| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance | ₹3.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.0 L+₹42,810.45 (11.9%)Accepted-Finance | ₹4.0 L+₹42,810.45 (11.9%) | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | - | - | Not Admitted-Fee/PreQual/Technical Others-3 Years experience in Topographical survey work is not submitted. |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-3 Years experience in Topographical survey work is not submitted. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-3 Years experience in Topographical survey work is not submitted. |
| Sl No | Description | Qty | Unit | JAMSHAD NASEERI P.K L2 | Lamanto T. Somervell L1 |
|---|---|---|---|---|---|
| 1.00Topographical survey | |||||
| 1.00 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | 0.45 | Hectare | 4,141 ₹1,863.45 Lowest | 10,000 ₹4,500 |
| 1.00 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 4.88 | Hectare | 7,000 ₹34,139 Lowest | 10,000 ₹48,770 |
| 2.00Soil Investigation works | |||||
| 2.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 15,798 ₹15,798 Lowest | 78,000 ₹78,000 |
| 2.00 | 56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. | 100 | sqm | 29 ₹2,900 Lowest | 29 ₹2,900 Lowest |
| 2.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 5 | Bore Holes | 3,000 ₹15,000 Lowest | 3,000 ₹15,000 Lowest |
| 2.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 2,500 ₹1,25,000 | 900 ₹45,000 Lowest |
| 2.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 2,500 ₹1,25,000 | 600 ₹30,000 Lowest |
| 2.01 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 1,000 ₹50,000 | 600 ₹30,000 Lowest |
Tender Value
₹5.5 L
EMD Value
₹13,656
Closing Date
15 Sept 2026, 11:00 amClosed
Executive engineer
O/o Executive Engineer,RIQCL,EKM
Mobilization Setting up Boring soil upto60m Soft and hard rock SPT Recovery of Disturbed samples Compilation and recommendation of foundation by geotechnologist Topo Survey includes Total station surveyfor conducting survey works for above sites
2026_PWD_868119_1
PWD/DE/TR/13155/2026_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
North paravur
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,205
₹13,656
17 Sept 2026
7 Sept 2026
17 Sept 2026
7 Sept 2026
15 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Topographical survey | |||||
| 1.001 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). | 0.45 | Hectare | - | - |
| 1.002 | 56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. | 4.88 | Hectare | - | - |
| 2Soil Investigation works | |||||
| 2.001 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | - | - |
| 2.002 | 56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. | 100 | sqm | - | - |
| 2.003 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 5 | Bore Holes | - | - |
| 2.004 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | - | - |
| 2.005 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | - | - |
| 2.006 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
checklist.pdf
Other Document • 0.13 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1470328.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .