Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC VILL CHAYANPUR P O BOROI P S HARISHCHANDRAPUR MALDA | HARISHCHANDRAPUR | MALDA | WEST BENGAL | ₹1.8 Cr | L1 | Accepted-AOC Quoted lowest rate by the bidder |
| 2 | L2₹1.9 Cr+₹14.3 L (8.16%)Rejected-Finance | ₹1.9 Cr+₹14.3 L (8.16%) | L2 | Rejected-Finance Quoted rate higher than L1 bidder |
| 3 | L3₹1.9 Cr+₹16.1 L (9.17%)Rejected-Finance 557 DUM DUM PARK TANK NO 3 KOLKATA 700 055 | KOLKATA | KOLKATA | WEST BENGAL | 700055 | ₹1.9 Cr+₹16.1 L (9.17%) | L3 | Rejected-Finance Quoted rate higher than L1 and L2 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Did not fulfill eligibility criteria |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
10 Feb 2022, 4:00 pmClosed
SE,NTKC, PHEDTE
Office of the Superintending Engineer, New Town Kolkata Water Supply Circle Administrative Building 1st Floor, Water Treatment Plant Site, Tank No.-I, New Town, Rajarhat, Kolkata- 700 156
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along right side of St. No. 714 (for 600mm dia) at AA-IIG
2022_PHED_360731_1
PHE /NTKC/SE/NIeT-03/2021-2022
Open Tender
CIVIL WORKS
Percentage
90 days
work
Please refer Tender documents.
6 documents required · 6 mandatory
₹3.5 L
OFFICE OF THE SE,NTKC, PHE DTE
27 May 2022
14 Jan 2022
15 Feb 2022
14 Jan 2022
10 Feb 2022
17 Jan 2022
21 Jan 2022
eProcurement System of Government of West Bengal Created By: DEBASHIS BANERJEE Created Date/Time: 21-Mar-2022 01:51 PM Tender Title: Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along right side of St. No. 714 (for 600mm dia) at AA-IIG Tender ID: 2022_PHED_360731_1
Tender Inviting Authority: Superintending Engineer, New Town Kolkata Water Supply Circle, PHE Dte.
Name of Work: Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along right side of St. No. 714 (for 600mm dia) at AA-IIG under NTK project. (Sl. No. 1)
Contract No: NOTICE INVITING ELECTRONIC TENDER NO. PHE /NTKC/SE/NIeT-03/2021-2022
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 G. B. CONSTRUCTION AND CO.(GSTN-19AAJFG3075C1ZH) 17638598.73 8.50 19137879.92 One Crore Ninty One Lakh Thirty Seven Thousand Eight Hundred and Seventy Nine
2.00 FNC CONSTRUCTION AND CO(GSTN-19AAAFF4987B1ZE) 17638598.73 7.50 18961493.93 One Crore Eighty Nine Lakh Sixty One Thousand Four Hundred and Ninty Three
3.00 AZAD ENTERPRISE(GSTN-19ARRPS7091K1ZO) 17638598.73 5.91 18681040.20 One Crore Eighty Six Lakh Eighty One Thousand Fourty
Lowest Amount Quoted BY: AZAD ENTERPRISE(18681040.20)
BOQ Summary Details Tender Title: Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along right side of St. No. 714 (for 600mm dia) at AA-IIG Tender ID: 2022_PHED_360731_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 AZAD ENTERPRISE 18681040.20 L1
2 FNC CONSTRUCTION AND CO 18961493.93 L2
3 G. B. CONSTRUCTION AND CO. 19137879.92 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .