Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.8 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.9 LRejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.9 L | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹2.0 LRejected-Finance ENA ISLAMPUR BHAGGATDIH NEAR BHAGGATDIH WEIGHT BRIDGE DHANBAD DHANBAD 828106 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828106 | ₹2.0 L | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | GOLDEN AUTO ELECTRIC WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
DESCRIPTION OF WORK:
SL.
NO. DESCRIPTION
1- Steering Cylinder Complete Dismantling Fitting.
2- Steering Cylinder Bore Portion Scratch Welding, Machining, Honing & Polishing Proper Size.
3- Steering Cylinder Eye Rod Welding Repairing, Machining, Bearing Size.
4- Steering Cylinder Piston Damaged Welding, Repairing, Machining & New Thread Making Proper Size.
5- Silencer Pipe with Box Complete Removing Fitting & Welding, Repairing, Cutting.
6- Hours Miter Repairing Removing Fitting.
7- Stop Cable Removing & Changing, Fitting.
8- Manifold Gasket Removing Changing, Fitting.
9- Engine Water Pump Removing & Changing, Fitting.
10- Dismantling & Fitting Complete Differential Crown Gear Wheel with Tail Pinion Bearing, Bevel Gear, Spider Kit etc.
11- Differential Crown Gear Housing, Welding, Repairing, Machining by Suitable Electrodes Proper Size.
12- Differential Crown Gear Body Welding, Repairing, Machining, Making by Suitable Electrodes Proper Size.
13- Dismantling & Fitting Complete Differential Bull Gear Assly. with Bull Shaft Assly etc.
14- Rear Both Side Axle Differential Trumpet Housing Complete Dismantling, Fitting.
15- Rear Both Side Axle Differential Trumpet Housing, Welding, Repairing, Bearing Size & Oil Seal Size by Suitable Electrodes.
16- Rear Both Side Axle Shaft Complete Removing Dismantling, Fitting.
17- Rear Both Side Brake Disc. Assly. Complete Refacing.
18- Rear Both Side Brake Adjuster Came Removing, Changing, Fitting.
19- Rear Both Side Chassis Brake Removing, Fitting.
20- Rear Both Side Brake Liner Assly. Removing & Changing, Fitting.
21- Brake Unloader Valve Removing & Changing, Fitting.
22- Brake Treadle Valve Overhauling, Fitting.
23- Engine Oil Filter, Fuel Filter, Air Filter Removing & Changing, Fitting.
24- Engine Tappet Cover Removing Gasket Changing, Fitting.
SPARES/MATERIALS COST :-
SL.
NO. DESCRIPTION QNTY.
1- Rear Axle Differential Trumpet Housing Bearing Big. 2 Nos.
2- Rear Axle Differential Trumpet Housing Bearing Small. 2 Nos.
3- Rear Axle Differential Trumpet Housing Brake Liner. 8 Nos.
4- Rear Axle Differential Trumpet Housing Brake Came. 4 Nos.
5- Rear Axle Differential Trumpet Housing Steel Spring. 8 Nos.
6- Rear Axle Differential Trumpet Housing Steel Ball. 8 Nos.
7- Rear Axle Differential Trumpet Housing Link Pin. 4 Nos.
8- Rear Axle Differential Trumpet Housing Liver. 4 Nos.
9- Rear Axle Differential Trumpet Housing Seal Gasket Kit. 2 Sets.
10- Rear Axle Differential Trumpet Housing Cotter Pin. 10 Nos.
11- Rear Axle Differential Trumpet Housing Hex Nut. 8 Nos.
12- Rear Axle Differential Trumpet Housing Bearing Big. 10 Nos.
13- Differential Tail Crown Gear Bearing. 2 Nos.
14- Differential Tail Crown Gear Bevel Gear with Spider Kit. 1 Set.
15- Differential Tail Crown Gear Niddle Case Bearing. 2 Nos.
16- Differential Tail Crown Gear Gasket Kit. 1 Set.
17- Differential Tail Crown Gear Bolt with Nut. 8 Nos.
18- Differential Tail Crown Gear Checknut. 1 Set.
19- Differential Tail Crown Gear Shim. 10 Nos.
20- Differential Tail Crown Gear Lock Patti. 6 Nos.
21- Steering Cylinder Repair Kit. 2 Sets.
22- Steering Cylinder Bearing. 4 Nos.
23- Steering Cylinder Pin. 4 Nos.
24- Steering Cylinder Piston. 1 No.
25- Steering Cylinder Bright Washer. 8 Nos.
26- Engine Water Pump Assly. 1 No.
27- Manifold Gasket. 1 No.
28- Stop Cable. 1 No
29- Brake Unloader Valve Assly. 1 No.
30- Brake Treadle Valve Repair Kit. 1 Set.
31- Engine Oil Filter, Fuel Filter. 1 Set.
32- Engine Air Filter/AC Element. 1 Set.
33- Engine Mounting with Bolt. 2 Sets.
34- Chassis Frame Bolt. 2 Nos.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 1,84,995 ₹1.8 L | 1,94,500 ₹1.9 L | 1,96,800 ₹2.0 L |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.9 L
EMD Value
₹2,411
Closing Date
17 Nov 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA OFFICE
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of shakti crane JH10CW 2049 like complete rear axle, differential trumpet housing dismantling and welding , repairing rear axle housing bearing, brake liner of machine working at DOCP Kusunda Area
2025_BCCL_347104_1
BCCL/KA-VI/EXC/E-TEN/25-26/104
Open Tender
Excavation Department Work
8 days
ADIC KUSUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,411
4 Jan 2026
10 Nov 2025
18 Nov 2025
10 Nov 2025
17 Nov 2025
10 Nov 2025
Amount
Item Description/ Heading
Jobs to be done: DESCRIPTION OF WORK: SL. NO. DESCRIPTION 1- Steering Cylinder Complete Dismantling Fitting. 2- Steering Cylinder Bore Portion Scratch Welding, Machining, Honing & Polishing Proper Size. 3- Steering Cylinder Eye Rod Welding Repairing, Machining, Bearing Size. 4- Steering Cylinder Piston Damaged Welding, Repairing, Machining & New Thread Making Proper Size. 5- Silencer Pipe with Box Complete Removing Fitting & Welding, Repairing, Cutting. 6- Hours Miter Repairing Removing Fitting. 7- Stop Cable Removing & Changing, Fitting. 8- Manifold Gasket Removing Changing, Fitting. 9- Engine Water Pump Removing & Changing, Fitting. 10- Dismantling & Fitting Complete Differential Crown Gear Wheel with Tail Pinion Bearing, Bevel Gear, Spider Kit etc. 11- Differential Crown Gear Housing, Welding, Repairing, Machining by Suitable Electrodes Proper Size. 12- Differential Crown Gear Body Welding, Repairing, Machining, Making by Suitable Electrodes Proper Size. 13- Dismantling & Fitting Complete Differential Bull Gear Assly. with Bull Shaft Assly etc. 14- Rear Both Side Axle Differential Trumpet Housing Complete Dismantling, Fitting. 15- Rear Both Side Axle Differential Trumpet Housing, Welding, Repairing, Bearing Size & Oil Seal Size by Suitable Electrodes. 16- Rear Both Side Axle Shaft Complete Removing Dismantling, Fitting. 17- Rear Both Side Brake Disc. Assly. Complete Refacing. 18- Rear Both Side Brake Adjuster Came Removing, Changing, Fitting. 19- Rear Both Side Chassis Brake Removing, Fitting. 20- Rear Both Side Brake Liner Assly. Removing & Changing, Fitting. 21- Brake Unloader Valve Removing & Changing, Fitting. 22- Brake Treadle Valve Overhauling, Fitting. 23- Engine Oil Filter, Fuel Filter, Air Filter Removing & Changing, Fitting. 24- Engine Tappet Cover Removing Gasket Changing, Fitting. SPARES/MATERIALS COST :- SL. NO. DESCRIPTION QNTY. 1- Rear Axle Differential Trumpet Housing Bearing Big. 2 Nos. 2- Rear Axle Differential Trumpet Housing Bearing Small. 2 Nos. 3- Rear Axle Differential Trumpet Housing Brake Liner. 8 Nos. 4- Rear Axle Differential Trumpet Housing Brake Came. 4 Nos. 5- Rear Axle Differential Trumpet Housing Steel Spring. 8 Nos. 6- Rear Axle Differential Trumpet Housing Steel Ball. 8 Nos. 7- Rear Axle Differential Trumpet Housing Link Pin. 4 Nos. 8- Rear Axle Differential Trumpet Housing Liver. 4 Nos. 9- Rear Axle Differential Trumpet Housing Seal Gasket Kit. 2 Sets. 10- Rear Axle Differential Trumpet Housing Cotter Pin. 10 Nos. 11- Rear Axle Differential Trumpet Housing Hex Nut. 8 Nos. 12- Rear Axle Differential Trumpet Housing Bearing Big. 10 Nos. 13- Differential Tail Crown Gear Bearing. 2 Nos. 14- Differential Tail Crown Gear Bevel Gear with Spider Kit. 1 Set. 15- Differential Tail Crown Gear Niddle Case Bearing. 2 Nos. 16- Differential Tail Crown Gear Gasket Kit. 1 Set. 17- Differential Tail Crown Gear Bolt with Nut. 8 Nos. 18- Differential Tail Crown Gear Checknut. 1 Set. 19- Differential Tail Crown Gear Shim. 10 Nos. 20- Differential Tail Crown Gear Lock Patti. 6 Nos. 21- Steering Cylinder Repair Kit. 2 Sets. 22- Steering Cylinder Bearing. 4 Nos. 23- Steering Cylinder Pin. 4 Nos. 24- Steering Cylinder Piston. 1 No. 25- Steering Cylinder Bright Washer. 8 Nos. 26- Engine Water Pump Assly. 1 No. 27- Manifold Gasket. 1 No. 28- Stop Cable. 1 No 29- Brake Unloader Valve Assly. 1 No. 30- Brake Treadle Valve Repair Kit. 1 Set. 31- Engine Oil Filter, Fuel Filter. 1 Set. 32- Engine Air Filter/AC Element. 1 Set. 33- Engine Mounting with Bolt. 2 Sets. 34- Chassis Frame Bolt. 2 Nos. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
SHRI DURGA AUTOMOBILES (BID ID -1196326)
GOLDEN AUTO ELECTRIC WORKS (BID ID -1196331)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_359794.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_359794.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid