Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | ₹18.7 L | L1 | Accepted-AOC below rate |
| 2 | L2₹18.8 LRejected-AOC | ₹18.8 L | L2 | Rejected-AOC above rate |
| Sl No | Description | Qty | Unit | K VENKATACHALAM L1 | LAXMI NARAYANA ROAD SAFETY SYSTEMS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and clearing away existing for RCC by manual / by using deploying
machineries Work including cost of conveyance and labour charges at site, other incidental charges etc., complete | 4 | M3 | 4,308.7 ₹17,234.80 | 4,310 ₹17,240 |
| 2.00 | Dismantling and clearing away existing for AC Sheet Roofing without roof timbers Work including cost of conveyance and labour charges at site, other incidental charges etc., complete | 110 | M3 | 17.6 ₹1,936 | 18 ₹1,980 |
| 3.00 | Dismantling and clearing away existing for Plain Cement Concrete Work including cost of conveyance and labour charges at site, other incidental charges etc., complete | 2 | M3 | 486.2 ₹972.40 | 490 ₹980 |
| 4.00 | Dismantling and clearing away existing for Brick / Stone Masonry in lime mortar walls under 3m high Work including cost of conveyance and labour charges at site, other incidental charges etc., complete | 51 | M3 | 231 ₹11,781 | 235 ₹11,985 |
| 5.00 | Dismantling and clearing away existing for Pressed Tiles and Weathering Course Work including cost of conveyance and labour charges at site, other incidental charges etc., complete | 305 | M2 | 45.9 ₹13,999.50 | 46 ₹14,030 |
| 6.00 | Dismantling and clearing away existing for damaged IWC Set including cost of conveyance and labour charges at site, other incidental charges etc., complete | 7 | Nos | 750 ₹5,250 | 755 ₹5,285 |
| 7.00 | Dismantling and clearing away existing for Doors and windows including removal of frames, hinges and fastenings including cost and conveyance at site of labour charges etc. complete | 30 | M3 | 153.5 ₹4,605 | 155 ₹4,650 |
| 8.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 70 | M3 | 205.6 ₹14,392 | 210 ₹14,700 |
| 9.00 | Supplying and filling in foundation and basement with filling M.Sand in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 5.73 | M3 | 1,513.9 ₹8,674.65 | 1,515 ₹8,680.95 |
| 10.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7.08 | M3 | 5,130.4 ₹36,323.23 | 5,135 ₹36,355.80 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
12 Nov 2025, 3:00 pmClosed
Commissioner
Azad Road, Karur
Repair and Maintenance works to Corporation Pasupatheeswara Girls Hr Sec School in Karur City municipal corporation
2025_MAWS_620694_9
E1/4371/2025
Open Tender
Civil Works
90 days
KCMC
Pre qualification and EMD scan Copy
2 documents required · 2 mandatory
₹0
₹25,000
2 May 2026
8 Nov 2025
12 Nov 2025
8 Nov 2025
12 Nov 2025
8 Nov 2025
8 Nov 2025 - 12 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_742878.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid