Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹1.9 L+₹9,505 (5.14%)Rejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | L3₹2.0 L+₹11,805 (6.38%)Rejected-Finance ENA ISLAMPUR BHAGGATDIH NEAR BHAGGATDIH WEIGHT BRIDGE DHANBAD DHANBAD 828106 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828106 | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | GOLDEN AUTO ELECTRIC WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
DESCRIPTION OF WORK:
SL.
NO. DESCRIPTION
1- Steering Cylinder Complete Dismantling Fitting.
2- Steering Cylinder Bore Portion Scratch Welding, Machining, Honing & Polishing Proper Size.
3- Steering Cylinder Eye Rod Welding Repairing, Machining, Bearing Size.
4- Steering Cylinder Piston Damaged Welding, Repairing, Machining & New Thread Making Proper Size.
5- Silencer Pipe with Box Complete Removing Fitting & Welding, Repairing, Cutting.
6- Hours Miter Repairing Removing Fitting.
7- Stop Cable Removing & Changing, Fitting.
8- Manifold Gasket Removing Changing, Fitting.
9- Engine Water Pump Removing & Changing, Fitting.
10- Dismantling & Fitting Complete Differential Crown Gear Wheel with Tail Pinion Bearing, Bevel Gear, Spider Kit etc.
11- Differential Crown Gear Housing, Welding, Repairing, Machining by Suitable Electrodes Proper Size.
12- Differential Crown Gear Body Welding, Repairing, Machining, Making by Suitable Electrodes Proper Size.
13- Dismantling & Fitting Complete Differential Bull Gear Assly. with Bull Shaft Assly etc.
14- Rear Both Side Axle Differential Trumpet Housing Complete Dismantling, Fitting.
15- Rear Both Side Axle Differential Trumpet Housing, Welding, Repairing, Bearing Size & Oil Seal Size by Suitable Electrodes.
16- Rear Both Side Axle Shaft Complete Removing Dismantling, Fitting.
17- Rear Both Side Brake Disc. Assly. Complete Refacing.
18- Rear Both Side Brake Adjuster Came Removing, Changing, Fitting.
19- Rear Both Side Chassis Brake Removing, Fitting.
20- Rear Both Side Brake Liner Assly. Removing & Changing, Fitting.
21- Brake Unloader Valve Removing & Changing, Fitting.
22- Brake Treadle Valve Overhauling, Fitting.
23- Engine Oil Filter, Fuel Filter, Air Filter Removing & Changing, Fitting.
24- Engine Tappet Cover Removing Gasket Changing, Fitting.
SPARES/MATERIALS COST :-
SL.
NO. DESCRIPTION QNTY.
1- Rear Axle Differential Trumpet Housing Bearing Big. 2 Nos.
2- Rear Axle Differential Trumpet Housing Bearing Small. 2 Nos.
3- Rear Axle Differential Trumpet Housing Brake Liner. 8 Nos.
4- Rear Axle Differential Trumpet Housing Brake Came. 4 Nos.
5- Rear Axle Differential Trumpet Housing Steel Spring. 8 Nos.
6- Rear Axle Differential Trumpet Housing Steel Ball. 8 Nos.
7- Rear Axle Differential Trumpet Housing Link Pin. 4 Nos.
8- Rear Axle Differential Trumpet Housing Liver. 4 Nos.
9- Rear Axle Differential Trumpet Housing Seal Gasket Kit. 2 Sets.
10- Rear Axle Differential Trumpet Housing Cotter Pin. 10 Nos.
11- Rear Axle Differential Trumpet Housing Hex Nut. 8 Nos.
12- Rear Axle Differential Trumpet Housing Bearing Big. 10 Nos.
13- Differential Tail Crown Gear Bearing. 2 Nos.
14- Differential Tail Crown Gear Bevel Gear with Spider Kit. 1 Set.
15- Differential Tail Crown Gear Niddle Case Bearing. 2 Nos.
16- Differential Tail Crown Gear Gasket Kit. 1 Set.
17- Differential Tail Crown Gear Bolt with Nut. 8 Nos.
18- Differential Tail Crown Gear Checknut. 1 Set.
19- Differential Tail Crown Gear Shim. 10 Nos.
20- Differential Tail Crown Gear Lock Patti. 6 Nos.
21- Steering Cylinder Repair Kit. 2 Sets.
22- Steering Cylinder Bearing. 4 Nos.
23- Steering Cylinder Pin. 4 Nos.
24- Steering Cylinder Piston. 1 No.
25- Steering Cylinder Bright Washer. 8 Nos.
26- Engine Water Pump Assly. 1 No.
27- Manifold Gasket. 1 No.
28- Stop Cable. 1 No
29- Brake Unloader Valve Assly. 1 No.
30- Brake Treadle Valve Repair Kit. 1 Set.
31- Engine Oil Filter, Fuel Filter. 1 Set.
32- Engine Air Filter/AC Element. 1 Set.
33- Engine Mounting with Bolt. 2 Sets.
34- Chassis Frame Bolt. 2 Nos.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 1,84,995 ₹1,84,995 Lowest | 1,94,500 ₹1,94,500 | 1,96,800 ₹1,96,800 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.9 L
EMD Value
₹2,411
Closing Date
17 Nov 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA OFFICE
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of shakti crane JH10CW 2049 like complete rear axle, differential trumpet housing dismantling and welding , repairing rear axle housing bearing, brake liner of machine working at DOCP Kusunda Area
2025_BCCL_347104_1
BCCL/KA-VI/EXC/E-TEN/25-26/104
Open Tender
Excavation Department Work
Item Rate
8 days
ADIC KUSUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,411
4 Jan 2026
10 Nov 2025
18 Nov 2025
10 Nov 2025
17 Nov 2025
10 Nov 2025
Amount
Item Description/ Heading
Jobs to be done: DESCRIPTION OF WORK: SL. NO. DESCRIPTION 1- Steering Cylinder Complete Dismantling Fitting. 2- Steering Cylinder Bore Portion Scratch Welding, Machining, Honing & Polishing Proper Size. 3- Steering Cylinder Eye Rod Welding Repairing, Machining, Bearing Size. 4- Steering Cylinder Piston Damaged Welding, Repairing, Machining & New Thread Making Proper Size. 5- Silencer Pipe with Box Complete Removing Fitting & Welding, Repairing, Cutting. 6- Hours Miter Repairing Removing Fitting. 7- Stop Cable Removing & Changing, Fitting. 8- Manifold Gasket Removing Changing, Fitting. 9- Engine Water Pump Removing & Changing, Fitting. 10- Dismantling & Fitting Complete Differential Crown Gear Wheel with Tail Pinion Bearing, Bevel Gear, Spider Kit etc. 11- Differential Crown Gear Housing, Welding, Repairing, Machining by Suitable Electrodes Proper Size. 12- Differential Crown Gear Body Welding, Repairing, Machining, Making by Suitable Electrodes Proper Size. 13- Dismantling & Fitting Complete Differential Bull Gear Assly. with Bull Shaft Assly etc. 14- Rear Both Side Axle Differential Trumpet Housing Complete Dismantling, Fitting. 15- Rear Both Side Axle Differential Trumpet Housing, Welding, Repairing, Bearing Size & Oil Seal Size by Suitable Electrodes. 16- Rear Both Side Axle Shaft Complete Removing Dismantling, Fitting. 17- Rear Both Side Brake Disc. Assly. Complete Refacing. 18- Rear Both Side Brake Adjuster Came Removing, Changing, Fitting. 19- Rear Both Side Chassis Brake Removing, Fitting. 20- Rear Both Side Brake Liner Assly. Removing & Changing, Fitting. 21- Brake Unloader Valve Removing & Changing, Fitting. 22- Brake Treadle Valve Overhauling, Fitting. 23- Engine Oil Filter, Fuel Filter, Air Filter Removing & Changing, Fitting. 24- Engine Tappet Cover Removing Gasket Changing, Fitting. SPARES/MATERIALS COST :- SL. NO. DESCRIPTION QNTY. 1- Rear Axle Differential Trumpet Housing Bearing Big. 2 Nos. 2- Rear Axle Differential Trumpet Housing Bearing Small. 2 Nos. 3- Rear Axle Differential Trumpet Housing Brake Liner. 8 Nos. 4- Rear Axle Differential Trumpet Housing Brake Came. 4 Nos. 5- Rear Axle Differential Trumpet Housing Steel Spring. 8 Nos. 6- Rear Axle Differential Trumpet Housing Steel Ball. 8 Nos. 7- Rear Axle Differential Trumpet Housing Link Pin. 4 Nos. 8- Rear Axle Differential Trumpet Housing Liver. 4 Nos. 9- Rear Axle Differential Trumpet Housing Seal Gasket Kit. 2 Sets. 10- Rear Axle Differential Trumpet Housing Cotter Pin. 10 Nos. 11- Rear Axle Differential Trumpet Housing Hex Nut. 8 Nos. 12- Rear Axle Differential Trumpet Housing Bearing Big. 10 Nos. 13- Differential Tail Crown Gear Bearing. 2 Nos. 14- Differential Tail Crown Gear Bevel Gear with Spider Kit. 1 Set. 15- Differential Tail Crown Gear Niddle Case Bearing. 2 Nos. 16- Differential Tail Crown Gear Gasket Kit. 1 Set. 17- Differential Tail Crown Gear Bolt with Nut. 8 Nos. 18- Differential Tail Crown Gear Checknut. 1 Set. 19- Differential Tail Crown Gear Shim. 10 Nos. 20- Differential Tail Crown Gear Lock Patti. 6 Nos. 21- Steering Cylinder Repair Kit. 2 Sets. 22- Steering Cylinder Bearing. 4 Nos. 23- Steering Cylinder Pin. 4 Nos. 24- Steering Cylinder Piston. 1 No. 25- Steering Cylinder Bright Washer. 8 Nos. 26- Engine Water Pump Assly. 1 No. 27- Manifold Gasket. 1 No. 28- Stop Cable. 1 No 29- Brake Unloader Valve Assly. 1 No. 30- Brake Treadle Valve Repair Kit. 1 Set. 31- Engine Oil Filter, Fuel Filter. 1 Set. 32- Engine Air Filter/AC Element. 1 Set. 33- Engine Mounting with Bolt. 2 Sets. 34- Chassis Frame Bolt. 2 Nos. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
SHRI DURGA AUTOMOBILES (BID ID -1196326)
GOLDEN AUTO ELECTRIC WORKS (BID ID -1196331)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_359794.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_359794.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .