Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC | L1 | Accepted-AOC Quoted amount is lowest and reasonable | |
| 2 | L2₹23.9 L+₹67,595.80 (2.91%)Rejected-Finance | L2 | Rejected-Finance Quoted amount is not lowest and not reasonable | |
| 3 | L3₹24.4 L+₹1.2 L (4.98%)Rejected-Finance | L3 | Rejected-Finance Quoted amount is not lowest and not reasonable | |
| 4 | L4₹24.7 L+₹1.5 L (6.51%)Rejected-Finance | L4 | Rejected-Finance Quoted amount is not lowest and not reasonable | |
| 5 | L5₹25.7 L+₹2.5 L (10.8%)Rejected-Finance | L5 | Rejected-Finance Quoted amount is not lowest and not reasonable |
| Sl No | Description | Qty | Unit | M/s friend enterprises L1 | M/S KAMLESHWAR SINGH L7 | M/S DEEPAK KUMAR SINHA L3 | ganpati enterprises L9 | simplex infra project L6 | M/S Sai Construction L4 | M/s Popatlal A Rathod L2 | Modernage Constructions Pvt. Ltd. L5 | M/S PARAS NATH SINGH L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down complete existing roof /parapet treatment any thickness including plastering, leaping plaster of any thickness cutting & up rooting tree roots/Vegitable growth & removing the all loose particle from roof & all debris from the premises upto 500m from the MOD land including cleaning/washing down and keeping surfaces clean complete all as specified and as directed. | 230 | Sqm | 50 ₹11,500 | 55 ₹12,650 | 60 ₹13,800 | 60 ₹13,800 | 20 ₹4,600 Lowest | 300 ₹69,000 | 85 ₹19,550 | 40 ₹9,200 | 60 ₹13,800 |
| 2.00 | M & L for plain cement concrete (PCC) (1:2:4) ,type B-0 (using 12.5mm graded crushed stone aggregate) as in padding, benching, sunken portion etc., on roof surface for correcting/ required/making proper slope on roof, etc.,and finished the surface without using extra cement complete all as specified and directed. | 4 | Cum | 6,500 ₹26,000 | 6,500 ₹26,000 | 7,000 ₹28,000 | 7,000 ₹28,000 | 8,000 ₹32,000 | 8,000 ₹32,000 | 6,000 ₹24,000 | 5,500 ₹22,000 Lowest | 7,000 ₹28,000 |
| 3.00 | M & L for application of water proofing treatment using APP modified roof membrane over non accessible/non approachable RCC roof slab /chajjah/canopy /parapet wall( horizontal /vertical surface) to be executed through approved applicator of the membrane manufacturer/authorized applicator of the manufacturer with following specification etc complete all as specified and directed :-(a) Cleaning existing naked roof surface properly with wire brush. (b) Applying for rendering 10 mm thick in cement mortar 1:3 on concrete / brick surfaces mixed with polymer based liquid water proofing compound @ 200 ml/50 Kg per Bag of cement ,finished, even and smooth without using extra cement over roof / sunken slab /wall complete
(c) Applying approved bituminous based primer(conforming to IS: 3384-1995) @ 0.50 litre / Sqm manufactured by the same agency as that of APP membrane with a density 0.87-0.89 Kg per liter at 25 degree centigrade on prepared surface.
(d) Laying not less than 3mm thick APP (Atactic polypropylene Polymer modified prefabricated membrane) modified water proofing membrane weighing not less than 3.00 Kg/Sqm reinforced with non woven polyster fiber weight not less than 160gms/Sqm using butane torch by torch application with 10cm side laps and 15cm end lap. Physical property of membrane shall be as under :- (i) Membrane weight not less than 3.00 Kg/Sqm.
(ii) Non woven polyester weight not less than 160 gms/Sqm.
(iii) Softening point of membrane not less than 150 degree Celsius.
(iv) Joint tensile strength-longitudinal not less than 150 Kg / Sqcm and transverse not less than 450 Kg /Sq.cm at 230 degree Celsius.
(v) Tear strength - longitudinal not less than 300 N & transverse not less than 250N.
(vi) Elongation of reinforcement not less than 30%.
(vii) Impermeability under water pressure not less than 3 Kg/Sqcm.
(e) APP modified polymeric membrane shall be laid using butane torch by Torch application with minimum 10cm side overlap and 15cm end lap. (f) Applying two coat of bituminious based Aluminium Paint @ 0.3 Kg /Sqm over APP Membrane. | 230 | Sqm | 650 ₹1,49,500 Lowest | 950 ₹2,18,500 | 800 ₹1,84,000 | 700 ₹1,61,000 | 1,200 ₹2,76,000 | 900 ₹2,07,000 | 800 ₹1,84,000 | 700 ₹1,61,000 | 700 ₹1,61,000 |
| 4.00 | S&F rotational moulded polythene water storage tank of capacity 1000 ltrs (Cylindrical/vertical with closed type), triple layer construction, ISI marked, hoisted and fixed in position including 20 mm bore GI nipple and 20 mm bore ball/ float valves high pressure of PTMT with epoxy coated aluminium rod & high density plastic ball screwed for iron pipe and fixed (minimum weight 210 gms) including taking down of existing tank complete all as specified and directed. | 4 | Each | 13,000 ₹52,000 | 16,000 ₹64,000 | 14,000 ₹56,000 | 14,000 ₹56,000 | 11,000 ₹44,000 | 7,200 ₹28,800 Lowest | 13,000 ₹52,000 | 14,500 ₹58,000 | 14,000 ₹56,000 |
| 5.00 | S & F in repair 20mm dia Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and directed. | 4 | Each | 750 ₹3,000 Lowest | 900 ₹3,600 | 800 ₹3,200 | 750 ₹3,000 Lowest | 1,000 ₹4,000 | 800 ₹3,200 | 1,600 ₹6,400 | 850 ₹3,400 | 750 ₹3,000 Lowest |
| 6.00 | S & F in repair 15mm dia Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and directed. | 4 | Each | 700 ₹2,800 | 700 ₹2,800 | 750 ₹3,000 | 800 ₹3,200 | 900 ₹3,600 | 700 ₹2,800 | 1,200 ₹4,800 | 650 ₹2,600 Lowest | 800 ₹3,200 |
| 7.00 | Taking up or down steel tubing and connections of 20 mm bore or removal to store complete etc and making good the disturbed surface in cement mortar 1:3 complete all as specified & directed. | 60 | Rm | 60 ₹3,600 | 60 ₹3,600 | 50 ₹3,000 | 70 ₹4,200 | 100 ₹6,000 | 30 ₹1,800 | 25 ₹1,500 Lowest | 85 ₹5,100 | 70 ₹4,200 |
| 8.00 | S&F for GI water tubing medium grade, ISI marked, galvanised, 20 mm bore with all fittings, (such as tee, elbow, socket, union & short pieces) fixed to walls /laid in trenches and ceiling or laid in floors including cutting chasees for brick walls and making good the surface in cement mortar 1:3 complete all as specified & directed. | 60 | Rm | 50 ₹3,000 Lowest | 400 ₹24,000 | 60 ₹3,600 | 60 ₹3,600 | 100 ₹6,000 | 400 ₹24,000 | 320 ₹19,200 | 385 ₹23,100 | 60 ₹3,600 |
| 9.00 | Taking up or down steel tubing and connections of 15 mm bore or removal to store complete etc and making good the disturbed surface in cement mortar 1:3 complete all as specified & directed. | 40 | Rm | 50 ₹2,000 | 50 ₹2,000 | 50 ₹2,000 | 50 ₹2,000 | 100 ₹4,000 | 2,500 ₹1,00,000 | 25 ₹1,000 Lowest | 85 ₹3,400 | 50 ₹2,000 |
| 10.00 | S&F for GI water tubing medium grade, ISI marked, galvanised, 15 mm bore with all fittings, (such as tee, elbow, socket, union & short pieces) fixed to walls /laid in trenches and ceiling or laid in floors including cutting chasees for brick walls and making good the disturbed surface in cement mortar 1:3 complete all as specified & directed. | 40 | Rm | 800 ₹32,000 | 300 ₹12,000 | 900 ₹36,000 | 900 ₹36,000 | 100 ₹4,000 Lowest | 260 ₹10,400 | 255 ₹10,200 | 295 ₹11,800 | 900 ₹36,000 |
Tender Value
₹24.7 L
EMD Value
₹49,440
Closing Date
2 Sept 2025, 6:00 pmClosed
GE Ramgarh
GE Ramgarh Cantt
SPECIAL REPAIR TO BLDG NO P-345 CHQ COOK HOUSE AT SRC RAMGARH CANTT
2025_MES_724399_1
8300/3336/E8
Open Tender
Civil Works
Item Rate
180 days
Ramgarh Cantt
As per tender documents
6 documents required · 6 mandatory
₹500
GE RAMGARH CANTT
₹49,440
Yes
4 Nov 2025
4 Aug 2025
9 Sept 2025
4 Aug 2025
2 Sept 2025
26 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .