.
1. The Contractor is liable to follow Company’s Environment policy, Quality
policy Occupational Health & Safety policy, Health & Safety policy (as per
Factories Act & Rules), Energy policy & policy against Sexual Harassment
of Woman at workplace and will show/submit the records of compliance
whenever demanded.
2. The Contractor shall strictly comply with all the applicable legal
compliances related to work allotted and will maintain the records of it and
will show/submit whenever demanded.
3. To ensure effective enforcement of the applicable legal & other
requirements, the arrangements made by the contractor shall be open to
inspection by GNFC representatives/statutory authorities.
4. The Contractor shall ensure that he does not engage any workman less
than 18 years of age for the work of the company.
5. GNFC strongly opposes sexual harassment and any such behaviour
against women is prohibited by the law as set down in “The Sexual
Harassment of Women at Workplace (Prevention, Prohibition and
Redressal) Act, 2013” and Rules framed there under being The Sexual
Harassment of Women at Workplace Rules.
6. GNFC is Smoking prohibited area.
7. Contractor is required to get labours checked for sound physical health and
fitness to discharge the duties assigned at site effectively including for work
at height or in confined spaces/vessels in case wherever applicable.
Contractor shall be asked to submit fitness certificate of those labour who
do not discharge their duties effectively as found by Site In charge from
certified medical Officer. Wherever workers are employed by contractor for
work at height/confined spaces/vessels, he will ensure that workers are fit
to carry out such jobs.
8. Contractor shall deploy suitable competent persons for carrying out the
specified jobs.
9. Contractor shall ensure that all deployed employees follow the safety
notices / instruction displayed at site.
10. Electricity related work shall be done / performed / installed in conformity
with Indian Electricity regulations and shall employ licensed supervisor /
electricians at site.
11. On the completion/expiry of the work, contractor shall remove all
constructions, scaffoldings, works, piping, wirings, surplus materials,
rubbish and other installations as per the guidance of Site in Charge.
12. Contractor shall perform their work with the material/items competent to the
requisite standards. Scaffoldings will be sound and suitable for the job
compiling with the National standards. Revision 01 Date: 02.09.2016
Compiled by ISO Cell
13. Contractor shall ensure to comply with relevant provision of Safety codes
and shall employ all equipments to protect all works, materials, properties,
structures, equipments, installations, communication systems from
damage, loss or other hazard what so ever.
14. Contractor shall ensure to carry out periodical examination and tests for all
lifting /hoisting equipments and tackles in accordance with the Factories
Act/Rules. A register of such examinations and test shall be maintained.
15. Contractor shall ensure for safe transportation of materials / tools being
carried out by their workman.
16. Contractor shall work in such a way that it will not create disturbance and
inconvenience to GNFC, other contractors, public, adjoining land &
property owners, crops, tress, vegetation, water system.
17. Contractor shall provide first aid facilities.
18. Contractor shall report all incidents to the Site in charge of GNFC.
19. Contractor shall start their work with valid work permit and shall obey the
instruction mentioned in it.
20. Contractor shall not block or obstruct the approach of emergency related
equipments and/or path/walk ways.
21. Contractor shall provide work related suitable safety equipments including
PPEs such as Safety equipments such as safety helmet, safety belt, safety
gloves, glasses, safety shoes/gumboots, earplugs, gas / welding shields /
sets, insulated pliers, ELCB, Line testers and safe electrical equipments
with proper earthing. For welding work, separate earthing cable shall be run
parallel to main cable and to be earthed near welding place.
22. Contractor shall bring 1ph/3ph ELCB & minimum 15 meters suitable rating
flexible cable with their welding machine / grinder / drill machine etc. for
working in plants as per requirement of engineer I/C. ELCB shall be tested
if required by engineer I/C.
23. Contractor shall ensure optimal usage of resources, in particular water,
steam, oil, electricity etc.
24. Contractor shall explain to workers about potential hazards, accidents
emergencies, environmental impact and explain to all, the precautions to
25. Contractor shall arrange to send workers / supervisors for any training
class conducted by the Company for EHS requirements.
26. Contractor shall follow the Various Guidelines as indicated in the respective
Value contract.
27. Contractor shall ensure,
a. whenever possible use natural sources of energy,
b. to use energy efficient tools/equipments,
c. to use of material that does not causes any destruction of natural
resources any air, water pollution and / or land contamination,
d. to eliminate PVC / ODS in Material used,
e. to eliminate use of halogenated flame retardant and
f. to maintain Good Housekeeping at the site, offices and/or
infrastructures within the GNFC premises.
PRICE BID / SCHEDULE OF RATES (SOR)
Sr. Particulars Quantity Unit Rate / Unit (Rs.)
1 Maintenance of avenue 43,600 Nos. Per No. / Month
2 (A) Maintenance of garden 10,05,500 M2 Per M2 / Month
2 (B) Maintenance of garden 4,80,500 M2 Per M2 / Month
(ANI-TDI Complex)
3 Maintenance of 1,200 M2 Lumpsum / Month
Horticulture Nursery
4 Maintenance & placement 600 Pots Per Pot / Month
of potted plants
5 Providing Tractor trip 900 Trips Per Trip
6 Initial development of 5,000 M2 Per M2
7 Cutting and removal of wild 5,000 M2 Per M2
8 Supply & application of 175 M3 Per M3
Farm Yard Manure
9 Supply & application of 700 M3 Per M3
10 Tractor work (Tillage Work) 300 Hours Per Hour
11 Rendering of labour 700 Mandays Per Manday Prevailing unskilled
services Minimum wage +
1 The above rates shall remain firm and fixed throughout the Contract period
including the extended period of one year, if the validity of the contract is extended
by the Company. However in case of change in the rates of Minimum wages during
the contract period, the Lump sum Rate (item no. 1 to 4) shall be revised as per
following formula:
New rate = Old rate + [(Old rate X 0.85 X percentage change in minimum wage)
The rates quoted for Item No. 5 to 10 as above shall remain Firm & Fixed during
entire contract period, including extension, granted if any, irrespective of any
reasons, including rise in the rates of Minimum Wages.
2 As regards Item No. 11, the payment will be made as per prevailing rate of
minimum wage applicable to unskilled category + 34.69% Labour Liability.
Date: Signature with seal of the bidder
COVERING LETTER
(To be submitted on the Letterhead of the Applicant)
Ref: RFP Reference No.
Sub: Submission of Bid in response to the RFP for
1. Having examined the RFP document, we, the undersigned, herewith
submit our Bid/ proposal in response to your RFP Notification
2. We have read the provisions of the RFP document and confirm that we
accept these. We further declare that additional conditions, variations,
deviations, if any, found in our proposal shall not be given effect to
3. We agree to abide by this proposal, consisting of this letter, the detailed
response to the RFP and all attachments thereto.
4. We would like to declare that we are not involved in any litigation that may
have an impact of affecting or compromising the delivery of services as
required under this assignment, and we are not under a declaration of
ineligibility for corrupt or fraudulent practices.
5. We would like to declare that there is no conflict of interest in the services
that we will be providing under the terms and conditions of this RFP.
6. We hereby declare that all the information and statements made in this
proposal are true and accept that any misrepresentation contained in it may
lead to our disqualification.
7. We understand you are not bound to shortlist/accept any or all the
proposals you receive.
8. We would like to declare that we are not blacklisted by any Central/ State
Govt. / PSUs or Local Govt. Department, as on the date of application and
is not debarred from participation in the Tender process.
9. We hereby declare that we qualify and fulfil the eligibility criteria mentioned
Date: Signature of Authorized Signatory___________
Place: Name of the Signatory ______________
Company Name & Seal
AGREEMENT FOR WAGE DISBURSEMENT THROUGH BANK
(To be submitted on the Letterhead of the Applicant)
THIS UNDERTAKING is made on this _____ day of _______________ 20__.
M/s. ________________________________ hereinafter referred to as the Bidder
in favour of Gujarat Narmada Valley Fertilizers & Chemicals Limited, a Public
Limited Company, hereinafter referred to as the Company and/ or GNFC.
Whereas, the Bidder has been issued tender enquiry for ARC/Job Contract to be
Whereas, the Bidder has agreed to provide an undertaking to GNFC that the
Salary/Wages and such other payment as may be required to be made to the
Contract Labourer(s)/Workmen to be deployed by the Successful Bidder/
Contractor who is awarded the aforesaid job at GNFC will be disbursed by him by
cheque or by crediting the salary/wages in the bank account of each of his
Contract Labourer /Workman.
Accordingly, the Bidder /Contractor hereby states, affirms, undertakes and
certifies that if awarded work order under the aforesaid tender enquiry by GNFC.
1. The Successful Bidder / Contractor on award of the Job /Work Order / Contract
will arrange to open the bank accounts of each of his Contract Labourer/
Workman to be deployed at GNFC site, if they are not having Bank Account.
2. The Successful Bidder / Contractor will arrange to disburse the salary/wages
payable to each of the Contract Labourer / Workman to be deployed at GNFC site
by cheque or by crediting the salary/wages in their respective bank accounts.
3. On default, GNFC /the Company shall be entitled to take such actions
(including termination of the Contract) against the Successful Bidder / Contractor,
as may be deemed fit.
Name in full _________________
Annexure – XIII
In the GST regime the below mentioned terms and Conditions shall be applicable:
This Annexure shall form integral part and parcel of Purchase/Work/Service
Order Number __________ dated ____________
► Timely provision of invoices/Debit Note/Credit Note/other applicable
Supplier shall immediately submit the Tax Invoice/ Debit Note/ Credit Note
and / or any other applicable / requisite documents as per the prevailing GST
Law and within the timeline as required under the GST Law so as to enable
GNFC to claim/avail tax benefit/credit and it shall ensure that GNFC must be
able to claim ITC [Input Tax Credit] as per applicable provisions & restrictions
of GST Law. All necessary adjustment entries (Credit Note, Purchase
Returns, and Debit Notes) shall be made within time limit as prescribed under
the GST Law to ensure that no loss or damage is caused to GNFC due to
such adjustment as per GST Law. Any consequence in terms of tax / loss of
input tax credit, interest or penalty thereon on account of delay in raising tax
invoice and/or submission of other applicable documents or adjustment
documents as mentioned above shall be to the account of the Supplier and
the Supplier shall indemnify and hold GNFC good against any such
consequential tax, interest, penalty or any other losses / damages.
HSN / SAC for goods & services respectively shall be specifically included in
the tax invoices as required under the applicable provisions of GST Law. The
manner and digits of such HSN/SAC Code shall be compliant with applicable
provisions of GST Law from time to time.
In case of receipt of advance or refund of such advance received where
invoice against the said advance was not prepared, the Supplier shall raise
the necessary statutory documents. Further, the Supplier shall also raise the
prescribed documentation governing the movement of goods like e way bill,
delivery challan etc. as per applicable GST law provision from time to time.
Supplier shall ensure correct classification of HSN/SAC and it shall
indemnify GNFC against any additional taxes, interest or penalty, if any,
imposed on GNFC due to wrong classification of HSN.
Any known post supply discount shall form part of terms of the
agreement/contract i.e. it is required to be pre-agreed before any supply
takes place and any discount given at the time of sale shall be recorded on
invoice to enable Supplier/ GNFC to claim tax adjustment. In case there is
any pre-agreed post supply discount then the credit note to that effect shall
be issued within time limit prescribed in applicable provisions of GST Law
to enable supplier/GNFC to claim tax adjustments.
► Manner of issue of invoices:
a) Wherever applicable, three copies of the valid tax invoices or other
applicable document as per GST Law shall be issued by supplier in
case of supply of goods (i.e. ‘Original’ for recipient (GNFC),
‘Duplicate’ for transporter and ‘Triplicate’ for supplier), 2 copies of
invoice or other applicable document as per GST Law shall be issued
by supplier in case of supply of services (i.e. ‘Original’ for recipient
and ‘Duplicate’ for supplier). Further, the invoices for supplies shall
be as per the GST Law & clearly bear the GSTIN / UID number along
with Purchase Order/Work Order/Service Order number and date and
wherever the law requires, an Electronic Invoice Reference Number
and QR code from Invoice Registration Portal, for each invoice.
b) Supplier shall be responsible to issue applicable documents for
movement of goods (such as tax invoice, delivery challan, e-way bill,
e-invoice etc) under the GST Law as may be applicable from time to
time and the logistic partner as well as GNFC shall not be liable for
any loss arising due to confiscation of goods by government agencies
on account of lack of proper documents or any miss-declaration or
any non-compliance, whatsoever, on part of the supplier.
c) Where the supply of goods/ services are liable to GST under reverse
charge mechanism, the supplier shall clearly mention the category
under which it has been registered and also that “the liability of
payment of GST is on the Recipient of Service”. Invoice of such RCM
supply must comply with applicable provisions of GST Law. If
payment of GST is received by Supplier in spite of Goods or Services
supplied by said supplier is covered under RCM [Reverse Charge
Mechanism] and GST is payable by GNFC, the supplier shall
reimburse the amount of GST immediately to GNFC so that default
on part of GNFC can be avoided. In case of supplier’s failure to make
appropriate declarations and / or Supplier’s failure to reimburse the
GST amount, the same shall be recoverable from the Supplier with
interest at such rate as may be applicable under Section 50 of CGST
Act 2017 from time to time. Such supplier will be required to submit
invoice for supply of services within 30 days from date of invoice. In
case of failure to submit invoice within 30 days from date of invoice,
GNFC will be required to pay interest @ 18% or other applicable rate
from time to time under GST Law for delay in discharge of GST
liability under RCM. Any loss of input tax credit, penalty, interest, any
other loss arising out of supplier’s failure to submit invoice within
days from its date, will be recovered by GNFC from supplier with
applicable taxes.
d) In case supplier makes payment to any other person on behalf of
GNFC and subsequently claims reimbursement of such payment
from GNFC then such reimbursement claim is required to be
submitted in same month in which such amount was paid on behalf of
GNFC. Any delay in discharge of GST liability under RCM by GNFC
in relation to such reimbursement claim if results into loss of input tax
credit, penalty, interest, any other loss arising out of supplier’s failure
to submit above mentioned reimbursement claim within same month
of payment, will be recovered by GNFC from supplier with applicable
e) The invoice should clearly specify abatement, if any, claimed or
otherwise from the Taxable Value while calculating the GST.
f) Tax invoice and other tax documents like debit/credit notes etc. shall
be issued by the supplier as per applicable provisions of GST Law.
g) In case of supplier supplying Goods/Services/Both in relation to
creation of immovable property, Input Tax Credit of which is blocked
under applicable GST Law provision(s), Invoice(s) in relation to such
Goods/Services/Both is needed to be provided separately by keeping
planning, designing, execution etc. in this regard separate in
consultation with GNFC. Also other requirements in relation such
work such as providing Chartered Engineer’s Certificate for
Goods/Services/Both used in foundation and structural support of
plant an machineries and any other requirement in this regard as
communicated by GNFC will also be required to be complied with by
such supplier. Non-
Compliance of supplier in relation to above if results into loss of input
tax credit / additional tax liability, penalty, interest, any other loss, same
will be recovered by GNFC from supplier with applicable taxes.
► Other points:
a) Any Liability, whatsoever, arising out of or in connection with dispute
on the tax structure, tax rate(s), HSN classification, correct disclosure
in return, timely filing of applicable GST returns, raising of correct tax
invoice, within statutory timelines and presenting to GNFC
immediately, calculation, correct valuation and payment of GST to the
Government will be to the Supplier’s account;
b) In case the value of tax invoice or GST rate on tax invoice as
mentioned in tax invoice of Supplier is assessed differently by the
department during assessment proceedings or any other dispute is
raised by department resulting in additional tax liability on the Supplier,
GNFC shall not be liable to reimburse any amount of tax or interest or
penalty to such Supplier in relation to such additional liability or any
other incidental expenses or liabilities, whatsoever;
c) The tax invoice or debit note raised by supplier shall be compulsorily
furnished in GST return in the manner as required under the GST Law.
Further, GST in respect of such tax invoice shall be paid by the
Supplier as required under the GST Law. In case e invoicing is
applicable, debit/credit note(s) or other documents as prescribed in
applicable GST Law provision must be issued in compliance of such e
invoicing requirement containing all fields as prescribed in applicable
provision(s) of GST Law. In case the same is not complied with then
the Supplier shall make ‘good’ the loss suffered or potential loss that
may be suffered by GNFC due to the input tax credit or other loss in
that transaction (including applicable interest at such rate as may be
applicable under Section 50 of CGST Act 2017 and/or other applicable
provisions of GST Law from time to time and penalty in this regard).
d) In case the tax invoice is not presented to GNFC immediately on
issuance and if GNFC is not able to claim Input tax credit on account
of expiry of statutory timeline then GNFC shall not make payment of
any taxes to Supplier;
e) The PO/SO/WO shall be terminated immediately, if supplier is found to
be non-compliant or any action has been taken against it by authority,
in such case no payment of tax will be made and any loss or potential
loss due to such noncompliance to GNFC will be recovered with
applicable interest and penalty.
f) The Supplier/ Sub contractor shall communicate to GNFC with regard
to any change in the registration details, issue of
Blacklisting/suspension/cancellation/receipt of notice/demand etc. or
any noncompliance by Supplier irrespective of the fact that whether
such events are attributable to the Suppliers or not;
g) Any local levies and or other charges levied by any Central/state/local
authorities wherever applicable shall be extra and the same shall be to
the account of the supplier. GNFC shall not pay or reimburse the same
to the Supplier.
h) Declaration/ Self Certificate stating that Taxes which have been
collected/ with-held on behalf of GNFC have been duly paid/ will be
paid to the Government account within the prescribed due dates
specified under various Tax Laws (including GST law) in India. And
Rules made there under shall be submitted by the Supplier to GNFC.
i) In case supplier is located outside India. And supplying services to
GNFC whether on his own account or through intermediary acting as
ultimate supplier of GNFC, GNFC will become liable to discharge GST
under RCM as per India’s GST Law. Such supplier or in case of
intermediary such intermediary e.g. LSTK Contractor, commission
agent etc. will be required to submit invoice for supply of services
within 30 days from date of invoice. In case of failure to submit invoice
within 30 days from date of invoice, GNFC will be required to pay
interest @ 18% or at other applicable rate from time to time under GST
Law for delay in discharge of GST liability under RCM. Any loss of
input tax credit, penalty, interest, any other loss arising out of
supplier’s failure to submit invoice within 30 days from its date, will be
recovered by GNFC from supplier or in case of intermediary such
j) In case supplier is located outside India. and supplying goods to
GNFC whether on his own account or through intermediary acting as
ultimate supplier of GNFC, for which GNFC is required to carry out
customs clearance for home consumption by filing BoE [Bill of Entry]
then such supplier or in case of intermediary such intermediary e.g.
LSTK Contractor, commission agent etc. must ensure that quantity of
BoE must be equal to quantity invoiced by such supplier to GNFC. If
goods in BoE is not received or short received or due to
misunderstanding regarding UOM [Unit of Measurement] or other point
of PO between foreign supplier and GNFC BoE quantity is considered
to be short received against invoice, any additional liability/loss of input
tax credit, penalty, interest, any other loss arising out of supplier’s
failure to ensure that quantity and UOM in his invoice accurately
matches with quantity and UOM of BoE and same is received by
GNFC completely at its place of business under GST Law, will be
recovered by GNFC from supplier or in case of intermediary such
intermediary. Also such supplier or in case of intermediary such
intermediary must ensure that only non-creditable portion of GST be
passed on to GNFC after taking Input Tax Credit of creditable portion
of GST. Loss/expense if any suffered due to passing on such
creditable GST paid by supplier will be recovered with interest as
decided by GNFC.
k) In case of any dispute in relation to invoice(s) already issued, same is
to be resolved amicably in consultation with GNFC at the earliest,
however if it appears that such resolution will not take place until
September of financial year immediately succeeding the financial year
in which such invoice(s) was/were issued, amount of GST will not be
paid / if already paid will be recovered along with applicable interest /
interest as decided by GNFC. Such supplier may choose to issue GST
Credit Note under relevant provisions of GST Law within such time
limit to enable both parties to claim tax adjustments and avoid any tax /
Input Tax Credit / Interest / Penalty loss.
l) In case of advance payment i.e. clean/pure advance against which
services will be supplied, appropriate receipt voucher will be required
to be issued and when such advance gets adjusted against supply of
any services, necessary adjustment of tax already paid against
advance will be required to be adjusted and net tax if any is to be
claimed against such tax invoice. In case such advance is not adjusted
against any supply necessary refund voucher will be issued.
m) For GST compliance purpose DAY means a continuous period of
twenty-four hours commencing from midnight 00:00:00 hours.
n) For GST compliance purpose MONTH means a continuing period,
commencing from first day in a calendar month and ending on last day
o) In case of recovery of any amount in the nature of liquidated damages,
penalty, fine, etc., from the Contractor (i.e., supplier), on account of
non-performance or breach of any of the clauses and/or conditions
stipulated in the agreement, if it qualifies as consideration for agreeing
to the obligation to tolerate an act or a situation or to refrain from or do
an act, such transaction shall be considered as a supply of services by
GNFC in terms of para 5(e) of Schedule II of the Central Goods and
Services Act, 2017 (“CGST Act”) / Gujarat Goods and Services Act,
2017, liveable to GST at applicable rate In case of issuance of GST
invoice contractor (i.e., supplier) will be required to pay the amount of
such liquidated damages, penalty, fine etc. along with GST applicable
thereon. In case of commercial recovery such amount as demanded
has to be paid to GNFC separately and shall not be adjusted against
payment of any other GST Invoice(s).
p) In case any amount payable by the Contractor (i.e., supplier) to the
Owner (i.e., GNFC)other than covered by clause o) above is deducted
from the Contract Price or any other amounts owed by the Owner (i.e.,
GNFC) to the Contractor (i.e., supplier), such deduction of amount may
be treated as consideration towards independent supply of service/
goods, or in such other manner, as may be mutually agreed upon
between Owner (i.e., GNFC) and Contractor (i.e., supplier). The Owner
(i.e., GNFC) may raise GST tax invoice and charge appropriate GST
against the supply of goods and/or services for such deduction from
the contract price, as the case may be. In no event, the said deduction
shall be considered as discount or reduction in the Contract price as
agreed in this Agreement unless specifically agreed mutually between
Owner (i.e., GNFC) and Contractor (i.e., supplier).
q) Any reference to GST compliances or GST, interest, penalty, levy, etc.,
in any of the clauses of this contract shall be referred to and read in
consonance with this GST Annexure. In the event of a conflict or
inconsistency between the terms of contract and the terms of this GST
Annexure, the terms of this GST Annexure shall prevail over the terms
mentioned in contract for GST compliances as well as all matters
related to GST, interest, penalty etc.
► Clause on anti-profiteering:
Any economic or tax benefit arising out of the implementation of GST is
mandatorily required to be passed on to GNFC by the Supplier. Similarly,
the benefits enjoyed by Supplier’s Suppliers and other players in the supply
chain are also required to be passed on to the Supplier, which in turn shall
be passed on to GNFC by way of price reductions. Accordingly, Suppliers
are expected to pass on any direct or indirect benefits arising thereon.
All benefits due to change in rate of tax of outward supply or availability of
Input Tax Credit to supplier even post implementation of GST will be
required to be passed on to GNFC.
The responsibility to pass on the above benefits vests with the Suppliers as
our ‘Responsible Suppliers’ and GNFC shall have a right to understand and
seek details of the manner/ mechanism in which such benefits shall passed
► Tax Indemnity clause:
If GNFC is not able to avail Input Tax Credit due to any short coming / failure
on part of the Supplier in compliance of provisions of GST Law applicable
from time to time, including but not limited to mismatch of ITC between Invoice
and GST return uploaded by supplier (which otherwise should have been
available to GNFC in the normal course) and issuance of valid tax invoice
compliant with e invoicing and / or any other applicable requirements under
the GST Law, the Supplier shall at his own cost and effort get the short
coming rectified. If, for any reason, said rectification is not possible, the
Supplier shall make ‘good’ the loss suffered or potential loss that may be
suffered by GNFC due to or on account of short coming / failure on part of the
Supplier in compliance of provisions of GST Law and consequent tax credit
loss caused to GNFC in that transaction. When any shortcoming is
communicated by GNFC to Supplier, the Supplier shall take prompt action to
rectify the same at the earliest. GNFC reserves right to recover from
outstanding dues of Supplier without prejudice to above mentioned obligation
of Supplier to make ‘good’, the loss suffered or potential loss that GNFC may
The Company shall not be liable for or in respect of any liabilities, whatsoever,
arising out of or in connection with the non-compliance [examples like but not
limited to non-payment of tax to Government, non-filing of GST returns, delay
in filing of GST returns, non-reporting of invoices pertaining to supplies made
to GNFC, breach of conditions specified in GST law for payment of output tax
liability as well as ailment of input tax credit etc.] of any of the applicable
provisions of GST Law by the Supplier and the Supplier shall indemnify &
keep indemnified the Company against all such liabilities including but not
limited to additional tax liability/ loss of input tax credit, penalty, interest
thereon, all direct and incidental expenditures in relation to litigation cost being
borne by company damages, costs, charges & expenses whatsoever in
respect thereof or in relation thereto.
Sign & Seal of Supplier
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E - TENDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .