CEO, Technopark
Park Centre, Technopark, Phase 1 campus
Revamping of existing communication ducts
2026_ETPK_878215_1
ETPK/PH1/263/2026-27
Open Tender
Civil Works - Others
Item Rate
120 days
Technopark Phase 1 Campus
As mentioned in Bid document
6 documents required · 6 mandatory
₹8,850
₹1 L
Park Centre, Technopark, Phase 1 campus
14 Oct 2026
14 Oct 2026
20 Nov 2026
14 Oct 2026
19 Nov 2026
22 Oct 2026
22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material outside Technopark Campus, as per the direction of Engineer-in-charge. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading, at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 109.45 | Cum | - | - |
| 2 | Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Technopark Campus, as per the direction of Engineer -in-Charge: Water bound macadam road. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 218.9 | Sqm | - | - |
| 3 | Demolishing R.C.C. work manually / by mechanical means including cutting and stacking of steel bars and disposal of unserviceable material outside Technopark Campus as per the direction of Engineer -in-Charge. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 381.75 | Cum | - | - |
| 4 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Technopark Campus as per the direction of Engineer-in-Charge.In cement mortar. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 57.15 | Cum | - | - |
| 5 | Earth work in excavation in all kinds of soil by mechanical means /manual means in foundation trenches or drains (not exceeding 1.5 m in width), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and, and then returning the soil as required for back filling and disposal of surplus excavated soil within a lead of 2 km, as directed by Engineer in Charge. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 992.27 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 141.39 | Cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) of ducts and drains at plinth level and below.The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 2,390.07 | Sqm | - | - |
| 8 | Providing and laying in position 1:1.5:3 grade of reinforced cement concrete (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 543.27 | Cum | - | - |
| 9 | Providing, fixing and laying to the required levels factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000x500x100 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforation @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer - in- charge. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed), loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 1,696 | Nos | - | - |
| 10 | Steel reinforcement for R.C.C work with Thermo-Mechanically Treated bars of grade Fe-500D or more including straightening, cutting, bending, placing in position and binding all complete upto plinth level. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site to outside Technopark Campus etc. complete as per the direction of engineer in charge. | 8,806.63 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BID.pdf
Tender Documents • 1.48 MB
LocationPlan.pdf
Other Document • 0.68 MB
BOQ_1492709.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .