Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹11.6 L+₹5,258 (0.45%)Accepted-AOC | L2 | Accepted-AOC 2nd lowest |
Tender Value
₹11.6 L
EMD Value
₹29,000
Closing Date
23 Feb 2022, 6:00 pmClosed
The Assistant Executive Engineer
Assistant Executive Engineer, Electrical wing (Irrigation) Sub Division, Aluva -683101
Fully Comprehensive Annual Maintenance of Pampakkuda Lift LIS, Ramamangalam NO 1 LIS, Pampakkuda Relift LIS and Ramamangalam No 4 LIS Under Electrical Lift Irrigation Section Ramamangalam
2022_Irrig_472207_2
127/TR/AEE/21-22
Open Tender
Electrical Works
Item Wise
365 days
Aluva
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹29,000
Yes
11 May 2022
16 Feb 2022
26 Feb 2022
16 Feb 2022
23 Feb 2022
16 Feb 2022
16 Feb 2022 - 19 Feb 2022
Amount
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of Pampakuda Lift LIS (125 HP x 1 No, 110 H P x 1 No,100 HP x 1 No, 75 HP x 1 No and 5 HP x 1 Nos )
Part 1_ Lowering and Overhauling
od14075/2021_2022/IA : Lowering down and erecting the 125 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14076/2021_2022/IA : Lowering down and erecting the 110 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14077/2021_2022/IA : Lowering down and erecting the 100 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14078/2021_2022/IA : Lowering down and erecting the 75 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14021/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14079/2021_2022/IA : Dismantling the 110 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14080/2021_2022/IA : Dismantling the 100 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14081/2021_2022/IA : Dismantling the 75 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14082/2021_2022/IA : Dismantling above 125 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14027/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14029/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2_ AMC
od14083/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 100 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od14084/2021_2022/IA : Fully Comprehensive Annual Maintenance of 125 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od14085/2021_2022/IA : Fully Comprehensive Annual Maintenance of 110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od14086/2021_2022/IA : Fully Comprehensive Annual Maintenance of 75 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od14045/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Part 3_ Consumable Supplies(Should be supplied and errected with in 3 months from the date of Agreement)
od45340/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45341/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 100 HP motor's fully automatic star delta starter
od45342/2021_2022/IA : Supply and providing brass slipring unit for 50 - 100 HP Motor including fitting and giving connections
od45343/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45344/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45345/2021_2022/IA : Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one,L&T or equivalent make.
od45346/2021_2022/IA : Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45347/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 125 HP motor / pump set as per the direction of Departmental staff at site.
od45348/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
od14970/2021_2022/IA : Supply, Installation & Testing of Chain Pulley Block, Manual Operated, 3 ton Capacity x 15 mt. Chain Length, BEMCO Mumbai or equivalent.
od14034/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
od15401/2021_2022/IA : Dismantling The existing Split Case pump of 110 HP motor from foundation and suction, delivery pipes ,Lifting the same in to the platform, lowering the spare Kirlosker made split case pump ,erecting the pump on the foundation with Suction and Delivery pipes, Coupling with motor, Correcting the alignment and trial run on full load.
Part 4_ Lifting
od14087/2021_2022/IA : Lifting the 125 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od14088/2021_2022/IA : Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
od14089/2021_2022/IA : Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
od14090/2021_2022/IA : Lifting the 75 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
od14017/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of Pampakuda Relift LIS (175 HP x 3 Nos, 5 HP x 1 No )
Part 1 _ Over Hauling And Refitting
od14095/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14096/2021_2022/IA : Dismantling 175 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od14097/2021_2022/IA : Refitting the vacuum motor up to 5 HP on the base plate, coupling with pump, giving connections to the motor, starter and other electrical accessories etc in position, checking correct alignment, testing and trial run on full load
od14098/2021_2022/IA : Refitting above 175 HP motor on the base plate coupling with pump, refitting the starter, regulator, TP switch, other electrical accessories etc in position giving connections, checking correct alignment, testing and trial run on full load
Part 2 _ AMC
od14045/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od14099/2021_2022/IA : Fully Comprehensive Annual Maintenance of 175 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Part 3 _ Consumable Supplies(Should be supplied and errected with in 3 months from the date of Agreement)
od14469/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
od45358/2021_2022/IA : Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45359/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45360/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45361/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45362/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 150 HP motor / pump set as per the direction of Departmental staff at site.
od15403/2021_2022/IA : Disconnecting the 800 A ACB from mains and dismantling ,Removing dust, foreign bodies, cleaning with petrol, drying, replacing damaged contacts & minor repairs etc and making the ACB ready for normal operations and reassembling, testing and trial run etc as required .
90.14.24.29 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.40 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of Ramamangalam No :1 LIS (80 HP x 2 Nos, 5 HP x 1 No )
Part 1_ Lowering and Overhauling
od15684/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od15685/2021_2022/IA : Lowering down and erecting the 80 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14095/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od15689/2021_2022/IA : Dismantling the 80 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od15691/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od15692/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od15693/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 80 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od15694/2021_2022/IA : Fully Comprehensive Annual Maintenance of 80HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Part 3 _ Consumable Supplies(Should be supplied and errected with in 3 months from the date of Agreement)
od45401/2021_2022/IA : Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45402/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 110 or equivalent suitable for 80 HP motor's fully automatic star delta starter
od45403/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45404/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45405/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 80 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.26 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.20 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
2.15.2 : Supplying and fixing following rating, four pole, (three phase and neutral), 415 volts, residual current circuit breaker (RCCB), having a sensitivity current 30 mA in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps
Part 4_ Lifting
od15697/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od15698/2021_2022/IA : Lifting the 80 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of LI Scheme Ramamgalam -IV LIS (135 HP x 2 Nos, 5 HP x 1 Nos )
Part 1_ Lowering and Overhauling
od15684/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od15741/2021_2022/IA : Lowering down and erecting the 135 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od14095/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od15742/2021_2022/IA : Dismantling 135 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od15691/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od15692/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od15743/2021_2022/IA : Fully Comprehensive Annual Maintenance of 135 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od15744/2021_2022/IA : Fully Comprehensive Annual Maintenance of 135 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Part 3_ Consumable Supplies(Should be supplied and errected with in 3 months from the date of Agreement)
od45390/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45391/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 225 or equivalent suitable for 135 HP motor's fully automatic star delta starter
od45392/2021_2022/IA : Supply, and fixing 630 A, 415 V, DIN type fuse base. and giving connections as required
od45400/2021_2022/IA : Supply and installation of 100 A Neutral Link
od45394/2021_2022/IA : Supply, and providing 315A - 425 A, 415 V, DIN type fuse link size 3
od45395/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45396/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45397/2021_2022/IA : Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one,L&T or equivalent make.
od45398/2021_2022/IA : Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45399/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 135 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.28 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
od15755/2021_2022/IA : Supply and installation of dust and vermin proof wall mounting , sintex makemeter box of size 1000X690X215 mm GSMB 10069 ( IP65 ) or equivalent suitable for fixing KSEB meter,fuse units,CT etc hinged door construction for the front sidewith compartments if necessary,providing vision panel for the meter compartment knock out for cable entry and exit IP65 with neutral CT as required including fixing it on transformer plinth making good the damages etc. as required.
od16035/2021_2022/IA : Supply and Installation of 70 sq mm, 3.3 KV XLPE single core PVC Insulated aluminum cable suitable for service connection.
od16036/2021_2022/IA : Supply and Installation of 300 sq mm, 3.3 KV XLPE single core PVC Insulated aluminum cable suitable for service connection.
od16052/2021_2022/IA : 70 sq mm Aluminum socket for end termination
od16053/2021_2022/IA : 300 sq mm Aluminum socket for end termination
od16051/2021_2022/IA : Dismantling The existing Split Case pump of 135 HP motor from foundation and suction, delivery pipes ,Lifting the same in to the platform, loading into the vehicle and transporting to nearest workshop, repairing the pump crack by cast iron welding, Re transport to pump house and refitting the same. Correcting the alignment and trial run on full load.(Including material,convayance and labour)
Part 4_ Lifting
od15697/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od15745/2021_2022/IA : Lifting the above 135 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
SHIJU M.T
Bidder Name
SHIJU M.T
GK INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_681868.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .