Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.6 Cr+₹14.8 L (4.27%)Rejected-Finance RAMSEWAKPURAM COLONY HARIHAR PUR NILMAYA SAROJININAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹3.6 Cr+₹14.8 L (4.27%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹9.2 L
Closing Date
29 Jul 2024, 1:00 pmClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
RESTORATION AND DEMARCATION OF PUR DISTRUBUTARY FROM KM. 0.000 TO KM. 28.800 IN DISTRICT BALLIA LOT 02
2024_UPIDC_938692_2
03/S.E./2024-25
Open Tender
Civil Works - Canal
Item Wise
270 days
Ballia
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹9.2 L
Superintending Engineer, Drainage Circle, Ballia
23 Oct 2024
20 Jul 2024
29 Jul 2024
23 Jul 2024
29 Jul 2024
23 Jul 2024
23 Jul 2024
Amount
Earth work for diversion and making jeepable service road including all cost of material T&P and labour etc.
Dismentling of old damged RCC work and its proper disposal including stacking of material within a distance of 60 m as per direction of engineer in charge
Dismentling of old and damged BRICK work and its proper disposal including stacking of material within a distance of 60 m as per direction of engineer in charge
Earth work in digging foundation in all type of soil with 30 m lead &1.5 m lift including refilling the trenches and proper disposal of excess earth as per direction of engineer in charge
Laying C.C. 1:3:6(M10) in foundation with cement,coarse sand and stone grit (20-40 mm) having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
1st class Brick work in 1:4 CM with Ist class bricks and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Deep struck cement pointing in 1:2 CM with cement and coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.
Centering and shuttering for R.C.C. work for bridge span upto 3m including cost of materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Centering and shuttering for R.C.C/R.B work the rate including labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Centering and shuttering for PCC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Centering and shuttering for P.C.C. in foundation & in lining work including all labour and T&P with all leads and up lift/down lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
Cutting bending & binding of steel in slab the rate including all cost of material ,T&P With Proper Completion of work
Laying CC (1:1.5:3) M-20 with cement, coarse sand having FM not less than 2.0 and hard stone grit 10 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) M-15 with cement, coarse sand having FM not less than 2.0 and hard stone grit 10 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:1:2) M-25 with cement, coarse sand having FM not less than 2.0 and hard stone grit 10 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
C.C 1:6:12 with brick ballast bellow cc in bed including all cost of material ,T&P With Proper Completion of work
Removing of diversion with proper disposal including lift upto 1.5m and lead upto 30m including all cost of material ,T&P With Proper Completion of work.
Laying Local sand filling for making base of concrete including cost of all materials ,labour and T&P with all lead and lift for proper completion of work as directed by engineer in charge as per drawing and ID specification
Laying coarse sand filling for making base of concrete including cost of cost of all materials ,labour and T&P with all lead and lift for proper completion of work as directed by engineer in charge as per drawing and ID specification
Laying stone grit fill in the 50 mm thick size (12.5-20 mm) for making base of concrete including cost of cost of all materials ,labour and T&P with all lead and lift for proper completion of work as directed by engineer in charge as per drawing and ID specification
Supplying and laying LDPE film 200 micron thick first grade below CC lining including cost of all material, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. Specification
12 mm thick plaster in 1:4 CM with coarse sand having F.M. not less than 2.0 including cost of material, labour and T&P etc. required for porper completion of the work.
12 mm thick plaster in 1:3 CM with coarse sand having F.M. not less than 2.0 including cost of material, labour and T&P etc. required for porper completion of the work.
Supply and Fixing of P.V.C. Pipe 110 mm for outlet spout incliuding all labour and T&P etc required for proper completion of work
Supply and Fixing of P.V.C. Pipe 160 mm for outlet spout incliuding all labour and T&P etc required for proper completion of work
Fixing of RCC precast boundery piller including all cost of material, labour and T&P etc, required for proper complition of work as per direction of Engineer -in -charge.
Write letter including cost of material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.
Painting of parapet & boundary pilleras per approved brand & manufacture such as Berger,Asian Paints after thoroughly brushing the surface free from mortar dropping including all cost of material, labour and T&P etc required for proper complition of work as per direction of Engineer -in -charge.
Repair of Regulator (febrication of steel sheet,spendal rod,oiling greasing etc)&painting including all cost of material T&P and labour etc.
Uprooting moonj and narkul grass with proper disposal including all cost of material ,T&P With Proper Completion of work
Earth work in cutting for maintaining section with proper dressing and manual compaction including all cost of material, initial lead 30 m. and lift 1.50 m., T&P and labour etc.
Earth work in filling for maintaining section with proper disposal dressing and manual compaction including all cost of material T&P and labour etc.
Dumping And Placing Of old dismentling Brick ballast U/S &D/S including stacking of material within a distance of 60 m as per direction of engineer in charge
Supplying and laying PVC Pipe in abutment and wing wall 50mm dia including material, labour,T&P etc. complete work directed by Engineer-in-charge.
Boring with 150 mm dia casing pipe including lowering and extraction of assembly loading unloading and carriage. one boring have 5 meter water dia water dewatering capacity so no. of including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge
Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
M/s Rai Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .