Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance NOT AVAILABLE | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.1 L+₹3,075 (2.78%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.1 L+₹3,220 (2.91%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Accepted-Finance Found Eligible |
Tender Value
Refer Docs
Closing Date
15 Feb 2023, 11:00 amClosed
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Repairs to various electromechanical machinery installed at LIS Argi Baljaralan.
2023_IFC_204556_1
MID/AN/190
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
RAJOURI
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
2 Mar 2023
8 Feb 2023
16 Feb 2023
8 Feb 2023
15 Feb 2023
10 Feb 2023
9 Feb 2023
Repairs to 4 cusec discharge 24 m head HC pumps installed at LIS Argi Baljaralan. The Job involves decoupling of pump coupled with three phase induction motor . Further removing the pump top cover , extracting the impeller shaft assembly & shifting of the impeller shaft assembly by manual / mechanical means to workshop. Separating shaft, impeller and bushes..Providing/fabrication of two no. bush as per sample. Providing/fitting of 6309- 2 nos. bearings Assembling of the pump parts. Carriage / transportation of the pump assembly back from workshop to the site of LIS. Fitment of pump along with replacement of rusted / damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing & commissioning of the pumping unit on full load. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. Complete Job
Repair to 50 HP three phase induction motor no. 01at LIS Argi baljaralan.The job involves decoupling the motor from the HC pump and unfastening the foundation nuts and bolts by using suitable tools and tackles and labour.Lifting the motor out of pump house by using manual labour. Loading the motor in the vehicle and shifting the motor to the workshop . Unloading of the motor in the workshop .The job further involves dismantling of end covers, extraction of rotor from motor. Extraction of damaged winding from the stator. Cleaning of stator with compressed air and requisite chemical cleanser/CCL4. Complete rewinding by way of providing and fitting of new good quality winding wire of gauge and size (as per old sample) in the stator together with replacement of damaged /worn out wedges/strips and p/f of f-class insulation, Application of superior quality varnish (Red Becktol etc.) by spray impregnation process and drying the stator winding with hot air circulation process and thereafter checking the IR value. Re-assembling the motor after greasing. Shifting the motor to LIS . Installation of the motor over the base frame by providing / fitting of nut bolts, washers etc., making of electrical connections, replacing worn out nuts, bolts for the electrical connection. Alignment & coupling with pump .Complete testing of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
Providing/fitting by way of replacement of bearings of 50 HP three phase Induction Motor no. 02 installed at LIS Argi Baljaralan. The job involves disconnecting all electrical connection decoupling the motor from the pump, removing from the base plate . Dismantling the motor ,extraction of the rotor and bearings.. Providing/fitting of driving end bearing ( 6313) and non driving end bearing ( 6313). Greasing of the bearings . Assembling of motor. Fitting the motor over the base frame by providing / fitting of nut ,bolts, washers , making of electrical connections, replacing worn out nuts, bolts and thimbles for the electrical connection. Alignment & coupling with pump. Complete testing of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
M/S FASTTRACK ENGINEERS
G S ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .