Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 CrAccepted-Finance | ₹4.2 Cr | 1 | Accepted-Finance H1 |
| 2 | 2₹3.2 Cr−₹1 Cr (23.8%)Rejected-Finance | ₹3.2 Cr−₹1 Cr (23.8%) | 2 | Rejected-Finance H2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | P.G. CONSTRUCTIONS L1 | Abhishek Baby L2 |
|---|---|---|---|---|---|
| 1.00Desiltation | |||||
| 1.01 | Desilting the reservoir by removing deposited sediments - wet excavation using suitable methods such as pneumatic suction pumps or cutter suction dredgers or any similar equipment or sophisticated machines & dry excavation using mechanical means such as hydraulic excavator or any similar equipment or sophisticated machine so as to produce a solid output of not less than 1800 cubic meter per day from the locations defined and for a depth specified in the desilting plan which shall in no case go beyond the original ground level of the reservoir including transporting desilted materials, separating components, stacking in measurable form, treating water and disposal of debris complete. Charges for desiltation includes the charges for; dumping the sediments at one or more locations identified in the Environment Management Plan (EMP) and approved by the departmental officers, providing and shifting the pipelines to convey the removed sediments to the stacking yard including all labour charges, incidental charges and service tax and all other charges, separating the components such as pebble, gravel, sand, clay and residue from the removed sediments, stacking the components in measurable form, treating the water pumped along with the sediments from reservoir to retrieve the quality of water to that of reservoir water quality before desiltation and allow the treated water to flow back to the reservoir/stream, disposal of debris to an environmentally acceptable place adhering to the emission standards of Central Pollution Control Board and/or the Kerala State Pollution Control Board in compliance with the environmental regulations and instructions stipulated in EMP including all lead and lift, all labour charges, incidental charges and service tax, hire charges of the pneumatic suction pump or cutter suction dredger or any similar or sophisticated equipment, all tools and plants and accessories, fuel charges, idling and mobilization charges etc. complete in accordance with the norms specified in the Standard Operating Procedure, Environment Management Plan and Government regulations. The desiltation shall be carried out as per the tender requiremnets / conditons and desilting procedure should be done in consonance with the Standard Operating Procedure (SOP) adopted for desiltation of the reservoirs by the State of Kerala. | 40,000 | cum | 800 ₹3,20,00,000 Lowest | 1,050 ₹4,20,00,000 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
9 Dec 2025, 11:15 amClosed
Chief Engineer, KIIDC
KIIDC,KWA Campus, Vellayambalam, Thiruvananthapuram
Desiltation
2025_KIIDC_820262_1
KIIDC / AUCTION / 08 / 2025-26
Open Tender
Civil Works - Others
Item Rate
365 days
Idukki
Please refer tender document
4 documents required · 4 mandatory
₹19,518
₹5 L
21 Mar 2026
7 Nov 2025
12 Dec 2025
7 Nov 2025
9 Dec 2025
7 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Desiltation | |||||
| 1.01 | Desilting the reservoir by removing deposited sediments - wet excavation using suitable methods such as pneumatic suction pumps or cutter suction dredgers or any similar equipment or sophisticated machines & dry excavation using mechanical means such as hydraulic excavator or any similar equipment or sophisticated machine so as to produce a solid output of not less than 1800 cubic meter per day from the locations defined and for a depth specified in the desilting plan which shall in no case go beyond the original ground level of the reservoir including transporting desilted materials, separating components, stacking in measurable form, treating water and disposal of debris complete. Charges for desiltation includes the charges for; dumping the sediments at one or more locations identified in the Environment Management Plan (EMP) and approved by the departmental officers, providing and shifting the pipelines to convey the removed sediments to the stacking yard including all labour charges, incidental charges and service tax and all other charges, separating the components such as pebble, gravel, sand, clay and residue from the removed sediments, stacking the components in measurable form, treating the water pumped along with the sediments from reservoir to retrieve the quality of water to that of reservoir water quality before desiltation and allow the treated water to flow back to the reservoir/stream, disposal of debris to an environmentally acceptable place adhering to the emission standards of Central Pollution Control Board and/or the Kerala State Pollution Control Board in compliance with the environmental regulations and instructions stipulated in EMP including all lead and lift, all labour charges, incidental charges and service tax, hire charges of the pneumatic suction pump or cutter suction dredger or any similar or sophisticated equipment, all tools and plants and accessories, fuel charges, idling and mobilization charges etc. complete in accordance with the norms specified in the Standard Operating Procedure, Environment Management Plan and Government regulations. The desiltation shall be carried out as per the tender requiremnets / conditons and desilting procedure should be done in consonance with the Standard Operating Procedure (SOP) adopted for desiltation of the reservoirs by the State of Kerala. | 40,000 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_1375273.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .