| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.0 L+₹33,038.53 (4.32%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAJEESH P P L1 | BABUS ANTONY L2 |
|---|---|---|---|---|---|
| 1.00Side Protection wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 51.2 | cum | 303.17 ₹15,522.3 Lowest | 316.27 ₹16,193.02 |
| 1.00 | OD329725/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.
complete as per direction of Departmental officers at site | 159.2 | cum | 3,445.35 ₹5,48,499.72 Lowest | 3,657.66 ₹5,82,299.47 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.68 | cum | 8,839.94 ₹67,890.74 | 7,888.31 ₹60,582.22 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 14.12 | sqm | 325.44 ₹4,595.21 | 313.69 ₹4,429.3 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 428.16 | kilogram | 95.18 ₹40,752.27 Lowest | 98.84 ₹42,319.33 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 581.7 | kg | 137.8 ₹80,158.67 Lowest | 142.68 ₹82,997.38 |
| 1.01 | OD335487/2025-2026:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications Excluding appropriate priming coat, preparation of surface, etc. complete.
On steel work | 54.34 | sqm | 126.96 ₹6,899.13 Lowest | 156.32 ₹8,494.59 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.12 | cum | 7,125.8 ₹819.47 Lowest | 7,484.64 ₹860.73 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
5 Nov 2025, 6:00 pmClosed
Martin Charles
LID EW SECTION PAYAM GP
Payam Gramapanchayath 2025 26 Project NO 319 2026 Retaining Wall at Kallumutti Shopping complex back side for Happeness Park General Civil Work
2025_LSGD_816414_8
05 2025 26 AE LID EW PGP
Open Tender
Civil Works - Others
Item Rate
payam grama panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,183
Yes
10 Feb 2026
29 Oct 2025
7 Nov 2025
29 Oct 2025
5 Nov 2025
29 Oct 2025
Amount
Side Protection wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD329725/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
OD335487/2025-2026:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications Excluding appropriate priming coat, preparation of surface, etc. complete. On steel work
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
BABUS ANTONY (BID ID -2429744)
Bidder Name
BABUS ANTONY
RAJEESH P P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1367646.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.03 MB
BOQ_1367646.xls
BOQ • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .