Loading…
Loading…
Tender Value
₹49.0 L
EMD Value
₹49,050
Closing Date
27 Feb 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Veraval-Patan Joint Nagarpalika, Veraval
PROPOSED CC ROAD AT HAADI SAMAJ, BAGE REHMAT AND VENESHWAR MAIN ROAD AT VERAVAL DIST. GIR-SOMNATH
276215
Muni./P.W.D./2652
Open
Civil Works - Roads
Gir Somnath
3 documents required · 3 mandatory
₹1,500
Veraval Patan Joint Municipality Veraval
₹49,050
13 Feb 2026
13 Feb 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
Name of Work : PROPOSED CC ROAD AT HAADI SAMAJ, BAGE REHMAT AND VENESHWAR
MAIN ROAD AT VERAVAL DIST. GIR-SOMNATH
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Dismentaling tiled of stone floors laid in
mortar including stacking of serviceable
materilas and disposal of unserviceable
510.00 materials with all lead and lift. 51.45 Sq.Mt
Providing and laying cement concrete 1:3:6
(1- cement : 3- coarse sand : 6- Crushed
stone aggregate 40 mm. Nominal size) and
2 curing complete excluding cost of form work
in :(a) Foundation and plinth
Providing and casting in situ ordinary trimix
cement concrete M-200 for avg.125 mm
thick road work laid as directed including
providing and laying using "C" type Channel
of road thickness with necessary fixing as per
width applying plate vibrator (electric or
diesel) on channel by using all necessary
equipments & material & machinery for
levelling, floating and power trovelling
etc.curing and filling joints with bitumen as
directed etc.complete.
Tracing of old Manhole. All Types Of Manhole
4 at Every 30 Mt.
Modification of Existing House Connection
Chambers, Risening up to 23cm. average of
0.23m wide R.c.c Copping with Inside 15mm
Thick Cement Plaster, Curing and
Dismentaling existing Chamber's Precast
cement frame and Cover and also fitting the
copping work as directed as required and
also refitting of existing house connection
chamber's coller and cover as required.
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Box cutting the road surface to proper slope
and camber for making a base for road work
6 including removing the excavated stuff and
depositing on the road side slope as directed
upto 50Mt.lead.
Providing & laying spreading and compacting
150mm thick WBM Grade - II of B.T.M.C.
metal 40mm to 63mm size including using
20% (13+7%) filler i.e. stone screeing
mm at the rate 0.16 Cumt. & 0.08 stone dust
including spreading in uniform thickness
hand packing rolling with vibratory roller 8-
10 tonnes in stages to proper garde and
7 cmaber applying and brooming required
types of screening/binding materials to fill up
the interstices of coarse aggregate watering
and compacting to the required density.
All the work shall be carried out as per MOST specification and specification on the division or as
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all
2) respects and held gross for under all conditions, site moisture weather etc.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73
3) with detail of specification and details of work and amount involved at site without any payment as
directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be
tested in G.E.R.I. Bill for testing shall be paid by the CHIEF OFFICER and 1% of the (one percent)
4) of amount put to tender after shall be recovered from the running account bills of the works. (As
per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
5) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract
payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
6) 12.12.04. Implementation of building and other construction workers regulation of equipments and
conditions of service Act-1996)
Estimated Unit Total Amount
Estimated Unit Total Amount
Quantities Rates according to
Item Estimated in Figure estimated
Item Descrption
No. but may be quantities.
Photographs of before work and after work will be submitted by the contractor at the time of Each
7) bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will
8) not entertain any contractor representation to reimburse any financial burden due to applicable
taxes : i.e. GST etc.
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001_DTP_01_R0.pdf
002_Schedule B_01_R0.pdf
Download all tender documents and submit your bid