| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.6 LAccepted-Finance | ₹50.6 L | L1 | Accepted-Finance Lowest bidder. |
| 2 | L2₹57.5 L+₹6.9 L (13.6%)Rejected-Finance | ₹57.5 L+₹6.9 L (13.6%) | L2 | Rejected-Finance Not the lowest bidder. |
| 3 | L3₹57.5 L+₹6.9 L (13.6%)Rejected-Finance VILL NO 1 DIGHIRPAR P O WEST DIGHIRPAR P S CANNING SOUTH 24 PARGANAS PIN 743329 | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | 743329 | ₹57.5 L+₹6.9 L (13.6%) | L3 | Rejected-Finance Not the lowest bidder. |
| 4 | L4₹73.6 L+₹23.0 L (45.5%)Rejected-Finance | ₹73.6 L+₹23.0 L (45.5%) | L4 | Rejected-Finance Not the lowest bidder. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
Tender Value
₹71.8 L
EMD Value
₹1.4 L
Closing Date
23 Feb 2026, 5:00 pmClosed
EE TA SE MDC
Office of the Superintending Engineer, Metropolitan Drainage Circle Postal Address-Jalasampad Bhawan, 2nd Floor, Salt Lake, Kolkata-700091
Desiltation of CC1 Khal from Ch. 0.00 to Ch. 85.00 (Length 2.590 KM) along with bank protection for a length of 670 m under Madhyamgram Municipality in P.S. Madhyamgram under District North 24 Parganas
2026_IWD_1002107_1
WBIW/TA/MDC/NIT-05(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
210 days
Madhyamgram
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.4 L
Yes
13 Aug 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation or re-excavation of drainage channels / rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75 metre) specially made to suit the site condition in tidal or non-tidal channel / river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in a manner suited for the purpose and placing the excavated materials from the boat etc. on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available locations having distances from the point of re- excavation as shown below, by means of excavators or any other machines or manually as may be required, including all lifts.
Measurement : By Pre-work and Post- work level sections. Pre-work level for the existing bed of the channel / river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300 metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach.
(d) For distance beyond 200 metre but within 300 metre from the point of
re- excavation to the placing point on the bank. | - | CUM | 215.72 | - |
| 2 | Earthwork in excavation or re-excavation of drainage channels / rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75 metre) specially made to suit the site condition in tidal or non-tidal channel / river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in a manner suited for the purpose and placing the excavated materials from the boat etc. on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available locations having distances from the point of re- excavation as shown below, by means of excavators or any other machines or manually as may be required, including all lifts.
Measurement : By Pre-work and Post- work level sections. Pre-work level for the existing bed of the channel / river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300 metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach.
(e) For distance beyond 300 metre but within 400 metre from the point of
re- excavation to the placing point on the bank. | - | CUM | 220.48 | - |
| 3 | Earthwork in excavation or re-excavation of drainage channels / rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75 metre) specially made to suit the site condition in tidal or non-tidal channel / river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in a manner suited for the purpose and placing the excavated materials from the boat etc. on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available locations having distances from the point of re- excavation as shown below, by means of excavators or any other machines or manually as may be required, including all lifts.
Measurement : By Pre-work and Post- work level sections. Pre-work level for the existing bed of the channel / river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300 metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach.
(f) For distance beyond 400 metre but within 500 metre from the point of
re- excavation to the placing point on the bank. | 0.4 | CUM | 225.25 | ₹89.87 |
| 4 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m and upto a distance of 5.00 km from the excavated point including cost of stacking, loading, unloading, transporting, rrangement of land, if required by agency, spreading and levelling as necessary etc. complete.
Measurement : By stacks at loading point after deducting voids as per rule. (This item can only be used after obtaining permission from the concerned Superintending Engineer). | - | CUM | 139.44 | - |
| 5 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(iii) 15 cm av. Diameter | - | METRE | 258.62 | - |
| 6 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after
driving and including hire and labour for necessary driving appliances
and all tackles.
(iii) 15 cm av. diameter | - | METRE | 125.14 | - |
| 7 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus | - | METRE | 123.95 | - |
| 8 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
b) Two Coat | - | SQM | 65.55 | - |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 10 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028
cum/ bag. | - | Each Bag | 8.34 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
2911.pdf
Tender Documents • 0.40 MB
BARCHART.pdf
Tender Documents • 0.98 MB
BOQ_2455899.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .