Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-AOC KHATA NO 254 529 KHASRA NO 364 2 MIN PREET NAGAR A GALI NO 2 HARERI ROAD OPP STAR STUDIO HERARI SANGRUR | SANGRUR | SANGRUR | PUNJAB | ₹15.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.7 LRejected-Finance | ₹15.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹16.1 LRejected-Finance | ₹16.1 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Applicant not Fulfill the eligblity criteria. |
| Sl No | Description | Qty | Unit | SARJIT SINGH AND CO. L3 | JINDAL AND COMPANY L1 | NEW GURBINDER INDUSTRIES L2 |
|---|---|---|---|---|---|---|
| 1.00 | M&L for Racking out of old existing sealant compound and back up rod of the existing joints 10mm wide by special tools like cutting blades/ machines, widening of joints 2mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. The depth of sealant above back rod 8mm. . Thereafter filled with closed cell, medium density, crossed linked polyethylene foam backup rod of 8 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant meeting the requirements mentioned BS-5212 , BS 4254 and EN – 141875- 2003 with minimum movement accommodation factor (MAF) of +/- 30% complete all as specified and directed by Engr-in-Charge. | 875 | X RM | 1,080 ₹9.4 L | 900 ₹7.9 L | 999 ₹8.7 L |
| 2.00 | M&L for Racking out of old existing sealant compound and back up rod of the existing joints 14mm wide by special tools like cutting blades/ machines, widening of joints 2mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. The depth of sealant above back rod 12mm. . Thereafter filled with closed cell, medium density, crossed linked polyethylene foam backup rod of 12mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant meeting the requirements mentioned BS-5212 , BS 4254 and EN – 141875- 2003 with minimum movement accommodation factor (MAF) of +/- 30% complete all as specified and directed by Engr-in-Charge. | 300 | X RM | 1,260 ₹3.8 L | 1,100 ₹3.3 L | 1,250 ₹3.8 L |
| 3.00 | Racking out of old existing sealant compound and back up rod of the existing joints 25mm wide by special tools like cutting blades/ machines, widening of joints 2mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. The depth of sealant above back rod 8mm. Thereafter filled with 25mm thick compressible polyethylene closed cell type filler board as specified, over it filled with closed cell, medium density, crossed linked polyethylene foam backup rod of 30 mm dia for complete length of the joint. Finally filled with polyurethane joint sealant meeting the requirements mentioned BS-5212 , BS 4254 and EN – 141875- 2003 with minimum movement accommodation factor (MAF) of +/- 30% complete all as specified and directed by Engr-in-Charge.
Note :- Any joint of width if axceeding 25mm would also be measured under this item. The quoted rates would deemed to have included this item.
Note: 01 to 03 item: Rate quoted by bidder is deemed to be inclusive of all the equipment for removing old sealant and filling the sealant. Also, rate quoted is deemed to be inclusive of sealant, backup rod and filler board. | 200 | X RM | 1,440 ₹2.9 L | 2,150.5 ₹4.3 L | 1,624 ₹3.2 L |
Updated dates
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
7 Feb 2026, 6:00 pmClosed
HQ CWE (AF) BHISIANA
HQ CWE (AF) BHISIANA
REPAIR TO JOINT FILLING OF RUNWAY, DISPERSALS AND BLAST PENS IN TECH AREA AT AF STN HALWARA UNDER GE (AF) HALWARA
2026_MES_748195_1
CWE(BHI)/HAL-70/2025-26
Open Tender
Civil Works
180 days
HALWARA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (AF) HALWARA
₹40,000
Yes
6 Apr 2026
12 Jan 2026
9 Feb 2026
12 Jan 2026
7 Feb 2026
26 Jan 2026
12 Jan 2026 - 14 Jan 2026
M&L for Racking out of old existing sealant compound and back up rod of the existing joints 10mm wide by special tools like cutting blades/ machines, widening of joints 2mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. The depth of sealant above back rod 8mm. . Thereafter filled with closed cell, medium density, crossed linked polyethylene foam backup rod of 8 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant meeting the requirements mentioned BS-5212 , BS 4254 and EN – 141875- 2003 with minimum movement accommodation factor (MAF) of +/- 30% complete all as specified and directed by Engr-in-Charge.
M&L for Racking out of old existing sealant compound and back up rod of the existing joints 14mm wide by special tools like cutting blades/ machines, widening of joints 2mm by using joint cutting blades of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. The depth of sealant above back rod 12mm. . Thereafter filled with closed cell, medium density, crossed linked polyethylene foam backup rod of 12mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant meeting the requirements mentioned BS-5212 , BS 4254 and EN – 141875- 2003 with minimum movement accommodation factor (MAF) of +/- 30% complete all as specified and directed by Engr-in-Charge.
stage.html
html • 0.05 MB
technical_837871.pdf
techsummary_837871.pdf
finance_837871.pdf
BOQ Comparative Chart
xlsx
finsummary_837871.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TENDER70.pdf
Tender Documents • 0.92 MB
BOQ_837871.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid