Loading…
Loading…
| Sl No | Description | Qty | Unit | USMAN T. L1 | Raheem L2 |
|---|---|---|---|---|---|
| 1.00CONCERTING | |||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 4 | cum | 65.78 ₹263.12 Lowest | 70 ₹280 |
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 80 | sqm | 14.7 ₹1,176 Lowest | 15 ₹1,200 |
| 1.00 | OD135927/2025-2026:(OD From DAR 51.2.3) dar 2021- Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 2.4 | cum | 944.28 ₹2,266.27 Lowest | 1,000 ₹2,400 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 5.4 | cum | 3,077.04 ₹16,616.02 Lowest | 3,200 ₹17,280 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 21.6 | cum | 8,784.48 ₹1,89,744.77 Lowest | 9,000 ₹1,94,400 |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 2.88 | cum | 600.92 ₹1,730.65 Lowest | 700 ₹2,016 |
Tender Value
₹2.1 L
EMD Value
₹5,295
Closing Date
8 Aug 2025, 5:00 pmClosed
ASSISTANT ENGINEER, LID EW SECTION ALIPARAMBA
ASSISTANT ENGINEER, LID EW SECTION ALIPARAMBA
Annual Plan-ALIPARAMBA GP 115/26- eravimangalam up school kuttippuli road maintanance-General Civil Work
2025_LSGD_781286_5
T2/AEALP/26
Open Tender
Civil Works - Roads
Item Rate
240 days
ALIPARAMBA
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹5,295
Yes
19 Nov 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
8 Aug 2025
1 Aug 2025
1 Aug 2025 - 8 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1281138.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .