Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAccepted-Finance | ₹21.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹22.1 L+₹58,725 (2.73%)Rejected-Finance | ₹22.1 L+₹58,725 (2.73%) | L2 | Rejected-Finance L2 |
| 3 | L3₹24.3 L+₹2.8 L (13.0%)Rejected-Finance VILLAGE DUBOR P O TIMBI TEHSIL SHILLAI DISTRICT SIRMOUR H P | TIMBI | SIRMOUR | HIMACHAL PRADESH | 173027 | ₹24.3 L+₹2.8 L (13.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹24.8 L+₹3.3 L (15.1%)Rejected-Finance R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹24.8 L+₹3.3 L (15.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹25.8 L+₹4.3 L (20.0%)Rejected-Finance | ₹25.8 L+₹4.3 L (20.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹39.1 L
EMD Value
₹78,500
Closing Date
20 Aug 2026, 5:00 pmClosed
Er. Yogesh Sharma
Executive Engineer HPPWD Division Shillai.
(SH -Formation Cutting 5/7 mtrs wide road from Km 0/0 to 4/00 )Under MMGSY
2026_PWD_140942_1
NIT 3588-3687 dated 07.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Shillai
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹78,500
1 Sept 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work, jumperwork and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including, dewatering wherever required, setting out to the required lines, levels as shown on the drawing and directed by the Engineer-in-Charge at site., according to HP.PWD specifications of 1990 ( One thousand nine hundred ninety) volume-I (One) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor at his own cost) as per satisfaction of Engineer - in - chrage through all modes of transportation including head load , animal load or mechanical means along with its leveling fine dressing and with all kinds of lobour , machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All usefull material, such as stones, shingles, aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used / removed as per the direction of the Engineer -in- Chrage. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. Note:- The contractor has to stock at least 823.57(Eight Hundred Twenty three point fifty seven ) Cubic meter of stones along with road and road over to the department other wise recoverd of un stacked quanitity will be recoverd @ of Rs. 300/- ( Three hundred ) per Cubic meter. | 27,452.49 | Per cubic metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.66 MB
SBDkathwarmangola01.pdf
Tender Documents • 3.11 MB
BOQ_209157.xls
BOQ • 0.27 MB
corridatetime.pdf
PDF • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .