| 1 | L-1₹11.1 LAccepted-AOC | ₹11.1 L | L-1 | Accepted-AOC Lowest Bid |
| 2 | L-2₹12.3 L+₹1.1 L (10.4%)Rejected-Finance | ₹12.3 L+₹1.1 L (10.4%) | L-2 | Rejected-Finance Higher Bid |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Others-Not meet required TQR |
| Sl No | Description | Qty | Unit | KARAN SUPER ELECTRICAL WORKS L1 | M/S SHIVAM ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Dragging / Shifting of 40 MVA, 132/33 KV , ABB make
transformer from the site to plinth location with help of
jacks rollers etc including cost of material labor and T&P
Required for proper completion of work. Approx 50 mtr | 50 | Mtr | 1,500 ₹75,000 Lowest | 2,500 ₹1,25,000 |
| 2.00 | Sshifting of 40 MVA ,132/33 KV ,all transformer accessories (conservator, radiators, HV bushing, oil drums etc to work site ) complete work in all respect including cost of material, consumables, labor and T&P required for the proper completion of work. | 1 | Job | 25,000 ₹25,000 Lowest | 40,000 ₹40,000 |
| 3.00 | Safe and proper erection of 40 MVA transformer, its accessories and peripherals such as main tank, bushing, turret, CTs, radiators, cooling fans, complete pipe system, conservator tank, various relays, etc. Including earthing of the system complete in all respect as per standard instructions manual including direction of engineer in charge including cost of material, consumables. Labor and T&P required for the proper completion of work. | 1 | Job | 7,50,000 ₹7,50,000 Lowest | 7,75,000 ₹7,75,000 |
| 4.00 | Complete pre-commissioning testing of 40 MVA transformer such as open circuit test short circuit test, vector group test, stability test, insulation test, winding resistance test, tan delta test, SFRA test and other including testing of HV and LV side bay equipments i.e. 132KV & 33KV CB's, 132KV & 33KV CT's, 132KV & 33KV PT's RTCC and C&R panels etc. and submission of test reports in three (03) copies jointly signed with O&M and T&C wing of PTCUL before charging of transformer, complete in all respects as per instructions of engineer in charge including cost of material, consumables, labour and T&P required for the proper completion of work. | 1 | Job | 1,50,000 ₹1,50,000 Lowest | 1,65,000 ₹1,65,000 |
| 5.00 | Collection of oil samples of transformer and its testing for DGA and other relevant, tests from CPRI as per direction of engineer in charge including cost of all material, consumables, labor and T&P required for the proper completion of work and submission of reports in three (03) copies at the earliest. (Top , bottom , OLTC)before and after charging of transformer. | 6 | Job | 15,000 ₹90,000 Lowest | 15,000 ₹90,000 Lowest |
| 6.00 | Inspection charges by electrical inspector | 1 | Job | 20,000 ₹20,000 Lowest | 30,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
12 Feb 2024, 3:00 pmClosed
Chief Engineer O and M Garhwal Zone Roorkee
Chief Engineer O and M PTCUL Garhwal Zone 26 civil lines Roorkee
Work of erection commissioning and shifting of repaired 40 MVA 132/33KV ABB make Transformer at 132KV Substation Bhagwanpur
2024_PTCUX_67456_1
CE/GZR-23/2023-24
Open Tender
Electrical Works
Item Wise
30 days
Bhagwanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
SE Oand M Transmission Circle Roorkee
₹33,000
Yes
27 Jun 2026
9 Jan 2024
13 Feb 2024
9 Jan 2024
12 Feb 2024
9 Jan 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .