Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹9,000
Closing Date
10 Jun 2026, 6:00 pm5d left
Executive Engineer, Pan (R & B) Division, Jamnagar
CONSTRUCTION OF CAUSEWAY ON NANABADANPAR TO NANIVAVDI ROAD ON MAIN RIVER NEAR HAPA VADI AREA TA: KALAVAD
310773
06 of 2026-27
Open
Civil Works
Jamnagar
6 documents required · 6 mandatory
₹900
Executive Engineer Pan (R & B) Division, Jamnagar.
₹9,000
2 Jun 2026
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
Name of Work:- Construction of Causeway on Nanabadanpar to Nanivavdi road on main River
near Hapa Vadi area Ta: Kalavad
Taluka : Kalavad Dist: Jamnagar.
BILL OF QUANTITIES
Sr. No. Description of Item (With brief Quantity Unit Rs. In Amount
specification and reference to book of figure
specifications)
1 Excavation for foundation in hard murrum and 33.00 Cum. 625.37
boulders and very stiff or sticky, clays and
other similar strata including shoring and
strutting and dewatering as necessary and
disposing of the excavated stuff as directed.
2 Excavation in large boulders and soft rock by 39.00 Cum. 733.62
welding including shoring, strutting and
dewatering as necessary and disposing of the
excavated stuff as directed.
3 Providing and filling in foundation with 22.00 Cum. 3362.24
ordinary Cement concrete M-100 mix and
providing necessary vertical pin headers
including formwork, vibrating, ramming and
curing complete.
4 Providing & casting in situ ordinary cement 111.00 Cum. 3938.30
concrete M-150 mix and providing necessary
pin headers including shuttering, scaffolding,
laying, vibrating, curing and finishing
complete without V-Groves.(A) Height from
5 Supplying & fixing reinforced concrete heavy 20.00 Rmt. 3781.44
duty non pressure pipes without collars for
culverts including setting and joining the
pipes in C.M. 1:2 watering and laying (to level
or slope) of I.S. class NP3 (V) 900mm with all
6 Providing and laying in position FE 500D TMT 0.73 MT. 73858.68
bar reinforcement including cutting, bending,
hooking and tying complete as per detailed
drawings and as required complete.
7 Providing temporary all weather and fair 25.00 Rmt. 457.74
weather diversion suitable for traffic during
the construction period of the bridge
including providing necessary drains and all
safety measure including red/lamps/signal at
night for traffic etc. complete.
8 Earthwork for embankment including 17.00 Cum. 158.55
breaking clods, dressing with all lead and lift
(excluding watering and consolidation)(B)
From Borrow area within all lead.
9 Rolling and watering of earthwork in layers 17.00 Cum. 23.17
with power roller 8-10 tonne including filling in
depressions which occur during the process.
of 3KLW Causeway to Nana badanpar hapa Vadi 05-26.xls
Sr. No. Description of Item (With brief Quantity Unit Rs. In Amount
specification and reference to book of figure
specifications)
10 Providing and laying granular sub-base Grade- 18.00 Cum. 541.36
I C.B.R. not less than 30% by providing coarse
graded materials, consisting of B.T. crushed
stone aggregates 53mm to 26.5 mm @ 35%
26.5mm to 4.75mm @ 45%, 2.36mm to below
@ 20% coarse sand combination and stone
dust/grit spreading in uniform layers with
motor grader on prepared surface, mixing by
mix in place method with rotovator at O.M.C.
to required dry density including filling the
depressions which occurred during the
process using vibratory roller 8-T to 10-T
complete as per Clause-401.
11 Providing and casting in situ Ordinary trimix 25.00 Cum. 4987.38
cement concrete M-250 for average 200mm
thick road work laid as directed including
adding super platisizer admixture of IS make
and providing and laying M.S. side rail of road
thickness with necessary nut bolts plates
fixing as per width applying plate vibrator
(electric or diesel) on channel compressor
with vacuum dewatering system by using all
necessary equipments and materials and
machinery such as running screed vibrator on
prelaid M.S. channel for leveling, Vacume
pump, floating and power towelling etc with
filling the joints with bitumen as directed etc
Amount of my tender work out as under
I / We am/are willing to carry out the work at ………………………………………….. % above / below Percent
[should be written in figures and words] of the estimated rates mantioned above. Amount of my/our tender
works out as under
Estimated Amount Put to tender: Estimated Amount Put to tender:
Deduct % below Add % above
Net Rs. Net Rs.
In words : In words :
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
Kalavad. Jamnagar.
of 3KLW Causeway to Nana badanpar hapa Vadi 05-26.xls
Sr. No. Description of Item (With brief Quantity Unit Rs. In Amount
specification and reference to book of figure
specifications)
1 All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
2 All the columns is Schedule should be filled in ink and the total of the entries in the last
column should be struck by the contractor under his signature.
3 Rates quoted include clearance of site (prior commencement of work and at its close )
in all respects and hold good for work under all conditions, site, moisture, weather etc.
4 The contractor shall exhibit the board at site of work with the details of works, Tender
amount and specification as per Govt. Circular No. BBG / 3277 / 1657 / N, Dt.26-4-78
and as per G.R.No. TNC -1090-24-C, Dt.18-11-91, as directed by Engineer-in-charge of
the works, exhibit board at site of work, for which contractor is not entitiled for any
5 Contractor shall even " NIL " percentage, if no deduction is offered.
6 One percent of work done amount of this work shall be recovered from the contractor
payment as " Labour Cess " in terms of the Guajarat Govt. gazette extra ordinary dt.
12/12/2004 implementation of building and other construction works.(Regulation of
employment & condition of service act
7 Testing of materials shall be as per statement attched for quality control. The material
shall be tested in GERI bill for the testing charge shall be paid by the Department and
% (One percent) of amount put to tender after deduction of cost of material as per
scheule-A shall be recovered from the contractor's running Bill as per GR of R.& B.
Dept. No.TNC / 1085 / 4 / C Dt. 20-12-91 & modified R.& B. Dept. Circular No.SSR /
Signature of Contractor :
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat ( R & B ) Division,
Kalavad. Jamnagar
of 3KLW Causeway to Nana badanpar hapa Vadi 05-26.xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1- GOVERMENT OF GUJARAT.pdf
index to specification.pdf
Nivida No.06.pdf
Price bid.pdf
SBD of KLW Causeway to Nana badanpar hapa .pdf
Specification of KLW Causeway to Nana badanpar hapa Vadi 05-26.pdf
Test Sch -04-25.pdf
Download all tender documents and submit your bid