Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LQualified Make: V CARE
Model: SANITARY NAPKIN INCINETATOR MACHINE (UB) NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Make: V CARE
Model: SANITARY NAPKIN INCINETATOR MACHINE (UB) | L1 | Qualified | |
| 2 | Disqualified Make: feelfree
Model: Staarteek 2018 A 1 BLOCK B DURGA MARKET SECTOR 53 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201307 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201307 | Make: feelfree
Model: Staarteek 2018 | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Oct 2018, 7:00 pmClosed
Sanitary Napkins Incinetator Machine with Smoke Control Unit Sanitary Napkins Incinetator Machine With Smoke Control Unit ( 9 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERAL Type - * Purpose Burn used Sanitary Napkins to sterile ash and stop automatically * Color - * Operation Mode Electronically operated
fully Automatic * Loading Type - * Stand provided true true Number of chambers Two * Trap Door available Yes * All MS parts Powder coated Yes * Spare parts should be available for Minimum 5 years from date of supply Yes * 1/8 All electrical parts are ISI Marked Yes * DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 40 40.0 Thickness of MS/SS sheet of housing cabinet (external) (mm) 1.2 * Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 5 5.0 (or higher) Machine Width(mm) - * Machine Depth (mm) - * Machine Hight(mm) - * Machine Weight(kg) 31-50 31-50 Door width(mm) - * Door height(mm) - * Thickness of door (mm) 40 40.0 Internal/burning chamber shape - * Flexible emission Outlet pipe dia (mm) - 40.0 Detachable ash tray length (mm) - * Detachable ash tray width (mm) - * Detachable ash tray height (mm) - * Stand Height (mm) - * Stand Width (mm) - * Stand Depth (mm) - * MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet Material of Burning chamber (Internal) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet Finish of MS parts of cabinet Epoxy anti rust proof painting for superior finish * Material of Thermal Insulation High Density Ceramic Fiber sheet High Density Ceramic Fiber sheet CONSTRUCTIONAL FEATURES Thermal insulation of burning chamber Yes * 2/8 housed in outer chamber Burning Chamber tray provided Yes * Emission Outlet pipe location - * Means of connecting the unit outlet with flue gas emission pipe - * Type of door lock provided Magnetic lock * CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes * Timer provided Yes * Auto cut-off temperature display Yes * Digital display to see actual and set temperature true * Minimum Burning temperature (degree C) 800 * Burning Capacity per day (Number of Napkins) 500-700 500-700 Burning Capacity at a time (Number of Napkins) 16-25 16-25 Residue Ash per Napkin (gms) 1.25 * Burning time of full capacity Napkins/pads (minutes) 5 5.0 Skin temperature of the unit under operation (deg C) 0-15 * Installation
training
demonstration and plumbing included Yes * ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes * Automatic digital controller for temperature Yes * Equipment ON/OFF indicator provided Yes * Power supply - * 3/8 Electrical Power Consumption(Watt) - * Minimum length of power chord to be supplied along with machine (mtr) 2 * Type of Heater Ceramic heater containing coil * Power saver (auto power cut-off) Yes * Safety MCB provided (16A to 30A) Yes * Protection against electric shock when checked as per IS:302-1/2008 Yes * Minimum Insulation Resistance (IR) at 500 VDC (Mega Ohm) 2 * Maximum Electrical Insulation and Leakage current as per IS:302-1/2008
(mA) 0.21 * Maximum Earthing continuity test when tested as per IS:302-1/2008 (Ohm) 0.1 * HV test at 1000 V rms for 1 Sec when tested as per IS:302-1/2008 No breakdown shall occur during the test * SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) - * Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet Mild Steel(CRCA) cabinet Finish of MS parts of SCU cabinet - * Overall height of SCU (mm) - * Overall width of SCU (mm) - * Overall depth of SCU (mm) - * Number of chambers for filteration of smoke emission Two * Both carbon Control and Foul odour Control Yes * 4/8 Chambers for filteration of smoke emission Number of filters in Carbon control chamber Two Two Type of filters in Carbon control chamber Activated Carbon filter Activated Carbon filter Number of filters in Odour control chamber Two Two Type of filters in Odour control chamber Activated Carbon filter * Blower type "Centrifugal
direct driven" * Blower RPM 2700 2700 Power supply of SPU 230v +/-10%
50Hz
Single phase
AC supply * Minimum length of flexible emission outlet pipe to be supplied along with machine (mtr) 3 * Cost of additional flexible emission outlet pipe
if required on actuals to be paid by the user Yes * EMISSION STANDARD FOR SMOKE Conformity to CPCB
Min of Environment & Forests standard HAZWAMS/30/2005-06 Yes * Particulates (Half hourly average) (mg/Nm3) (Max) 50 * HCl (Half hourly average) (mg/Nm3) (Max) 50 * SO2 (Half hourly average) (mg/Nm3) (max) 200 * CO (Half hourly average) (mg/Nm3) (Max) 100 * CO (Daily average) (mg/Nm3) (Max) 50 * Total Organic Carbon (Half hourly average) 20 * 5/8 (mg/Nm3) (Max) HF (Half hourly average) (mg/Nm3) (Max) 4 * "Nox (NO and NO2 expressed as NO2) (Half hourly average) (mg/Nm3) (Max)" 400 * Total dioxins and furans ( 6 to 8 hours sampling basis
Please refer guidelines for 17 concerned congeners for toxic equivalence values to arrive at total toxic equivalence) (ng TEQ/Nm3) (Max) 0.1 * Cd + Th + their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * Hg and its compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * Sb+As+Pb+Cr+Co+Cu +Mn+Ni+V+their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.5 * Loss on ignition (max) (% dry weight of the material) 5 * PACKING Packing - * MARKING AND INSTRUCTIONS The appliance is marked as per IS:302-1/2008 Yes * CERTIFICATION Submission of Test Report from Central Government NABL/ILAC accredited Lab specifically containing Electrical & Electronic parameters
Thermal insulation material of burning chamber etc in addition Yes * 6/8 to the declared specification parameters at the time of supply Submission Test Report for equipment for compliance of Flue gas emission and ash upon combustion of Sanitary Napkins/Pads to Central Pollotution Control Board (CPCB) norms from NABL accredited lab at the time of supply Yes * Certification Available EU-CE * Certificate for Manufacturing premises available ISO * Compliance certificate is to be furnished after conducting comprehensive performance test by the supplier Yes * Submission of all the certifications to the buyer along with supplies Yes * PERFORMANCE REQUIREMENTS Warranty (Yrs) 1 1 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 GANPATI PAL 784153
RANGAMATI BIHAGURI TEZPUR SONITPUR ASSAM 9 30
662544
GEM/2018/B/93977
Sanitary Napkins Incinetator Machine with Smoke Control Unit
30 days
Assam; Sonitpur
PRODUCT
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Sanitary Napkins Incinetator Machine with Smoke Control Unit Sanitary Napkins Incinetator Machine With Smoke Control Unit ( 9 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERAL Type - * Purpose Burn used Sanitary Napkins to sterile ash and stop automatically * Color - * Operation Mode Electronically operated | - | - | - |
| fully Automatic * Loading Type - * Stand provided true true Number of chambers Two * Trap Door available Yes * All MS parts Powder coated Yes * Spare parts should be available for Minimum 5 years from date of supply Yes * 1/8 All electrical parts are ISI Marked Yes * DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 40 40.0 Thickness of MS/SS sheet of housing cabinet (external) (mm) 1.2 * Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 5 5.0 (or higher) Machine Width(mm) - * Machine Depth (mm) - * Machine Hight(mm) - * Machine Weight(kg) 31-50 31-50 Door width(mm) - * Door height(mm) - * Thickness of door (mm) 40 40.0 Internal/burning chamber shape - * Flexible emission Outlet pipe dia (mm) - 40.0 Detachable ash tray length (mm) - * Detachable ash tray width (mm) - * Detachable ash tray height (mm) - * Stand Height (mm) - * Stand Width (mm) - * Stand Depth (mm) - * MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet Material of Burning chamber (Internal) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet Finish of MS parts of cabinet Epoxy anti rust proof painting for superior finish * Material of Thermal Insulation High Density Ceramic Fiber sheet High Density Ceramic Fiber sheet CONSTRUCTIONAL FEATURES Thermal insulation of burning chamber Yes * 2/8 housed in outer chamber Burning Chamber tray provided Yes * Emission Outlet pipe location - * Means of connecting the unit outlet with flue gas emission pipe - * Type of door lock provided Magnetic lock * CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes * Timer provided Yes * Auto cut-off temperature display Yes * Digital display to see actual and set temperature true * Minimum Burning temperature (degree C) 800 * Burning Capacity per day (Number of Napkins) 500-700 500-700 Burning Capacity at a time (Number of Napkins) 16-25 16-25 Residue Ash per Napkin (gms) 1.25 * Burning time of full capacity Napkins/pads (minutes) 5 5.0 Skin temperature of the unit under operation (deg C) 0-15 * Installation | - | - | - |
| training | - | - | - |
| demonstration and plumbing included Yes * ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes * Automatic digital controller for temperature Yes * Equipment ON/OFF indicator provided Yes * Power supply - * 3/8 Electrical Power Consumption(Watt) - * Minimum length of power chord to be supplied along with machine (mtr) 2 * Type of Heater Ceramic heater containing coil * Power saver (auto power cut-off) Yes * Safety MCB provided (16A to 30A) Yes * Protection against electric shock when checked as per IS:302-1/2008 Yes * Minimum Insulation Resistance (IR) at 500 VDC (Mega Ohm) 2 * Maximum Electrical Insulation and Leakage current as per IS:302-1/2008 | - | - | - |
| (mA) 0.21 * Maximum Earthing continuity test when tested as per IS:302-1/2008 (Ohm) 0.1 * HV test at 1000 V rms for 1 Sec when tested as per IS:302-1/2008 No breakdown shall occur during the test * SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) - * Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet Mild Steel(CRCA) cabinet Finish of MS parts of SCU cabinet - * Overall height of SCU (mm) - * Overall width of SCU (mm) - * Overall depth of SCU (mm) - * Number of chambers for filteration of smoke emission Two * Both carbon Control and Foul odour Control Yes * 4/8 Chambers for filteration of smoke emission Number of filters in Carbon control chamber Two Two Type of filters in Carbon control chamber Activated Carbon filter Activated Carbon filter Number of filters in Odour control chamber Two Two Type of filters in Odour control chamber Activated Carbon filter * Blower type "Centrifugal | - | - | - |
| direct driven" * Blower RPM 2700 2700 Power supply of SPU 230v +/-10% | - | - | - |
| 50Hz | - | - | - |
| Single phase | - | - | - |
| AC supply * Minimum length of flexible emission outlet pipe to be supplied along with machine (mtr) 3 * Cost of additional flexible emission outlet pipe | - | - | - |
| if required on actuals to be paid by the user Yes * EMISSION STANDARD FOR SMOKE Conformity to CPCB | - | - | - |
| Min of Environment & Forests standard HAZWAMS/30/2005-06 Yes * Particulates (Half hourly average) (mg/Nm3) (Max) 50 * HCl (Half hourly average) (mg/Nm3) (Max) 50 * SO2 (Half hourly average) (mg/Nm3) (max) 200 * CO (Half hourly average) (mg/Nm3) (Max) 100 * CO (Daily average) (mg/Nm3) (Max) 50 * Total Organic Carbon (Half hourly average) 20 * 5/8 (mg/Nm3) (Max) HF (Half hourly average) (mg/Nm3) (Max) 4 * "Nox (NO and NO2 expressed as NO2) (Half hourly average) (mg/Nm3) (Max)" 400 * Total dioxins and furans ( 6 to 8 hours sampling basis | - | - | - |
| Please refer guidelines for 17 concerned congeners for toxic equivalence values to arrive at total toxic equivalence) (ng TEQ/Nm3) (Max) 0.1 * Cd + Th + their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * Hg and its compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * Sb+As+Pb+Cr+Co+Cu +Mn+Ni+V+their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.5 * Loss on ignition (max) (% dry weight of the material) 5 * PACKING Packing - * MARKING AND INSTRUCTIONS The appliance is marked as per IS:302-1/2008 Yes * CERTIFICATION Submission of Test Report from Central Government NABL/ILAC accredited Lab specifically containing Electrical & Electronic parameters | - | - | - |
| Thermal insulation material of burning chamber etc in addition Yes * 6/8 to the declared specification parameters at the time of supply Submission Test Report for equipment for compliance of Flue gas emission and ash upon combustion of Sanitary Napkins/Pads to Central Pollotution Control Board (CPCB) norms from NABL accredited lab at the time of supply Yes * Certification Available EU-CE * Certificate for Manufacturing premises available ISO * Compliance certificate is to be furnished after conducting comprehensive performance test by the supplier Yes * Submission of all the certifications to the buyer along with supplies Yes * PERFORMANCE REQUIREMENTS Warranty (Yrs) 1 1 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 GANPATI PAL 784153 | - | - | - |
| RANGAMATI BIHAGURI TEZPUR SONITPUR ASSAM 9 30 | - | - | - |
Exempted
8 Oct 2018
26 Sept 2018
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_662544.pdf
GEM_BID
termsCondition.pdf
OTHER
2657c7ca70287299b5181580fdb5a7ab.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .