Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹14,229.35 (10.8%)Rejected-AOC KOOLETTU HOUSE NEERIKKADU P O KOTTAYAM 686564 | KOTTAYAM | KOTTAYAM | KERALA | 686564 | ₹1.5 L+₹14,229.35 (10.8%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 L+₹35,406.35 (26.9%)Rejected-AOC CHOCHUPARAMBIL ERATTUPETTA | IDUKKI | KERALA | 685501 | ₹1.7 L+₹35,406.35 (26.9%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | kjthomas L2 | XAVIER C M L1 | SHAHUL HAMEED L3 |
|---|---|---|---|---|---|---|
| 1.00Clearing | ||||||
| 1.00 | OD15218/2026-2027:Removal of Water Hyacinth using Hydraulic Excavator (3D) on Pontoon with Driver and Fuel for 8 hours work per day ( Average output of Hydraulic Excavator per Hours 150m2) and Dumping the Deposits within 150m as per the Directions of Departmental Officers at Site | 11,755 | sqm | 12.2 ₹1,43,411 | 9.57 ₹1,12,495.35 Lowest | 14 ₹1,64,570 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 6 | each | 377 ₹2,262 Lowest | 3,158.05 ₹18,948.3 | 380 ₹2,280 |
Tender Value
₹1.5 L
EMD Value
₹3,645
Closing Date
13 Jul 2026, 10:30 amClosed
Assistant Executive Engineer
Assistant Executive Engineer Irrigation Sub division Kaduthuruthy
Clearing of water hyacinth
2026_Irrig_859874_1
IRR/IA/TR/3755/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Kottathodu - Thonnikadavu thodu and Karikkathara
Please refer tender documents
9 documents required · 9 mandatory
₹555
Yes
₹3,645
Yes
20 Aug 2026
9 Jul 2026
14 Jul 2026
9 Jul 2026
13 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing | |||||
| 1.001 | OD15218/2026-2027:Removal of Water Hyacinth using Hydraulic Excavator (3D) on Pontoon with Driver and Fuel for 8 hours work per day ( Average output of Hydraulic Excavator per Hours 150m2) and Dumping the Deposits within 150m as per the Directions of Departmental Officers at Site | - | sqm | - | - |
| 1.002 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1454006.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 0.27 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.07 MB
Tendernotice_7.pdf
PDF • 0.47 MB
BOQ_1454006.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .