Loading…
Loading…
Tender ID
Tender Value
₹37.3 L
EMD Value
₹38,000
Closing Date
16 Feb 2026, 6:00 pmClosed
Executive Engineer, Drainage Division Gandhinagar, Gandhinagar
Providing AND Supplying Dual Plate Check Vale (Non Return Valve) of Horizontal Turbine Pump No - 01 to 06 at Labhor Pumping Station and 200 AH, 110V, DC Battery-Backup Set at Labhor, Fatepur AND Khed Pumping Station of Hathmati Guhai Pipeline Project (With Buy back of Old NRV and Old Battery Set )
271633
12 of 2025 – 2026
Open
Miscellaneous Services
Works
Gandhinagar
10 documents required · 10 mandatory
₹1,500
Yes
Executive Engineer Drainage Division Gandhinagar
₹38,000
Yes
31 Jan 2026
31 Jan 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
Quantities Rate Total Amount
estimated but may Item of work Unit according to estimated
be more or less quantities
Providing, Supplying and installation of 200 AH, 110V, DC Battery Backup Set with
2 3.00 Buy Back of Old Battery Set at Pumping Station Including Necessary Testing, 348000.00 Set
Supervised Installation, Comissioning.
Providing and Supplying D.I. Duel Plate Check Valve (Non Return Valve) 1000 mm
dia. PN 1.6 including Loading Unloading and Freight.
The Existing Dual Plate Check Valve ( NRV ) 1000 MM Dia. which shall be the property of contractor and it has to be removed from site as quick
Note: as possible. The buyback amount shall be debited as follow as i.e. Rs. 2,18,400/- ( In Words Rupees Two lakh eighteen thousand and four
hundred only) shall be deducted from 1st Running bill and GST shall be paid on the remaining amount on the bill.
I/We am/are willing to carry out the work at …………….. % above/below percent (Should be written in figure
and words.) of estimated rates mentioned above. Amount of my/our tender works as under.
*Estimated Amount Put *Estimated Amount Put
To Tender. Rs. 3732000.00 To Tender. Rs.
Net Rs………………………………. Add …………% Above Rs………………
Net Rs…………………..
In Words… In Words …
*please strikeout whichever is not applicable.
Note:1 All the works shall be carried out as per Public Works Department hand book and other
specification of division or as directed.
Note: 2, all the columns in schedule should be filled and the total of entries in last column should
be struked by the contractor under his signature.
Note: 3, Rates quotes includes clearance of sites ( prior commencement of work and at its close)
in all respect and hold good work under all conditions, site moisture, weather etc.
Dated signature of Deputy Executive Engineer Executive Engineer
WRI Sub division Drainage division
Talod Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 -NIT- NRV Tender Notice 12.pdf
03 SBD NRV AND Battery Talod PS.pdf
04 Schedule B with Rate.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .