| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | L1 | Accepted-AOC Being Lowest Vendor | |
| 2 | L2₹26.1 L+₹1.4 L (5.84%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹27.1 L+₹2.5 L (9.98%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹30.7 L+₹6.1 L (24.7%)Rejected-Finance 50 1 56 13 SURYA TOWERS ASR NAGAR SEETHAMMADHARA VISAKHAPATNAM 530 013 | VISAKHAPATANAM | ANDHRA PRADESH | 530013 | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹34.7 L+₹10.0 L (40.7%)Rejected-Finance DOOR NO 14 6 21 5 OPP MARVAL SCHOOL BC ROAD NEW GAJUWAKA VISAKHAPATNAM 530026 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530026 | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | REAL ENGINEERING WORKS L5 | bhavani constructions L1 | SAI KRISHNA ASSOCIATES L4 | SRI SIDDHI VINAYAKA ENTERPRISES L2 | ANAND ENTERPRISES AND ENGINEERS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Material and labour for repairs and overhauling of pumps of following capacities by disconnecting and taking out from the bed, self casting of shaft and body cover refixing the impeller old or new, replacement of worn out bush/ball bearing, replacement of gland packing, studs, bolts etc., reassembling the pump unit, reinstalling its original position by confirming the alignment including painting to pump body with one coat of synthetic enamel paint, testing all as specified and directed. Note :- Impeller required new shall be measured and paid seperately. | ||||||||
| 1.01 | 3 HP | 1 | Job | 2,300 ₹2,300 | 1,500 ₹1,500 Lowest | 1,800 ₹1,800 | 2,000 ₹2,000 | 2,100 ₹2,100 |
| 1.02 | 5 HP | 2 | Job | 3,700 ₹7,400 | 300 ₹600 Lowest | 2,500 ₹5,000 | 4,000 ₹8,000 | 3,400 ₹6,800 |
| 1.03 | 7.5 HP | 2 | Job | 4,200 ₹8,400 | 2,500 ₹5,000 Lowest | 2,900 ₹5,800 | 4,500 ₹9,000 | 3,800 ₹7,600 |
| 1.04 | 10 HP | 6 | Job | 5,200 ₹31,200 | 3,000 ₹18,000 Lowest | 3,900 ₹23,400 | 5,000 ₹30,000 | 4,600 ₹27,600 |
| 1.05 | 25 HP | 2 | Job | 12,500 ₹25,000 | 8,000 ₹16,000 Lowest | 10,900 ₹21,800 | 13,000 ₹26,000 | 11,300 ₹22,600 |
| 1.06 | 30 HP | 2 | Job | 15,500 ₹31,000 | 9,000 ₹18,000 Lowest | 11,999 ₹23,998 | 15,000 ₹30,000 | 13,300 ₹26,600 |
| 1.07 | 40 HP | 4 | Job | 16,500 ₹66,000 | 10,000 ₹40,000 Lowest | 14,999 ₹59,996 | 16,500 ₹66,000 | 14,500 ₹58,000 |
| 2.00Material and labour for repairs and overhauling of motors of following capacities by disconnecting and taking out from the bed, replacement of worn out bush/ball bearing, lugs, studs, bolts etc., re-installing in it's original position including painting the motor body with one coat of synthetic enamel paint, connecting up, testing all as specified and directed. | ||||||||
| 2.01 | 2 HP | 2 | Job | 1,250 ₹2,500 | 1,500 ₹3,000 | 1,299 ₹2,598 | 700 ₹1,400 Lowest | 1,680 ₹3,360 |
Tender Value
₹45.7 L
EMD Value
₹91,480
Closing Date
16 Mar 2026, 6:30 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
REPAIR/MAINTENANCE OF CHILLED WATER CONDENSER WATER PUMP SETS AND CONNECTED PIPELINES VALVES COOLING TOWERS IN VARIOUS CENTRAL AND PACKAGE TYPE AC PLANTS AND ALLIED WORKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) DM VISAKHAPATNAM
2026_MES_753820_1
8511/C/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹500
GE (I) DM Visakhapatnam
₹91,480
Yes
9 Jun 2026
23 Feb 2026
18 Mar 2026
23 Feb 2026
16 Mar 2026
9 Mar 2026
24 Feb 2026 - 7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material and labour for repairs and overhauling of pumps of following capacities by disconnecting and taking out from the bed, self casting of shaft and body cover refixing the impeller old or new, replacement of worn out bush/ball bearing, replacement of gland packing, studs, bolts etc., reassembling the pump unit, reinstalling its original position by confirming the alignment including painting to pump body with one coat of synthetic enamel paint, testing all as specified and directed. Note :- Impeller required new shall be measured and paid seperately. | |||||
| 1.01 | 3 HP | 1 | Job | - | - |
| 1.02 | 5 HP | 2 | Job | - | - |
| 1.03 | 7.5 HP | 2 | Job | - | - |
| 1.04 | 10 HP | 6 | Job | - | - |
| 1.05 | 25 HP | 2 | Job | - | - |
| 1.06 | 30 HP | 2 | Job | - | - |
| 1.07 | 40 HP | 4 | Job | - | - |
| 2Material and labour for repairs and overhauling of motors of following capacities by disconnecting and taking out from the bed, replacement of worn out bush/ball bearing, lugs, studs, bolts etc., re-installing in it's original position including painting the motor body with one coat of synthetic enamel paint, connecting up, testing all as specified and directed. | |||||
| 2.01 | 2 HP | 2 | Job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_844320.xls
BOQ • 0.34 MB
8511Tender.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .