| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Below Est rate |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance Above Est Rate |
| Sl No | Description | Qty | Unit | PANDIYAN K L1 | Mohamed Hanifa L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the Road MKS road to Moottakkampatty R 85 Km 0/0-2/110 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,828.92 | Sqm | 6 ₹16,973.52 | 6 ₹16,973.52 |
| 3.00 | Picking 5cm to 10cm Old Mettaled Surface and Sectioning | 2,644.12 | Sqm | 23 ₹60,814.76 | 23 ₹60,814.76 |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 1,393.56 | Cum | 140 ₹2.0 L | 141 ₹2.0 L |
| 5.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 589.36 | Cum | 341 ₹2.0 L | 342 ₹2.0 L |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 991.55 | Cum | 3,117 ₹30.9 L | 3,129 ₹31.0 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 7,932.37 | Sqm | 88 ₹7.0 L | 88 ₹7.0 L |
| 8.00 | providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 7,965 | Sqm | 21 ₹1.7 L | 21 ₹1.7 L |
| 9.00 | Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 199.13 | cum | 12,296 ₹24.5 L | 12,342 ₹24.6 L |
| 10.00 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface | 424 | Sqm | 889 ₹3.8 L | 892 ₹3.8 L |
Tender Value
₹1.2 Cr
EMD Value
₹1.3 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Collector/Chairman, DRDA, Karur
Collector/Chairman, DRDA, Collectorate, Karur
Strengthening the road from MKS road to Moottakkampatty R 85
2026_RDTN_657146_23
DIPR.1044/Tenders/2026
Open Tender
Civil Works - Roads
180 days
District Rural Development Agency
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.3 L
Yes
District Rural Development Agency, Karur
1 Apr 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Strengthening the Road MKS road to Moottakkampatty R 85 Km 0/0-2/110
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5cm to 10cm Old Mettaled Surface and Sectioning
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Construction of RCC 1.50m Slab Culvert at ch765m of MKS road to Moottakkampatty R 85
Earth work excavation for foundation in all clauses of soils and subsoils to full depth may be directed except in hard rock requiring blasting but inclusive of shoring strutting and whenever necessary of complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Suppling and erecting centering for sides centering for soffits of plane surface for ground level strutting using mild steel sheets of size 90cm x 60cm complyig with standard specification.Below GL
Suppling and erecting centering for sides centering for soffits of plane surface for ground level strutting using mild steel sheets of size 90cm x 60cm complyig with standard specification.Above GL
Cement concrete 1:3:6 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification.
Cement concrete 1:2:4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Bed Block.
Reinforced Cement concrete 1:11/2:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Deck Slab.
Providing weep holes in Stone Masonry
Provision for fixing 20mm Bitumen pad for expansion joint between dirtwall and deckslab etc complete
Provision for fixing tarpaper for bearing between Bed block and Deck slab etc complete
Construction of RCC 1.50m Slab Culvert at ch2110 m of of MKS road to Moottakkampatty R 85
Earth work excavation for foundation in all clauses of soils and subsoils to full depth may be directed except in hard rock requiring blasting but inclusive of shoring strutting and whenever necessary of complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Suppling and erecting centering for sides centering for soffits of plane surface for ground level strutting using mild steel sheets of size 90cm x 60cm complyig with standard specification.Below GL
Suppling and erecting centering for sides centering for soffits of plane surface for ground level strutting using mild steel sheets of size 90cm x 60cm complyig with standard specification.Above GL
Cement concrete 1:3:6 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification.
Cement concrete 1:2:4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Bed Block.
Reinforced Cement concrete 1:11/2:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Deck Slab.
Providing weep holes in Stone Masonry
Provision for fixing 20mm Bitumen pad for expansion joint between dirtwall and deckslab etc complete
Provision for fixing tarpaper for bearing between Bed block and Deck slab etc complete
Construction of Retaining wall at CH 825 M OF mks road to Moottakakampatty
Earth work excavation for foundation in all clauses of soils and subsoils to full depth may be directed except in hard rock requiring blasting but inclusive of shoring strutting and whenever necessary of complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
BGL Supplying and erection centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam beams roof slabs staircase steps bed rock blocks critical pier etc using mild steel.
Cement concrete 1:3:6 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Provision for weep hole pipes etc complete
Provision for Guard stones etc complete
Construction of Retaining wall at CH 2110 M OF mks road to Moottakakampatty
Earth work excavation for foundation in all clauses of soils and subsoils to full depth may be directed except in hard rock requiring blasting but inclusive of shoring strutting and whenever necessary of complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
BGL Supplying and erection centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam beams roof slabs staircase steps bed rock blocks critical pier etc using mild steel.
Cement concrete 1:3:6 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Provision for weep hole pipes etc complete
Provision for Guard stones etc complete
Provision for 60cm Chevaron Sign Octagon Board
Provision for Road Stud with Lens Reflector
Provision for HM Stone
Provision for KM Stone
Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
24Technicalbid.pdf
Tender Documents • 2.29 MB
24Pricebid.pdf
Additional Documents • 1.46 MB
BOQ_789528.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid