GEMC-511687713813779
Awarded to GR POWER SWITCHGEAR LIMITED
₹47.6 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 17 Set | 2,241,982 | 38,113,694 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 10 Set | 2,241,982 | 22,419,820 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 6 Set | 2,241,982 | 13,451,892 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 45 Set | 2,242,982 | 100,934,190 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 13 Set | 2,241,982 | 29,145,766 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 19 Set | 2,241,982 | 42,597,658 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 18 Set | 2,241,982 | 40,355,676 |
| Supply of 420KV, 3150A, 50kA Isolator 3 Phase Double Break with one Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 11 Set | 2,241,982 | 24,661,802 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 2 Set | 2,592,701 | 5,185,402 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 2 Set | 2,592,701 | 5,185,402 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 1 Set | 2,592,701 | 2,592,701 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 3 Set | 2,592,701 | 7,778,103 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 3 Set | 2,592,701 | 7,778,103 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 1 Set | 2,592,701 | 2,592,701 |
| Supply of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 2 Set | 2,592,701 | 5,185,402 |
| Supply of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 4 Set | 1,049,346 | 4,197,384 |
| Supply of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 3 Set | 1,049,346 | 3,148,038 |
| Supply of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 2 Set | 1,049,346 | 2,098,692 |
| Supply of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 2 Set | 1,049,346 | 2,098,692 |
| Supply of 245kV,1600A,40kA Isolator 3 Phase Double Break with One Earth Switch including Support insulators, terminal connectors and support structure suitable for existing foundation | GRPS / HDB | 85353090 | 1 Set | 948,220 | 948,220 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 2,520 Meter | 867.6 | 2,186,352 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 1,840 Meter | 867.6 | 1,596,384 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 1,520 Meter | 867.6 | 1,318,752 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 7,620 Meter | 867.6 | 6,611,112 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 2,480 Meter | 867.6 | 2,151,648 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 4,160 Meter | 867.6 | 3,609,216 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 3,090 Meter | 867.6 | 2,680,884 |
| Supply of 40mm MS ROD, Mild Steel rod as per IS 2062 SAE1018 | GRPS / HDB | 72141090 | 1,480 Meter | 867.6 | 1,284,048 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 17 Set | 252,815 | 4,297,855 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 10 Set | 252,815 | 2,528,150 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 6 Set | 252,815 | 1,516,890 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 45 Set | 252,815 | 11,376,675 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 13 Set | 252,815 | 3,286,595 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 19 Set | 252,815 | 4,803,485 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 18 Set | 252,815 | 4,550,670 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with one Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 11 Set | 252,815 | 2,780,965 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 2 Set | 252,815 | 505,630 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 252,815 | 252,815 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 252,815 | 252,815 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 2 Set | 252,815 | 505,630 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 2 Set | 252,815 | 505,630 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 252,815 | 252,815 |
| Retrofitting, Installation and commissioing of 420KV,3150A,50kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 2 Set | 252,815 | 505,630 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 202,252 | 202,252 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 2 Set | 202,252 | 404,504 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 3 Set | 202,252 | 606,756 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 202,252 | 202,252 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with Two Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 202,252 | 202,252 |
| Retrofitting, Installation and commissioing of 245kV,1600A,40kA Isolator 3 Phase Double Break with One Earth Switch as per the POWERGRID SCOPE OF WORK using existing civil foundations | GRPS / HDB | 9988 | 1 Set | 202,252 | 202,252 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 24,847 kg | 200.6 | 4,984,308.2 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 24,453 kg | 200.6 | 4,905,271.8 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 18,142 kg | 200.6 | 3,639,285.2 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 14,987 kg | 200.6 | 3,006,392.2 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 75,133 kg | 200.6 | 15,071,679.8 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 41,018 kg | 200.6 | 8,228,210.8 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 30,467 kg | 200.6 | 6,111,680.2 |
| Fabrication of auxilary earth mat as per the POWERGRID drawing and scope of work. Connecting auxilary earthmat to Isolator MOM Boxes and Main earthgrid as per POWERGRID drawing | GRPS / HDB | 73079990 | 14,593 kg | 200.6 | 2,927,355.8 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 504 SqMtr | 861.4 | 434,145.6 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 372 SqMtr | 861.4 | 320,440.8 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 276 SqMtr | 861.4 | 237,746.4 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 228 SqMtr | 861.4 | 196,399.2 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 1,230 SqMtr | 861.4 | 1,059,522 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 624 SqMtr | 861.4 | 537,513.6 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 474 SqMtr | 861.4 | 408,303.6 |
| Removing,cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC inclduing antiweed treatment | GRPS / HDB | 84514099 | 222 SqMtr | 861.4 | 191,230.8 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 504 Cum | 271.4 | 136,785.6 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 372 Cum | 271.4 | 100,960.8 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 276 Cum | 271.4 | 74,906.4 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 228 Cum | 271.4 | 61,879.2 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 1,230 Cum | 271.4 | 333,822 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 624 Cum | 271.4 | 169,353.6 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 474 Cum | 271.4 | 128,643.6 |
| Earthwork in excavation by mechanical means Hydraulic Excavator or Manual as mentioned in POWERGRID scope of work | GRPS / HDB | 9954 | 222 Cum | 271.4 | 60,250.8 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 504 Cum | 247.8 | 124,891.2 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 372 Cum | 247.8 | 92,181.6 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 276 Cum | 247.8 | 68,392.8 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 228 Cum | 247.8 | 56,498.4 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 1,230 Cum | 247.8 | 304,794 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 624 Cum | 247.8 | 154,627.2 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 474 Cum | 247.8 | 117,457.2 |
| Filling available excavated earth excluding earthwork in trenches ,plinth, sides of foundation etc as mentioned in POWERGRID scope of work | GRPS / HDB | 84314930 | 222 Cum | 247.8 | 55,011.6 |