Loading…
Loading…
Tender ID
Tender Value
₹1.2 Cr
EMD Value
₹1 L
Closing Date
12 May 2026, 5:30 pmClosed
GENERAL MANAGER (M&C)
BI-ANNUAL RATE CONTRACT FOR RUNNING INDUSTRIAL CANTEEN AT GUJARAT INDUSTRIES POWER COMPANY LIMITED, VADODARA FOR THE PERIOD 2026-28
298326
GIPCL / BRD / CANTEEN / 2026-2028
Open
Administration - Catering/Canteen
Works
Vadodara
₹2,950
In favor of Gujarat Industries Power Co. Ltd. and payable at Vadodara
₹1 L
22 Apr 2026
22 Apr 2026
22 Apr 2026
12 May 2026
22 Apr 2026
6 PART- I: TECHNICAL BID 19
7 Annexure- D General Terms & Condition & Scope of Work. 23
8 Annexure- E: Details of Facilities to be Provided by GIPCL. 49
9 Annexure- F: Details of Daily Lunch Menu and Snack item 50
10 Annexure-G: Details of Service points and schedule timing for 54
providing canteen services.
11 Annexure - H: Schedule of Deviation 56
12 Annexure- I: Proforma of bank Guarantee for EMD 57
13 Annexure- J: Proforma of Bank Guarantee for contract security 59
14 Annexure-K: Instruction to fill Price Bid 61
15 Annexure-L: Declaration to be submitted by bidder 64
15. Annexure-M & N: (a) Declaration for safety law and regulation 65
compliance. (b) Declaration for contractual disputes / litigations.
16. Annexure-O: Declaration to be submitted by bidder for blacklisting 66
of firm/company.
(Separate Annexure)
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
BI-ANNUAL RATE CONTRACT FOR RUNNING INDUSTRIAL CANTEEN AT
GUJARAT INDUSTRIES POWER COMPANY LIMITED, VADODARA FOR THE
PERIOD 2026-2028.
NOTICE INVITING TENDER (NIT)
Name of work BI-ANNUAL RATE CONTRACT FOR RUNNING
INDUSTRIAL CANTEEN AT GUJARAT INDUSTRIES
POWER COMPANY LIMITED, VADODARA FOR
THE PERIOD 2026-2028.
Place of work AT & POST: RANOLI, TALUKA: VADODARA, DIST:
VADODARA. PIN: 391 350 (GUJARAT)
Period of Contract 24 (Twenty-four) months from the date of award of LOI /
Award of Work Order.
EMD Rs.1,00,000/- (Rupees One Lakh only) by Demand Draft
payable at Vadodara or as per attached format of Bank
Guarantee in favour of GIPCL from approved Banks
mentioned in this tender.
Cost of tender document / tender Rs.2,950/- (Including 18%GST) (Rupees Two Thousand
fee (Non-refundable) Nine Hundred Fifty only) by Demand Draft in favour of
GIPCL payable at Vadodara.
Availability of Tender document On website: http://nprocure.com
Downloading of tender document Till tender due date up to 17.30 hrs.
Last date of online submission of 12/05/2026 Up to 17.30 hrs. from website:
offer http://nprocure.com
Submission of EMD, Tender fee On or before the last date of online submission of offer
and other supporting documents during office hours i.e. 17:30 hours at Vadodara Office.
for technical bid in physical form in
the below mentioned address.
E-Reverse Auction E-Reverse Auction will be executed through website:
https://e-auction.nprocure.com (Schedule will be intimated
later on to eligible bidders).
1. Amendment / corrigendum of the tender document, the forms, schedules etc. may be
done any time by GIPCL during the period of publication of tender on the website. The
bidders are required to visit the website regularly till the last date of online bid submission.
2. GIPCL reserves the right to reject any or all the tenders or split the work among the
bidders without assigning any reason thereof.
3. The bidders are required to quote their rate strictly as per the terms and conditions
mentioned in the tender document. The conditional tender will not be entertained and
shall be liable for outright rejection.
4. The bidders are required to submit their bids online in the website:
https://nprocure.com.
In case bidder needs any assistance in accessing / submission of on-line bid / clarification or if
training required for participating in online tender, they can contact the following office:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Email: [email protected]
5. The technical bid, EMD, Tender fee, & other documents to be submitted in physical form
as mentioned above would be submitted by courier / hand delivery at the following
Address for submission of Technical bid & other documents in physical form:
General Manager (M&C)
Gujarat Industries Power Company Limited.
At & Post: Ranoli-391350,
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
web site:- www.gipcl.com
E-Mail: [email protected]
CIN – L99999GJ1985PLC007868
DETAILS FOR SUBMISSION OF TENDER:
YOU HAVE TO SUBMIT YOUR OFFER IN TWO PARTS i.e. PART- I
TECHNICAL BID AND PART- II PRICE BID.
PART- I TECHNICAL BID:
YOU SHALL HAVE TO SUBMIT PHYSICAL COPY OF FOLLOWING DOCUMENTS
DULY SIGNED & STAMPED AS A TOKEN OF ACCEPTANCE ALONGWITH PART- I
i.e. TECHNICAL BID OF TENDER.
(1) Annexure- A i.e. Documents as indicated for Pre-qualification criteria of bidder.
(2) Annexure- B i.e. Basic Information of bidder duly filled & signed by bidder.
(3) Annexure- C i.e. Experience information of bidder duly filled & signed by bidder along
with copy of required documents.
(4) Part-I Technical Bid duly signed & stamped by bidder as a token of acceptance.
(5) Annexure -D i.e. General Terms & Conditions duly signed & stamped by bidder as a
token of acceptance.
(6) Annexure – E i.e. Details of Facilities to be provided by GIPCL duly signed and
stamped by bidder as a token of acceptance.
(7) Annexure – F i.e. Details of Meals & Snacks Menu duly signed & stamped by bidder
as a token of acceptance.
(8) Annexure – G i.e. Details of service points and schedule timings for providing
canteen services duly signed & stamped by bidder as a token of acceptance.
(9) Annexure- H i.e. Schedule of Deviation, if any technical or commercial deviation is
taken against any terms & conditions of tender or else write with remarks “NO
(10) Annexure- I i.e. Bank Guarantee of EMD (If EMD is submitted thru bank guarantee)
(11) Annexure- J i.e. Format of Bank guarantee of security deposit duly signed &
stamped by bidder as a token of acceptance.
(12) Annexure- K i.e. Instruction to fill price bid duly singed & stamped by bidder as a
token of acceptance.
(13) Annexure- L, M, N, O, of tender documents on bidder’s firm’s letter head duly filled
signed & stamped.
(15) Tender Fee Rs.2,950/- (Two thousand Nine Hundred Fifty Only) by way of demand
draft in favour of “GUJARAT INDUSTRIES POWER CO. LTD" payable at Vadodara.
(16) EMD of Rs.1,00,000/- (Rupees One Lac Only) by way of demand draft in favour of
“GUJARAT INDUSTRIES POWER CO. LTD" payable at Vadodara. OR Bank
Guarantee for EMD.
(17) Annexure – Q Procedure for online payment of EMD/SD/tender fee
The tender document duly signed in all pages without price bid along with techno
commercial deviations, if any, shall accompany the bid.
The following Information shall be provided in the techno commercial bid:
1. Qualification and experience of site-in-charge.
2. Schedule of deviation (Annexure-H) Technical as well as commercial, if any.
3. Qualification & experience of Supervisors.
The following supporting documents shall also be submitted along with EMD &
Tender Fee in physical form:
1. The tender documents dully signed in all pages without price bid along with techno
commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three financial years, audited annual accounts / financial
statements i.e. profit and loss account and balance sheet duly certified by a
practicing CA will be required.
7. P.F. Number and Allotment Letter.
9. GSTIN number/certificate copy.
PART- II PRICE BID:
YOU SHALL HAVE TO SUBMIT YOUR RATES IN PRESCRIBED FORMAT THRU N-
PROCURE WEBSITE ONLY.
(1) Price Bid shall be submitted only in soft form through e- portal system.
Estimate given at Annexure-P (SOR) includes cost of all manpower, supervision,
equipment’s, vehicles, consumables, tools & tackles, transportation, Safety
statutory compliance, mobilization etc.
(2) Goods & Service tax @5% (GST) are inclusive in the Unit Rate / Total Value given
in the Price bid (Annexure-P SOR)
(3) Bidder shall have to quote the rates in the form of %age. i.e. "At Estimated Value
OR %age below the estimated value OR %age above the estimated value."
(4) The quantities shown in the price Bid (Annexure-P) are approximate for the
contract period and may vary as per job requirement.
(5) The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
(A) METHOD OF TENDERING/SIGNATURE ON BIDS:
(i) The Bid must contain the postal address like name, residence and place of
business of the person or persons submitting the Bid and must be signed and
sealed by the Bidder with his usual signature. The name of all persons signing
the documents shall also be typed or printed below the signature on each
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature
and designation of one of the authorised partners or other authorised
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or
other person or persons authorised to Bid on behalf of such
Corporation/Company. A certified copy of the board resolution/power of
attorney authorizing such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of
(v) Erasures or other changes in the Bid Documents shall be initialed by the
person signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
(B) MODIFICATION AND WITHDRAWAL OF BIDS:
(a) The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
(b) No Bid shall be modified subsequent to the deadline for submission of Bids.
(c) No Bid shall be withdrawn in the interval between the deadline for submission of
Bids and the expiration of the period of bid validity.
(C) POLICY FOR BIDS UNDER CONSIDERATION:
(a) Bid shall be deemed to be under consideration immediately after opening of the bid
and till official intimation of award/rejection made by the Company to the Bidders.
(b) While the Bids are under consideration, Bidders and / or their representative or other
interested parties are advised to refrain from contacting by any means, the
Company. the executive, if necessary, will obtain clarifications on the Bids by
requesting for such information from any or all the Bidders, in writing as may be
necessary. The Bidder will not be permitted to change the price or substance of the
Bid after the Bid has been opened.
(D) EFFECT AND VALIDITY OF THE BID:
(a) The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
(b) The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
(E) OPENING OF BIDS:
The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure has
been specified. Otherwise the tender will be opened by the authorized officers of
(F) PRELIMINARY EXAMINATION:
(1) The Company will examine the Bids for any computational errors, for sureties
furnished by bidder, for authentication of documents submitted and completeness
(2) Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is
obtained by multiplying the unit price and quantity, the unit price shall prevail
and the total price will be corrected & will be binding to the bidders.
(b) If there is a discrepancy between the Total Bid Amount and the sum of total
prices, the sum of total prices shall prevail and the Total Bid Amount will be
corrected & will be binding to the bidders.
(G) EVALUATION & COMPARISON OF BIDS:
(1) GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest
evaluated Bid in conformity with the specifications of the tender documents.
(2) The Technical Bids will be examined for minor matters regarding qualification of
bids. Subsequent to correspondence with the respective bidders, the decision of
Tender Committee will be final.
(3) All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or before
the given date requested by the Company. If the Technical clarifications sought
by the Company do not reach the Company on or before due date, the Bid will be
(4) The comparison of all the Bids shall be carried out with reference to the scope of
work as per the technical specification. Any deviation/omission shall be evaluated
at highest quoted price of the deviation/omission quoted by any of the Bidder. In
case a separate price (for omission) is not given by any other Bidder, a
reasonable price of the same shall be taken & the same shall be binding to the
(5) The commercial deviation, if any, shall be loaded to bring all the Bids at par. The
loading shall be carried out at an interest rate of 2% above PLR of SBI.
(6) A Bid to be substantially responsive shall be one which on evaluation confirms to
all the terms, conditions and specifications of the Bid documents without any
material deviation or reservation.
(7) For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of the
(b) Which limits in any substantial way and in a manner inconsistent with the Bid
documents, GIPCL’s right or the Bidder’s obligations, under the contract, or
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
(H) RIGHT OF REJECTION OF TENDERS:
(1) GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding
process and reject all Bids at any time prior to award of contract, without thereby
incurring any liability to the affected Bidder or Bidders or any obligation to inform
the affected Bidder or Bidders regarding the same.
(2) Any Tender without EMD and Tender fee will be treated as non-responsive and
shall be rejected at the outset & no further correspondence shall be entertained
regarding this.
(3) Any Tender / Bidder who have submitted their physical documents but not
submitted price bid online thru n-procure web site before due date of tender.
(4) Any Tender / Bidder who have submitted their price bid online thru n-procure web
site but not submitted physical documents with EMD & Tender Fee before due
date of tender.
(5) GIPCL reserves the right to debar any Bidder from participation in future Bids if
such Bidder has quoted an abnormally low rate in the Bid document / price Bid.
(I) AWARD OF CONTRACT:
(1) GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest quotation
in conformity with the requirements of the specifications and documents
contained herein, provided further that the bidder is determined and evaluated to
be qualified to perform the contract satisfactorily.
(2) The successful bidder shall be intimated of his selection through the Letter of
Intent or Letter of Award/ Work Order which shall be sent to him through e-mail,
courier, or registered mail.
(3) GIPCL reserves the right to cancel / short close the contract during the contract
period without assigning any reason.
(4) GIPCL reserves the right to split the contract quantity between vendors.
(J) CONTRACT PERIOD:
(1) The contract will be for a period of 02 (two) years from the date of actual
commencement of operation of the contract as stated in the tender or as stated in
work order/ LOI.
(2) GIPCL reserve the right to short close the contract at any time by giving one month
notice period without assigning any reason whatsoever.
(3) GIPCL shall have discretion to extend the contract for the further period of 1 (One)
year or part thereof on the same rates, terms and conditions.
(K) ASSIGNMENT AND SUB-LETTING:
The Contractor shall not directly or indirectly assign or sub-let total / any part of the
contract to any other party or agency without written permission of GIPCL.
(L) CLARIFICATION OF BIDDING DOCUMENTS:
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company at least before one week of last date of
submission of online Bid, in writing or by E-mail at the GIPCL's mailing address
[email protected] as indicated in the 'Invitation to Bids'. The GIPCL's
response (including an explanation of the query) will be sent in writing or by E-mail
to all prospective Bidders who have received the Bidding Documents.
ADDRESS FOR SUBMISSION OF TENDER:
GENERAL MANAGER (MAT & CONT)
GUJARAT INDUSTRIES POWER COMPANY LIMITED
P.O. RANOLI-391350, DIST: VADODARA
PHONE: (EPABX) (0265) 2234252., E- Mail: [email protected]
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-28
BI-ANNUAL RATE CONTRACT FOR RUNNING INDUSTRIAL CANTEEN AT
GUJARAT INDUSTRIES POWER COMPANY LIMITED, VADODARA FOR THE
PERIOD 2026-28.
QUALIFICATION CRITERIA OF BIDDER:
(A) INSTRUCTION TO BIDDERS FOR FURNISHING INFORMATION WITH TECHNICAL
1) Bidders are requested to submit the details about their organization, technical
experience, competency and suitable evidence of their financial standing as
per the enclosed format. Bid is liable to be rejected due to any false or
incomplete information furnished in the format / documents.
2) The Bidder should have sufficient number of technical and administrative
employees for proper execution of work as per the Tender documents. The
Bidder should submit organization chart and CV of the employees who will
occupy the key position in the contract work.
(B) ELIGIBLITY CRITERIA FOR PRE-QUALIFICATION:
Sr. Pre-Qualification Criteria Bidder’s Page number
No. Remark (Yes / of following
No) regarding enclosures
submission of in hard copy
document in with
hard copy Technical
1. The Bidder should produce certificate / document &
copy of work order issued by the organization clients
as evidence for work of providing catering
services in industrial canteen inside factory
premises of similar size / magnitude and nature in
Government / Semi Government department / Public
Sector unit / MNC / reputed industries and having
past , minimum recent Three (3) years of
experience out of last five (5) years. (work order copy
as per this eligibility criteria to be attached with
The Bidder should have executed work successfully of
providing Industrial catering service at least in two (2)
industrial canteen of similar magnitude and nature, in
Government / Semi Government department/ Public
sector unit /MNC/ Reputed industries.
2. The Bidder should produce satisfactory completion
Certificate of good Performance / satisfactory
performance from the clients / industries. copy of
previous Labour license and Workmen compensation
policy to be attached with the Technical Bid)
3. The Bidder should have minimum average annual
turnover of Rs.30 Lacs during past three financial
years i.e., 2022-23, 2023-24, 2024-25 and bidder will
have to submit the documents for the same. A
certificate from a chartered accountant giving year
wise turnover should be submitted along with certified
balance sheet with Profit and loss statement for the
year 2022-23, 2023-24, & 2024-25 (Three years
financial Statements to be attached with technical
The Net worth of the bidder should be positive as
evidence from audited accounts.
Note: In case, the annual turnover is less than the statutory
guideline which does not require audit, the bidder shall
submit the turnover certificate from Chartered Accountant.
4. The bidder should produce evidence of having
experience of successfully completed similar works
as define here under during last five years ending
last day of the month previous to the one in which
tender is invited, satisfactory progress of ongoing
work etc. secured from clients along with certified
copies of documentary evidence preferably photo
copies of work experience, the experience should be
either of the following in providing catering
service in industry with single work order value of
One similar completed/executed work each costing
not less than the amount equal to 36 lacs.
Two similar completed/executed works each costing
not less than the amount equal to 24 lacs.
Three similar completed/executed works each
costing not less than the amount equal to 18 lacs.
(copy of work order for above order value to be attached with
5. Bidder should possess valid (a) PF / ESIC Code
Number (b) Income Tax Permanent Account
Number (PAN), (c) GST Registration number.
(Copies of each documents to be attached with
the Technical Bid)
6. Details of Registered Partnership Deed in case of
partnership firm and Articles of Association and
Memorandum of Association in case of a Company.
(Copy of relevant documents to be attached with
the Technical Bid)
7. Confirmation letter that the Contractor will open bank
account with a Scheduled Bank for all the workmen
engaged by him during the Contract period and make
payment of wages in the bank account through
account payee cheque only. (Copy to be attached
with the Technical bid on letter head)
8. Registration as per Food Safety and Standard Act,
(Copy to be attached with the Technical Bid)
9. The bidder should submit a certificate signed by
Authorized Signatory on Company’s Letter head
stating the Company is not black listed, deregistered
as under by any Government / Semi Government /
Public Sector Undertaking / Private sector in last three
years. (Annexure- O)
10. If Bidder or its Partner(s) or Director(s) is /are/was in
any Litigation(s), Court Case(s) or Arbitration(s),
either completed or under progress during last five
(5) years or Black Listed / Deregistered / Stopped or
banned from dealing in the past by any Govt. of
Gujarat Undertakings / Depts. / Authorities and Govt.
of Gujarat supported companies / undertakings /
organizations, bid of that party will be liable to be
rejected. Bidder agrees and undertakes to accept
decision of GIPCL in this regard as final and binding
on the Bidder without any demur and that no further
correspondence shall be done in this regard at any
stage. (Annexure-N)
11. Bidder shall have to submit the “Declaration-cum-
Undertaking for Compliance of Safety Laws and
Regulations” as amended in Annexure-M attached.
a. If any Fatal Accident / Violation of any safety
law(s) / Rule(s) is / are found during the preceding
Three (3) years, bid of that party will be liable to be
rejected. Bidder agrees and undertakes to accept
decision of GIPCL in this regard as final and binding
on the Bidder without any demur and that no further
correspondence shall be done in this regard at any
b. If any of the details submitted in the prescribed
Annexure / Form to the Bid is/are found to be false,
incorrect at any time in future, then the Contract
awarded to that Bidder / Contractor shall be liable to
be terminated forthwith without any notice /
correspondence and Bidder agrees and undertakes
to accept decision of GIPCL in this regards as final
and binding on the Bidder without any demur and that
no further correspondence shall be done in this
regard at any stage. Further, Performance / Security
Deposit will also be liable to be forfeited. Any dues to
GIPCL from the Bidder / Contractor shall be
recovered from the pending bills or any other dues
payable to the Bidder / Contractor, if any or otherwise
through any other recourse available under the Laws.
1) Non-production of any of the compliance criteria as above, in the Technical
Bid, will render the Bid liable for rejection. After acceptance of the Technical
Bid only the Price Bid will be considered for opening online.
2) All the above documents as applicable are to be attached with an Index
showing the page number of the enclosures along with the Technical Bid.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-28
BASIC INFORMATION OF THE BIDDER
Sr. Description Particulars
Name and Address of the
Fax No- (if any)
Website- (if any)
i) Firm / Company Registration
ii) Income Tax PAN *
B iii) GST Registration No *
iv) PF Code No*
v) Registration No. as per Food
Safety and Standard Act,
Type of Organisation including
names of Partners / Directors
(with DIN) with basic
qualification and age, contact
numbers (land lines and Mobile
Nos.), copy of Income Tax PAN,
proof of residential address,
copy of Driving Licence. Details
of registered partnership deed
in case of partnership firm and
Articles of Association and
Memorandum of Association
with Registration Certificate in
case of Company*
(Sole proprietorship firm,
Partnership firm, Pvt. Ltd.
company, Cooperative Body
Bank Account Details
Name of the firm in Bank
Bank Name & Address
Type of account
(To attach copy of first page of
Bank A/c Pass Book
authenticated by the Branch
Manager along with a copy of
Cancelled cheque) *
*Copies of all relevant documents as mentioned above to be attached with
the Technical Bid without fail.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
EXPERIENCE INFORMATION OF BIDDER
List of Government / Semi Government department / Public sector unit / MNC / reputed
industries wherein contract work for providing catering services in industrial canteen of
the value as mentioned in the prequalification criteria undertaken by your firm / company
Sr. Name and address of the Date Total Work Order Value
No. company and name of From:------- Experience (Rs. In lakh)
contact person with mobile To:---------
Copies of all relevant documents as mentioned above to be attached with the Technical
Bid without fail.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
TECHNICAL BID: PART- I
TERMS & CONDITIONS:
It is necessary to specify name of the work “Bi-annual Rate Contract for Running
Industrial Canteen at Gujarat Industries Power Company Limited, Vadodara.”
On closed envelope / cover while submitting the bid physically. Full particulars of the
Tender can be downloaded from the website of n-Procure/ GIPCL. The bidder shall
have to submit physical copy of Technical Bid i.e. Part – I of the Tender to GIPCL
at office address: At & Post: Ranoli, Taluka & Dist.: Vadodara – 391 350 (Gujarat)
on or before due date of tender.
GIPCL reserves right to accept or reject any or all Bids without assigning any reasons
therefore. Any clarification regarding the Tender shall be obtained by the Bidder before
opening of the Tender or during the site visit.
It is perquisite and necessary for all interested bidders to visit the site/plant after
downloading the tender copy to understand the actual working conditions, compliance
related to labour, safety etc. before submitting their offer. Failing which , any
consequential liabilities arising will be to bidder’s account. The bidders shall examine
the site of works and its surroundings at his own responsibility. The bidders shall
collect information that may be necessary for preparing the bid and entering into a
contract. All costs and liabilities arising out of the site visit shall be at bidder’s account.
The bidder is deemed to have examined and understood the tender document,
obtained his own information in all matters whatsoever that might affect the carrying
out the works expressly mentioned or works which may have to be carried out to fulfill
his contractual obligation within the scheduled rates and to have satisfied himself to
the sufficiency for his offer.
The submission of tender by a contractor implies that he has visited the site and read
these instructions, conditions of the contract etc. and has himself aware of the scope,
nature of works & specifications of the works to be done, General & Special Terms
and Condition. GIPCL will not, therefore after acceptance of contractor’s rate, pay any
extra charges for any other reason in case the contractor is found later on to have
misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in the
contract according to scope of works, magnitude of the works, requirement of
materials, equipment, tools& tackles, labour, etc. Contractor has to complete the work
in accordance with the contract documents irrespective of any defects, omissions or
errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as access to site, communication, transport, working
condition including constraint of work place, confined area, quantum of dusting,
running equipment, importance of work, round the clock working conditions, safety
requirements, temperature of fresh drained hot bed material and associated risks,
right of way, high flood level in River, flow of water during monsoon/dry season in the
River/Nallah, the type and number of equipment and facilities required for the
satisfactory completion of work, the quantity of various items of the work, the
availability of local labour, availability and rates of material, local working conditions,
uncertainties of weather, obstructions and hindrances that may arise, etc which may
affect the work or cost thereof, before submission of his Bid. Ignorance of site
conditions shall not be accepted by the GIPCL as basis for any claim for
compensation. The submission of a Bid by the BIDDER will be construed as evidence
that such an examination was made. Any later claims / disputes in regard to rates
quoted shall not be entertained or considered by the GIPCL.
The rates quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations of
1. Physical copy of Tender will be accepted by RPAD / Speed post / courier / hand
delivery only. All the certificates/documents required to be submitted by the Bidder
along with the Technical Bid in respect of qualifying criteria shall be submitted in
physical form with the Technical Bid.
2. Bidder shall quote the reference of payment of EMD i.e. DD / Bank Guarantee No.
& Date. on the Bid envelope / cover itself. Tender fee shall be accepted by DD
only, without which the Tender is liable to be rejected. The Demand Draft for
Earnest Money Deposit (EMD) and Tender fee shall be drawn in favour of “Gujarat
Industries Power Company Limited, payable at Vadodara” In case EMD is paid in
the form of Bank Guarantee, the same shall be valid for a period of 180 days after
the due date set for opening of the bids.
EARNEST MONEY DEPOSIT (EMD) & TENDER FEES:
The Bidder shall submit non-refundable Tender fees of Rs. 2,950/- (Rupees Two
Thousand Nine Hundred Fifty Only) (Including of 18%GST) by DD and an EMD of
Rs. 1,00,000/- (Rupees One Lac only) on or before closure of bid time.
2.1 A crossed bank Demand Draft in favour of Gujarat Industries Power
Company Limited payable at Vadodara.
2.2 An unconditional and irrevocable Bank Guarantee drawn on any
Nationalized Bank including Public Sector bank-IDBI Ltd or AXIS Bank,
HDFC Bank, ICICI Bank.
2.3 In case EMD is paid in the form of BG, the same shall be valid for a period
of 180 days after the due date set for opening of the Bids. EMD of the
successful Bidder will be returned after the Bidder submits / deposits a
Security Deposit as per the Tender terms.
EMD of unsuccessful Bidders will be returned after the award of the
‘Contract’ to the successful Bidder. Any Bid not accompanied with Tender
Fee & EMD will be rejected at the outset. In case, the successful Bidder
withdraws the Bid within the validity period or fails to mobilize required
resources within stipulated time period or as per the Tender documents
then EMD of the Bidder shall be forfeited.
2.4 EMD of Successful bidder will be returned only after submission of
Contract Security –cum - Performance Guarantee. (Pl. refer Annexure-J)
2.5 No interest shall be payable on EMD / Security deposit.
2.6 The EMD will be forfeited if the BIDDER (i) withdraws his tender after
acceptance or (ii) withdraws his tender before the validity date of the
3. Bidder shall possess separate Provident Fund (PF) / ESIC Code No. in his name
obtained from the jurisdictional Competent Authority. In the event of non-
possession of separate PF/ ESIC Code Number, the Bid shall be liable to be
4. Downloading / Issue of Tender documents to any Bidder will not automatically
qualify the Bidder without satisfying the qualifying criteria of capability/experience
etc. to execute the job and GIPCL shall assess the capability of the Bidder at the
time of evaluation of Technical Bids.
5. The Tender documents are in two Bid / Part System i.e. Part-I Technical Bid and
Part-II Price bid.
A) The Part-I i.e. Technical bid, which is to be submitted in physical mode in
separate sealed envelope mentioning ‘TECHNICAL BID’ with details given in
special note for pre-qualification mentioning D.D/ Cheque. No. for E.M.D. &
Tender fee payment. Documents to be submitted in technical bid are as listed
at “DETAILS FOR SUBMISSION OF TENDER”
B) The Part-II i.e. Price Bid is to be submitted online thru n-procure website only.
This part of the Bid shall not be submitted in physical mode (Except un-priced
copy in technical bid) under any circumstance otherwise the Bid shall stand
6. EFFECT AND VALIDITY OF THE BID:
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
7. Subletting of Work under the Order issued to the Contractor is not permitted.
8. GIPCL has decided to go for n-Procure. As per e-tendering process, the Tender
activity will be carried out on-line using internet and associated technology.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
GENERAL TERMS AND CONDITIONS AND SCOPE OF WORK FOR
RUNNING OF INDUSTRIAL CANTEEN AT GIPCL, VADODARA
Pursuant to the notification inviting Tenders for running of Industrial Canteen at the
Plant of Gujarat Industries Power Company Limited, P.O. Ranoli, Dist: Vadodara,
on contract basis and consequent to your application for supply of Tender
documents, a set of such document is enclosed.
You are requested to submit 1 (One) copy Tender Documents duly filled in and
signed correctly and clearly in all respects. Please note that each page of the
Tender document must be signed counter stamped with Bidder’s seal/rubber
stamp and should be returned to General Manager (M&C), Gujarat Industries
Power Company Limited, P.O. Ranoli, Dist: Vadodara, Pin: 391350, latest by
P.M. on or before tender due date. Bids not submitted within the prescribed time
frame shall not be accepted and are liable to be rejected.
1) Gujarat Industries Power Company Limited (GIPCL) (here after referred to as “the
Owner”), is a premier Electrical Power generation Company in Gujarat with an
installed capacity of 1184 MW. Vadodara Plant with 310 MW is located At & Post
Ranoli, Dist.: Vadodara – 391 350, Gujarat.
The canteen facility is provided at fixed timings to employees at their work place
in the above locations and in canteen area. The Industrial canteen is located in
the Plant premises, where eatables are processed, prepared and served to the
Industrial Canteen has been divided in two wings
WING A - FOR COMPANY EMPLOYEES:
For company employees (wing A) payment will be made based on Canteen
Coupon Management System (CCMS). Employee will tender the CCMS Canteen
Coupons while availing the canteen facility and same shall be submitted by the
contractor on monthly basis to company to claim the bill based on the awarded
rate and numbers of coupons (CCMS) (Total amount = Nos. of CCMS Coupons
rate and numbers of coupons (CCMS) (Total amount = Nos. of CCMS Coupons
x Awarded rate)
WING-B – FOR CONTRACTOR’S WORKMEN DEPLOYED AT PLANT:
For contractor’s workmen (Wing-B) payment will be made based on Canteen
Coupon Management System (CCMS). Contract Employee will tender the CCMS
Canteen Coupons while availing the canteen facility and same shall be submitted
by the contractor on monthly basis to company to claim the bill based on the
awarded rate and numbers of coupons (CCMS) (Total amount = Nos. of CCMS
awarded rate and numbers of coupons (CCMS) (Total amount = Nos. of CCMS
Coupons x Awarded rate). However successful bidder has to follow the
system introduced by the company from time to time, without any
reservation whatsoever.
The Contractor will have to run one Pantry in Administration Building on all
working days during General Shift.
As per the present practice regarding serving food items through canteen please
refer Annexure E, F & G.
2) THE EXISTING DETAILS OF THE CCMS CARDS ARE AS UNDER:
The CCMS Canteen card is issued to all the Company employees & Contractors.
Based on actual consumption made by them, deduction is made directly from their
monthly salary / bills for the canteen items for which data is generated from the
CCMS. GIPCL reserves the right to change the existing coupon system / its rates.
3) PURPOSE OF THE TENDER & CONTRACT PERIOD:
The offers are invited for Bi-Annual Rate Contract for running of Industrial
Canteen at the Plant. “On the following terms and conditions mentioned
hereunder for a period of 2 (Two) years from the date of commencement
(mobilization period will be 15 days from the date of issue of LOI). GIPCL
reserve the right to short close the contract at any time by giving one month
notice period without assigning any reason whatsoever. GIPCL shall have
discretion to extend the contract for the further period of 1 (One) year / part
thereof on the same rates, terms and conditions.
4) CONDITION FOR REJECTION OF TENDER:
1. The bids in which any of the particulars and prescribed information is found to be
missing, incomplete, incorrect or false in respect of any of the prescribed
conditions are liable to be rejected.
2. Canvassing in connection with tenders is strictly prohibited and tenders submitted
by the Bidders who resort to canvassing shall be liable to be rejected.
3. Bids containing uncalled remarks or any additional conditions are liable to be
4. Any deviations with the tender conditions should be clearly brought out in
“Annexure- H” by the Bidder, failing which it will be ignored and / or the bid will
be liable to be rejected.
5) BIDDER NOT BOUND BY PERSONAL REPRESENTATION BY EMPLOYEES:
The Bidder shall not be entitled to increase in rates agreed or any other rights or
claims whatsoever by reason of any representation, explanation or statement or
alleged representation, promise, or guarantee given or alleged to have been given
to him by any person unless otherwise explicitly mentioned in the contract or
written order of GIPCL.
6) OPENING OF BID & RIGHTS OF GIPCL TO ACCEPT OR REJECT THE BID /
The GIPCL will open the pre-qualification / Technical Bid / price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure has
been specified. Otherwise the tender will be opened by the authorized officers of
GIPCL. GIPCL reserves the right to accept or reject any or all Bids / Tenders
without assigning any reason therefore.
7) NOTICE OF TERMINATION:
The Contract can be terminated by contractor by giving an advance written notice
of one month. On termination of contract, the premises, utensils, equipment,
furniture, fittings, etc. shall be handed over to GIPCL in good and working
condition. GIPCL will be free to get them replaced or repaired at the risk and cost
of the Contractor if he fails to do so. The premises, with fittings and fixture,
furniture, crockery, cutlery, appliances, equipments and utensils etc. provided to
the Contractor for running of the canteen shall be the property of GIPCL. The
Caterer shall have no right on any of these terms and shall place them back at
the disposal of GIPCL, forthwith after termination of the Contract.
8) GIPCL’s / COMPANY’s OBLIGATION:
GIPCL will provide following facilities to successful contractor:
1. Canteen premises, including all infrastructures like dining halls, Kitchen, pantry,
store room, utensils for preparation and service of food items and kitchen
equipments shall be provided by GIPCL. This contract / arrangement shall neither
create any lien of the contractor on any of the assets belonging to / owned by
GIPCL nor create a relation of lesser or Lessee between the GIPCL and the
Contractor, in any manner whatsoever.
2. Required equipment’s in the required numbers will be made available by GIPCL
free of charge, for the use by the Contractor in the canteen / dining hall / kitchens.
On termination or expiry of this Contract, all the premises, equipments, utensils
etc. provided to the Contractor by GIPCL, shall be handed over to,
3. GIPCL after physical verification, failing which the cost of
equipment/properties/utensils will be recovered from contractor at the original
purchase prices, from any dues payable to contractor under any account or
security deposit or by any other available means as may be deemed fit by GIPCL.
On such recovery, when the Security deposit would get reduced, the same has to
be replenished / made good by the Contractor forth with without any demure.
4. The Contractor shall maintain up dated records of all the articles and things
provided / supplied to him by GIPCL from time to time throughout the tenure of
the Contract. At the end of each quarter and also at the end of the Contract period,
he will prepare list of all the items in his possession and show them separately
classified as ‘in good working condition’, ‘damaged – partly or fully’, ‘repairable’,
‘irreparable’ and ‘missing’ and make them available for the purpose of joint
verification by GIPCL and the Contractor. Cost of missing or damaged items not
attributed to normal wear and tear shall be recovered from the Contractor as
mentioned above. The Contractor agrees and undertakes that the amounts
quantified by GIPCL to that effect shall be final and binding on him and make the
same good to GIPCL forthwith without any reservation whatsoever.
5. GIPCL will provide water for drinking and washing purposes free of cost and filled
LPG Gas Cylinders to be used as fuel for cooking purpose.
6. The Contractor shall keep the burners and gas connections in good working
conditions under Annual Rate Contract with the Service provider. Expenses for
such up-keep i.e. service and replacement of parts will be reimbursed by GIPCL
within thirty days after submission of original paid invoices / bills by the Contractor.
7. GIPCL will make Electricity available in the canteen free of cost for all electrical
gadgets / fixtures installed in the canteen. Any gadget or equipment brought by
the Contractor without written approval of GIPCL shall be operated at his own cost
by the Contractor.
8. GIPCL will take care of normal repair, maintenance and replacement of all
Electrical appliances, fans, lights, utensils, furniture, fixtures and building.
However, if there is any damage caused or loss of any of these items on account
of any act or omission attributable to the Contractor or his workmen or agent, the
Contractor will have to bear the expenses for necessary repairs/replacement as
the case may be or indemnify GIPCL for any expenses, loss, cost etc. incurred or
9. GIPCL will permit movement of material/manpower in the canteen and the Plant
premises in connection with the fulfillment of Contractor’s obligations to prepare
and serve the food items to the employees and the Contract Workmen on daily
basis. However, the same shall be subject to prescribed security and safety rules
and regulations of GIPCL as in force from time to time.
10. The Contractor shall issue Identity cards with photograph to all his workmen
employed by him to do work under this Contract.
11. GIPCL will provide replacement of equipment’s, utensils against normal wear and
tear and other than negligent usages by the Contractor to the extent considered
reasonable at its sole discretion. If it exceeds the reasonable limit as above, the
Contractor will be responsible for repair and replacement of the same at his own
9) CONTACTOR’S OBLIGATIONS:
The Plant services for tea and snacks as per service route and timings shall be
as mentioned in Annexure-G. However, route may be changed / revised by
introduction of new routes / starting new booth system.
The Contractor shall serve Tea, Coffee, Snacks and Beverages, etc. and services
shall be with adequate supervision in each shift as per the Annexure-D.
The Tea / Coffee will be serviced through insulated jars which will be supplied by
GIPCL. The dry and wet snacks, tea will be served in paper bags / cups and will
be supplied by GIPCL. The quantity of snacks per packet is as shown in the
attached Annexure – E & F.
Meals will consist of fixed & Unlimited vegetarian thali or items (consisting of
quantities and other specifications shown separately in Annexure P). The tentative
timings for lunch will be between 12.00 Noon to 2.00 pm and for dinner will be
between 8.00 pm to 9.00 pm. Prepared food items and snacks items are required
to be supplied at each service points on daily basis at least ten minutes before
normal service time to facilitate administrative convenience. (Please refer
Annexure-G). The Contractor or his workmen employed by him shall not bring or
cook or permit bringing or cooking of any non-vegetarian items and preparations
in the canteen, unless otherwise authorized in writing by GIPCL.
10) The tentative quantity of items to be served from canteen is as stated in the
Annexure- P. Your quoted rates shall be inclusive of GST. The Contractor shall
not sub-let the work or any part thereof to carry out his obligations arising out of
the Contract without specific written approval from GIPCL.
The Contractor shall provide rates including of all expenses and applicable Taxes
(GST), as stated in Annexure-P at GIPCL-Vadodara.
11) CONTRACT PERFORMANCE GUARANTEE/SECURITY DEPOSIT:
As a Contract Security, the successful Bidder, to whom the work is awarded, shall
be required to furnish a Performance Bank Guarantee (PBG) / Contract security
deposit for guarantee amount at ten percent (10%) of the Contract value from any
Nationalized Bank including Public Sector bank-IDBI Ltd or AXIS Bank, HDFC
Bank, ICICI Bank in the format attached herein under, in favour of the GIPCL and
it shall guarantee the faithful performance of the 'Contract' in accordance with the
terms and conditions specified in these documents and specifications. Contract
security deposit shall be submitted strictly within twenty-one days of awarding of
the LOI or work order, whichever is earlier. The guarantee shall be valid up to three
months period from the contract completion date. The Guarantee amount shall be
payable to the Owner in Bidder's home currency without any condition whatsoever.
GIPCL reserves the right to cancel LOI / Contract, in case contractors fails to
submit Performance Bank Guarantee within 21 days.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Contractor without any interest after completion of contract and on fulfilling
contractual obligations throughout the contract period. However, any delay in
submission of initial SD will result in equivalent late release of entire SD after
guarantee period. (Please refer Annexure-J)
12) SCOPE OF WORK FOR CONTRACTOR:
The Contractor shall be responsible for the safe custody and proper use of all
equipment’s and other properties of GIPCL, whether movable or immovable. Any
damage caused to the equipment or properties by the negligent operation act or
omission of the Contractor or his employees or his agents shall be made good by
the Contractor immediately to GIPCL for the entire loss/ damage, failing which the
cost of equipment’s/properties will be recovered from any dues payable to him by
GIPCL or will be recovered in any other legal manner.
The Contractor will ensure that the crockery equipment’s, appliances, utensils are
washed and cleaned in a hygienic way and the utensils shall also be finally washed
with hot water which shall be inspected by GIPCL, as and when required. The
Contractor shall maintain minimum stock of one-month consumption of all cleaning
materials including brooms, phenyl, detergent, dusters etc. required for cleaning
and washing the premises and the utensils etc. at his own cost.
For any additional requirement, on account of increase in number of employees or
due to opening of new service centers, additional utensils / equipment’s / cutlery
etc. will be supplied by GIPCL, after confirming the exact requirement.
Food wastage shall be disposed of by the Contractor in the manner specified by
GIPCL. The Contractor will be responsible to follow applicable rules regulation of
GIPCL, and other statutory authorities and the Government in respect of
compliances of environment and cleanliness. The Contractor will have to bear fine,
penalty etc. imposed by any competent authority for non-compliances of any
applicable statutory provisions, rules and or regulation, Circulars, Notifications
under the law for the time being in force.
The Contractor shall get Labour license under the Contract Labor (Regulation and
Abolition) Act, 1970 and rules made there under. It shall be binding to the
Contractor to get the same renewed from time to time and shall maintain all the
records at his own cost as per the applicable Acts and Rules made there under,
as amended. The Contractor shall be responsible to select, deploy, enroll his
employees, maintain books and records, deduct, add and deposit in the relevant
accounts the contributions as required under the Employees Provident Funds and
miscellaneous Provisions Act, 1952 and Employees’ State Insurance Act,1948 all
other applicable Labour laws and rules made there under. The Contractor shall
also furnish a copy of such statement as documentary proof to GIPCL as and when
The Contractor has to issue to their workmen Identity card with their recent photos
and shall also maintain statutory and other register and records as prescribed
under the applicable rules and regulation.
The Contractor shall give leave / holidays to his Workmen as per the provisions of
applicable Labour laws. The employees employed by the Contractor do not have
any right to raise a dispute / claim / demand before / against GIPCL and if any kind
of such litigation arising then Contractor shall be liable to bear all the cost expenses
losses and liability arising as a result of such litigation.
In case the contract period is over or the contract is terminated by either party, the
Contractor shall deploy / transfer the workmen recruited by him at any other place
and confirm in writing to GIPCL within forty-eight hours. In case the workmen
recruited by the Contractor are not provided work at any other place and are
discharged then all the eligible workmen shall be paid bonus, earned leave and
other benefits payable under the applicable provision of Labour laws. The
Contractor agrees, accepts and undertakes to honor all the liabilities arising out of
this Clause without any reimbursement from GIPCL.
There will be direct and complete supervision and control of the Contractor over
his workmen. If any accident or injury occurs to any of the workers of the Contractor
while performing the duty or otherwise then complete liability regarding the same
will be borne by the Contractor.
The workmen (01 Site In-charge / Supervisor, 01 Cook, 02 Assistant Cook,
08 Waiters / Helpers / Utility Boys) engaged by the contractor shall work
under direct supervision, direction and control of the Contractor. GIPCL or
its representative shall not have any supervision, direction or control on
workmen/employees of the contractor. It is contractor’s responsibility to engage
and deploy sufficient staff / number of Workmen for serving best quality freshly
prepared wholesome food, best services and maintain highest standard of
hygiene and cleanliness in and around canteen premise.
The Supervisors deployed preferably qualified graduate who can effectively
coordinate and communicate with the Officer in-charge of canteen at GIPCL.
Same way, for serving VIP guest of the Company, there preferably either
degree or diploma holder waiter (from Hotel Management Institute) along
with other sufficiently required staff like Cooks, Waiters, Helpers, Utility boys, etc.
To maintain the highest quality of services, hygiene, cleanliness and food taste,
Cook, Supervisor and VIP service waiter deployed at site shall be having at
least 2-3 years of experience in Industrial canteen (need to submit
experience & qualification certificate).
The canteen should run 24 X 7 on all days (including holidays) throughout the
year and sufficient staff should be available as required from time to time, in all
shifts considering the workload / emergency jobs. No person below eighteen (18)
years of age will be allowed / permitted to be employed or deployed by the
Contractor for any work under the Contract.
The Contractor shall issue appointment letter to his workmen before engagement
and submit copy of the same to GIPCL for record and reference.
The Contractor, willingly and at his own, agrees and undertakes, to fulfill any and
all the statutory obligations under the applicable provisions of all the applicable
laws including but not limited to Contract Labour Act, Laws relating to employment
of Workmen, nature of work to be performed under the Contract viz. preparation
and service of food items in Industrial undertaking, safety and security of the
workplace and Workmen etc. Further the Contractor willingly agrees and
undertakes to indemnify and keep indemnified GIPCL against any and all
statutory default(s) committed by the Contractor by way of noncompliance / part
compliance / wrong compliance or otherwise and also for any and all claim(s)
raised by any third party / authority, whether financial or otherwise, including but
not limited to the costs expenses, losses, damages etc. incurred and / or suffered
by GIPCL either during or after the terms of the Contract, resulting from or in
connection with any act, omission or commission on the part of the Contractor.
Contractor shall quote Canteen Management Charges in Annexure-P,
considering the adequate manpower to be deployed, for providing hassle free
catering services in the canteen. The Canteen Management Charges shall remain
fixed throughout the Contract period and shall be inclusive of GST.
The Contractor shall be solely responsible and shall fully comply all the provisions
of all applicable Code on wages such as Code on Wages, 2019 / Industrial
Relations Code, 2020 / Code on Social Security, 2020 / Occupational Safety,
Health and Working Conditions (OSH) Code, 2020 Orders and Notifications
issued / made there under from time to time.
The Contractor shall do due diligence to spell out all the laws, rules, regulation
applicable to catering business in Vadodara, Gujarat with details of each workmen
about his previous employment, qualifications, experience etc. verify the
antecedents and shall not allow entry into GIPCL premises to any of the workmen
whose activities appear to be prejudicial to the safety, security or any other
interest of GIPCL. The Contractor shall prescribe disciplinary rules to be observed
by his Workmen and ensure the rules are observed in letter and spirit by the
Workmen all the times. The Contractor shall take appropriate disciplinary actions
against the erring Workmen and award punishment after conducting domestic
enquiry, depending up on severity of the offence committed. It is made amply
clear to the Contractor that indiscipline of any sort or direct or indirect indulgence
in any activity of indiscipline in the GIPCL Premises by any of his Workmen at any
time whether during working hours or otherwise shall not be tolerated and that the
Contractor agrees and undertakes to duly abide by this condition without any
reservation whatsoever. The Contractor shall not allow any workmen who found
to be improperly dressed or behaving in improper manner in GIPCL premises.
The Contractor shall not allow any of his workmen to stay in the canteen and/or
transit camp, except during the working hours.
The Contractor shall subject all his workmen to the medical examination by
the registered and qualified Medical Officer at least once in six (6) months
during the tenure of the Contract. On such examination and based on the
observations of the Medical Officer in his Report, if the Contractor finds that the
workmen is found medically unfit to perform the job then the Contractor shall have
to relieve/substitute such Workmen forthwith. The Contractor shall be fully
responsible for payment of compensation, if any, to such Workmen. The medical
examination shall include tests such as blood, Stool, X-ray chest and all physical
checkup etc. and all such medical reports will be submitted to designate Doctor
for confirmation of fitness of Workmen.
The medical examination and test expenses of all Workmen carried out will be
borne by the Contractor. The Contractor shall make available the first aid box or
such other medical facilities, with adequate medicines as may be advised by the
Medical Officer from time to time, are made available at the work place for use by
the Workmen in case of need. Contractor shall arrange food for their workmen,
GIPCL will not provide any facility of subsidized food to the workmen of contractor.
14) UNIFORM AND STATUTORY LIABILITY:
Wearing the uniform prescribed and provided by the Contractor to the Workmen
is compulsory. The Contractor shall provide three pairs of stitched uniforms of
such cloth and pattern as mentioned below to bearers, cooks and other persons
working in the dining hall, kitchen, and pantry and service points. He shall ensure
that the uniforms are neat, clean and tidy and also arrange for washing and ironing
of the uniforms regularly. The Contractor shall supply raincoat for plant service
points in monsoon to his Workmen. No workmen wearing chappals / slippers etc.
shall be allowed inside GIPCL premises. The Contractor shall provide to all his
Workmen proper shoes to cover their feet fully. The expenses towards issuing
uniform, shoes have to be borne by the Contractor.
[1] Supervisors Black Pant, White Shirt & Safety Shoes (ISI Mark)
[2] Canteen Boys Dark Blue Pant & Light Blue Shirt, Apron, Cap &
Safety Shoes (ISI Mark)
Note: Color code of uniforms will be finalized by Contractor in consultation with
officer in charge of GIPCL.
Cooks should have adequate knowledge and practical cooking experience to
prepare different cuisines like South Indian, North Indian, Gujarati and Continental
The Contractor shall make payment of wages to his workmen on or before 7th of
the next month as per applicable provisions of the prevailing laws, as amended.
He will submit a certified soft / hard copy of the statement of monthly salary
payment details along with monthly Bills to GIPCL, within two working days after
the date of payment of wages to Workmen, for the purpose to ensure proper and
timely statutory compliance. He will also submit the evidence of payment made
under statutory provisions by 15th of the subsequent month, failing which the
amount approximately, equivalent to the payment may be retained by GIPCL from
the pending bills of the Contractor till such payments are effected by him and that
in case so required, make direct payment to the concerned authority to ensure
statutory compliance on time and forward the acknowledgement / receipt of the
same to the Contractor.
The Contractor shall quote the rate in the Price-bid based on prevailing rate
notified by the Government of Gujarat as per Minimum Wages Act, 1948 inclusive
of all statutory payment like PF, ESIC, Bonus and Leave applicable on the date
of submission of Tender. Please refer point no. 10 of Annexure-P.
15) MINIMUM WAGE RATE:
Contractor shall provide at least applicable minimum wage rate to their workmen
as declared by the Government of Gujarat from time to time including necessary
PF contribution, ESIC contribution, Bonus, Paid Leave, Public Holiday, etc.
(i) The Contractor shall quote the rate in Price-bid inclusive of all statutory payment
including but not limited to PF, ESIC, Bonus, Leave, etc.
(ii) Rates quoted should be firm and final throughout the contract period.
16) The workmen engaged by the Contractor shall be liable to abide by the safety /
security regulations prevailing from time to time in the area, including their
conveyance, subject to each time of security regulations. Photographs for identity
cards are to be supplied by the Contractor. Any Workmen of the Contractor, who
is not in possession of I-Card, shall be deemed to be an unauthorized person and
shall not be allowed entry in GIPCL premises.
17) The Contractor shall have to make his own arrangements of stay and transport of
his Workmen and materials etc. at his own risk and costs.
In addition to whatever is stated here above, GIPCL is under no obligation to
provide any other facility to the Contractor. The Contractor shall have to make
necessary provision including accommodation for his Workmen at his own cost,
risk and responsibility.
18) The Contractor will have to make his own arrangement for transportation for
procurement of materials, vegetables; LPG cylinders etc. In case of emergency,
transport facility may be extended by GIPCL on chargeable basis at its sole
discretion. If, at any time during the subsistence of the Contract GIPCL desires to
utilize the services of the Contractor for any special event such as seminars,
conferences, meetings, trainings, festive celebrations, official events etc. The
Contractor agrees and undertakes to provide the catering services at the rates to
be mutually agreed upon from time to time. In case the items are procured from
outside, the items for which rates have already been agreed to in the agreement
shall be reimbursed accordingly and other items which are not in the agreement
and served by the Contractor shall be reimbursed at actual on submission of
original bills, within thirty days.
As and when required, the Contractor will arrange to serve meals / snacks / tea /
assorted biscuits / cold drinks/ sweet / Amul ice-cream etc. to GIPCL guests and
visitors visiting for official purpose, on production of Guest Slip duly authorized by
the HODs. The Contractor shall raise separate bill for the same on monthly basis
and the same shall be settled within thirty days by GIPCL.
The Contractor shall produce Labour license under the Contract Labour (R&A)
Act and he shall also submit the separate Provident Fund Code Number, obtained
from the Regional Provident Fund Commissioner Authorities.
19) RAW MATERIALS:
It shall be the sole responsibility of the Contractor to procure good quality grocery
materials from D- Mart, Reliance Fresh Mall, Bansal Mall, Osia Hyper mart Mall
specifically for Loose item as per Annexure – F and other materials may be
purchased directly by Contractor from reputed suppliers as per brand specified in
Annexure – F. In case of non-availability of any raw materials at specified store,
the Contractor shall procure it from any reputed supplier, in consultation with
GIPCL officer in-charge. Please refer Annexure – F for preparation of food stuff.
The Contractor shall maintain stock of raw materials for fifteen (15) days
consumption and maintain register for these items and the same will be made
available for inspection to officer in charge of GIPCL every month.
The quality of food-stuff, snacks, tea, etc. to be supplied by the Contractor shall
be wholesome and of good standard. For this purpose, he will purchase good /
standard brand quality of material in sufficient quantity which is available in the
Fresh seasonal green vegetable shall be procured every day by the Contractor at
his own cost. The arrangement for supply of standard milk is made from Amul
/Vadodara Dairy through GIPCL. In case of non-availability of milk in the market
or due to non-supply of milk from Amul / Vadodara Dairy the Contractor shall
procure sufficient quantity of Milk / condensed milk powder from the market to
meet such exigency at his own cost.
The rates quoted shall remain firm for the first year of the contract. However,
GIPCL will consider increase / decrease of rates on completion of one year in the
event of increase / decrease in the prices of following commodities beyond band
The price of following commodities as stated below shall be taken as the bench
mark price for these commodities. The average percentage increase / decrease
shall be worked out on the basis of average quantity of below items utilized in the
industrial canteen during previous year i.e. 2024-25 (on the basis of bills of
purchased of items) and price increase / decrease of below commodities against
the base price of commodities stated below.
Name of Item Unit Base rate as on March-26.
(Hathikhana Mkt Yard,
Atta (Navjivan brand) Per Kg. 35/-
Sugar Per Kg. 46/-
Toor Dal (Punit / Rantio) Per Kg. 125/-
Rice – Gujarat 17 / Jeerasar Per Kg. 45/-
Besan (Navjivan brand) Per Kg. 79/-
Edible Oil (Ground Nut Oil/ Cotton 15 Liter Tin 2700/- , 2340/-
seed/ Corn oil)-
Gulab/Tirupati/Fortune make)
Tea Leaves – (Wagh Bakri brand) Per Kg. 490/-
Milk Gold (Vadodara Dairy) Per Ltr. 68/-
At the end of first year, if the average percentage increase / decrease is above
10%, then increase / decrease of percentage in excess of 10% shall be given /
reduced as the case may be on sale of food items against Canteen Coupons and
guest slip for Tea, Coffee, Milk and regular meals & Snacks. This adjustment in
the price of food items shall be done only once at the beginning of second year of
the contract and shall remain fixed and firm for entire second year of the contract.
The purchase of Grocery items from other than approved supplier shall not be
considered for this escalation.
The Contractor shall obtain necessary license from jurisdictional Food & Drugs
authority and keep it renewed and valid throughout the period of the Contract at
his cost. GIPCL premises being protected area, all the articles, which are to be
taken out or brought inside shall be subjected to security check by the security
Staff. Gate Pass System or any other System prescribed by GIPCL and in force,
from time to time, shall have to be duly observed and complied with by the
Contractor and all the Workmen employed / deployed by him. Before allowing
entry for any workmen of the Contractor in GIPCL premises for the first time,
copy of Aadhar Card, copy of Appointment order and police verification
(except local native) is must.
The Contractor shall not use the canteen premises for any other activities except the
purpose for which it has been provided for under the terms of the Contract. The
Contractor shall ensure that all his workmen are courteous and their behavior and
manners are good towards all the employees and guests of GIPCL, at all the times.
Except workmen of the Contractor working in the night shift, no employees of the
Contractor will be allowed to be in the canteen premises during night time or use it
for his rest / residential purpose or move out in any other area or the Plant premises.
In additions to above, the Contractor shall be responsible for the activities necessary
to organize the catering like good quality, approved quantity, timely supply of food
Suggestion book and compliant book for registering any suggestion and / or
compliant on the canteen services and quality of food items served shall be
maintained and kept at a readily accessible place round the clock to enable the
employees and guests to register their suggestion points / complaints. These
suggestions and complaints will be submitted by the Contractor to GIPCL on weekly
basis at the end of each week. The Contractor agrees and undertakes to implement
forthwith any suggestion or take immediate action and resolve the complaint in
consultation with GIPCL and decision of GIPCL in respect of the same shall be final
and binding on the Contractor without any reservation whatsoever.
The Contractor shall make provision for adequate supervision by qualified and
experienced supervisors round the clock in the Canteens and Pantry areas. In off
hours also, at least one supervisor will always be available. All edible items will be
distributed only after they are checked by the supervisor and found to be of good
quality. Timely and courteous service and good quality of eatables are the essence
of the Contract.
The Contractor shall ensure proper discipline so that peace, order and harmony are
maintained in the canteen. In case peace, order and / or harmony in the canteen
premises is disturbed due to lapse on the part of the Contractor or his workmen,
penalty of minimum Rs. 500/- (Rupees Five Hundred Only) shall be imposed by
GIPCL for each such event and the same shall he adjusted in the monthly running
bills or recovered otherwise in any other appropriate lawful manner from the
Continuing lapse / nuisance of this type on the part of the Contractor’s workmen
would render the Contract liable to termination without notice by GIPCL and without
any compensation whatsoever. In case of delay in providing services, a penalty of
minimum Rs. 1,000/- (Rupees One Thousand Only) shall be imposed on the
Contractor for a particular short coming for each event and recovered from his
monthly bill or recovered otherwise in any other appropriate lawful manner from the
Contractor. The timings for providing the services have been separately indicated /
intimated in the Tender document.
Preparations will be made as per the approved menu fixed by GIPCL from time to
time. Complaints about the quality and quantity of the food, snacks, tea, etc. served
by the Contractor shall be investigated by GIPCL representatives in the presence of
the Contractor or his lawful representative. If on investigation, it is found that the
preparation is of substandard quality or quantity, a penalty of Rs. 2,000/- (Rupees
Two Thousand Only) per instance shall be imposed on the Contractor and recovered
from the monthly bills or otherwise in any other appropriate lawful manner from the
GIPCL may impose penalty for any default in compliance of statuary obligation under
the Contract, GIPCL reserves the right to impose penalty of appropriate amount
depending on GIPCL’s assessments of severity and gravity of such default and the
Contractor agrees and understand to accept and abide by the decision of GIPCL
without any demure. Further, GIPCL reserves the right to terminate the Contact at its
sole discretion without asking any reason and get the work done from any other third
party at the risk and cost of such defaulting Contractor. GIPCL reserves the right to
recover the additional costs, damages, expenses, liabilities etc., if any, incurred or
suffered in making such alternative arrangement for the defaulting Contractor from any
amount(s) payable to the defaulting Contractor under any account or in any other lawful
The Contractor agrees and undertakes that in the event of termination of the Contract
by GIPCL due to any default attributable to the Contractor, in such an eventuality, the
Contractor voluntarily and willingly waives his right to raise any claim of whatsoever
nature including for compensation against GIPCL.
As per the prevailing practice followed in catering business, a penalty of Rs. 1,000/-
(Rupees One Thousand Only) per event shall be levied from the Contractor, on Lapse
in hygiene and cleanliness in canteen premises, Lapse in staff cleanliness and uniform.
For any other lapse as per contractual terms, including but not limited to quality of
Vegetables, deployment of non-qualified / non-experienced staff, non-availability of any
item, etc. suitable penalty shall be levied based on deficiency / financial implications of
Monetary penalty up to Rs. 100/- (Rupees One Hundred Only) per event shall be
imposed on the Contractor for non-compliances of safety rules of GIPCL by his
Workmen. Similar monetary penalty up to Rs. 1,000/- (Rupees One Thousand Only)
per event shall be imposed in respect of default or non-compliance of the applicable
provisions of the applicable laws. In case of continual / repeated / persistent default,
for three months, either consecutive or otherwise during any one financial year, on the
part of the Contractor for the lapses mentioned above, the Contract will be liable to
termination at the sole discretion of GIPCL and the Contractor voluntarily and willingly
waives his right to raise any claim of whatsoever nature including for compensation
The Contractor agrees and undertakes that in case of dispute regarding the services,
quality, hygiene conditions of canteen premises, or the quality of the foodstuff,
snacks, tea, etc. the decision of GIPCL will be final and binding on the Contractor
without any demure.
22) RECOVERY CLAUSE:
(i) In case of any damage of equipment/machinery due to negligence of contractor or
any other reasons attributed to contractor the decision of Executive-in-charge
regarding the amount of recovery shall be final and binding subject to a maximum
of 10% of annual contract value. Recovery will be affected from the monthly bills
and/or retention money/security deposit.
(ii) If the contractor fails to execute the work as per directions of Officer (I/c) within
the time frame given in work order and as per day to day instructions by Officer-
in-charge, GIPCL shall get the work done by third party at the risk & cost of the
contractor with 15% additional overhead charges of GIPCL.
23) DEDUCTIONS FROM CONTRACT PRICE:
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL. The contractor shall
pay all such claims within 15 days of claim, failing which the same shall be deducted
from the bills of contractor.
24) CLEANLINESS AND HYGIENE:
As per the prudent practices prevailing in the catering business, the Contractor
agrees and undertakes to maintain cleanliness inside the canteen premises and
surrounding area. The dining Hall, kitchen area and wash area shall be cleaned and
wash before and after each meal hours on daily basis.
Garbage and food waste of Industrial Canteen and other canteen / Dining halls shall
be collected outside the premises at a space notified by GIPCL. Garbage and waste
collected at this point shall be disposed off by the Contractor twice a day at the
nominated place. The contractor shall ensure that there is no food wastage in
Further, the contractor shall keep adequate stock of phenyl, acid, naphthalene balls,
soap, washing powder, broom, duster and other items required for cleaning of the
canteen tables, chairs, floor, wash basin and any other furniture / fixture in the
canteen premises and pantry area.
The rates quoted by the Contractor shall be valid during the period of the Contract.
All the rules and regulations regarding hygiene, health etc. by the State, Municipal or
Panchayat authorities and GIPCL shall be strictly adhered to by the Contractor.
25) CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, cut pieces or other matter of an
offensive nature shall not be deposited on the surface, but shall at once be carted
away by the CONTRACTOR to some pit or place provided by him away from the site
of work and approved by local authorities. As a part of the work included in this
contract, the CONTRACTOR shall completely remove and satisfactorily dispose of
all temporary works to the extent directed. He shall tear down and dispose of all
temporary works, shall remove or grade, to the extent directed, all plant and
equipment, shall satisfactorily dispose off all rubbish resulting from the operations
under this contract and shall do all work necessary to restore the territory embraced
within the site of his operations to at least as good order and conditions as at the
beginning of the work under this contract.
26) ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third-party
workmen due to any act omission / indiscretion on your part while undertaking the
work and contractor shall fully abide by the statutory requirements of the Employee’s
Compensation Act or ESI Act (whichever is applicable). GIPCL shall not be liable for
any compensation due to accident, death or injury to any of contractor’s workmen or
any third party due to negligence, act or omission on your part.
27) RIGHT TO VERIFY CANTEEN REPORTS AND RECORDS:
The Contractor shall allow GIPCL to periodically verify all the statutory and other
records maintained by the Contractor including but not limited to books of accounts,
stock records and registers of raw materials, wage sheets, returns, forms, articles
provided by GIPCL etc.
28) RIGHT TO ALTER TERMS & CONDITIONS OF THE AGREEMENT:
If the exigencies or circumstances so demand, GIPCL shall have right to review the
terms and conditions, for which prior indication of its intention shall be given to the
Contractor in writing. Canteen Contract is extendable for a further period up to one
year on the same terms and conditions at the sole discretion of GIPCL.
29) PAYMENT OF TAX:
The Contractor will be responsible for the payment of GST as applicable to the
industrial canteen and shall indemnify GIPCL from all and every responsibility of
payment of GST. Rates quoted by bidder in price bid shall be inclusive of GST.
Income tax (TDS) at the applicable rate will be deducted from each bill of the
Contractor as per provisions of the Income Tax Act and the certificate of the same
will be issued to the Contractor by the Company.
30) PAYMENT OF BILLS:
The Contractor shall submit monthly bill, the payment of which shall be affected
within twenty-one (21) days, from the date of receipt of bill or settlement of quires, if
any, raised by GIPCL whichever is later. Verification of bills will be done on the basis
of actual consumption of data received from the Canteen Coupon Management
System. Along with bill submission, contractor shall submit copy of wage register,
attendance sheet, details and challan of PF & ESIC compliance for previous month,
Grocery purchase bills, etc.
31) ARBITRATION:
All disputes, differences, claims and questions, whatsoever, which may arise either
during the continuance of this contract for the interpretation and / or the execution of
any clause of the Contract, or any other act, deed or commission / omission by any
Party or as to any other matter in any way relating to these clauses or right, duties,
obligations or liabilities or either Party under these Clauses shall be referred to a
sole Arbitrator to be selected by the Contractor out of panel of three Arbitrators to be
suggested by GIPCL. Arbitration shall be governed by the provisions of the
Arbitration Act, 1996 or any statutory modification thereto or re-enactment thereof in
force from time to time. The venue of such arbitration shall be at Vadodara, Gujarat
State only. The langue of arbitrator proceeding shall be in English only. The award
made by the Arbitrator shall be binding on the Parties.
32) FORCE MAJEURE:
Any delay in or failure in performance of obligation(s) by either party to the contract
shall not constitute default hereunder or give rise to claims in damages, if any, to the
extent of such defaults or failure in performance caused by occurrence due to act of
God or public enemies, exploitation or confiscation by the Government authorities,
compliance any order or direction of any Government Authorities or Court of Law,Act
or war, rebellion or sabotage or fires, flood, explosions or any other natural
If at any stage during the period of the Contract, any case involving moral turpitude
is instituted in any court against the Contractor or his Workmen, GIPCL reserves the
right to terminate the contract without any notice to the Contractor and in that event
the Contractor will not be entitled to any compensation in any form or of any nature
34) NO DUE, NO CLAIM CERTIFICATE:
The Contractor shall submit a “No Due, No Claim Certificate” to GIPCL soon after
close of the Contract and before settlement of the final bill.
35) GENERAL INSTRUCTIONS:
35.1 The Bidders who are interested in participating in the tender must read and
comply with the instructions and the Terms & Conditions contained in the
tender documents.
35.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any
alteration, erasures or overwriting shall be liable to make the tender invalid
unless the same is neatly carried out and attested over the full signature of
Bidder. The decision of the Company to interpret the information and rates filled
in by the Bidder shall be final and binding on the Bidder.
35.3 The Bidders are requested to make themselves fully conversant with the
General Conditions of Contract, Special Conditions of Contract, Technical
Specifications, Site conditions, Safety & Health Aspects and Norms to be
observed etc. before submitting their bids so that no ambiguity arises in these
respects subsequent to submission of the Bids.
35.4 Before quoting the rates, the Bidder should go through the specifications, scope
of work etc. and get himself fully conversant with them. The Bid should
include cost of mobilization and cost to adhere to all Safety Norms as
described in the tender. No relaxation or request for revision of quoted /
accepted rates shall be entertained subsequent to the opening of Bid on
account of mobilization or Safety costs.
35.5 Bidder has to quote their service charge as % above, equal or below on given
SOR cost of both the packages, including applicable GST rate.
35.6 Bidder has to submit all the information as per required Bid document. Failure
to furnish all the information as per required Bid documents or submission of a
Bid containing deviations from the contractual terms and conditions,
specifications and requirements, shall be rejected.
35.7 The Bids shall be submitted within the time frames set out in the Notice Inviting
Tender (‘NIT’) and Bids submitted thereafter shall not be accepted and
35.8 The tender documents shall not be transferable.
35.9 The Bidders are expected to examine all instructions, forms, terms &
specifications in the Bid documents and to get fully acquainted themselves with
all the conditions and matters which may affect the subject matter of the
work/tender or the cost thereof. If any Bidder finds any discrepancies or
omissions in the specifications and documents or any doubt in true meaning
or interpretation of any part, he shall seek necessary clarifications in writing or
during site visit if required.
35.10 Conditional offers shall not be considered and liable to be rejected.
35.11 The Company reserves the right to extend the deadlines for submission of the
Bids by giving amendments.
35.12 During evaluation of Bids the Company may, at its discretion ask the Bidder
(s) for clarification of their Bid. The request for clarification and the response
shall be in writing and no change in prices or substance of the Bid shall be
sought, offered or permitted.
35.13 The Company reserves the right to amend/ modify the Bidding documents at
any time prior to the deadline for submission of Bids, either at its own
discretion or in response to the clarification requested by a prospective Bidder.
In such case, the Company may in its discretion extend the deadline for
submission of Bids in order to facilitate the prospective Bidders for
Incorporating the effect of the amendment in their Bids.
35.14 The Bidders shall bear all costs and expenses associated with the preparation
and submission of their respective Bids, to visit, to attend meetings or
conferences, if any, including any pre-award discussion with the successful
Bidder, technical and other presentations etc. and the Company shall not be
liable for any expense thereof.
35.15 If the successful Bidder is a joint venture, formed of two or more companies,
the Bidder along with the partners shall accept joint and several
responsibilities and liabilities for all obligations under the Contract.
35.16 Timely and satisfactory completion of the work and strict adherence to the
allotted time frames for jobs shall be the essence of the contract.
35.17 The Company reserves the right to qualify/disqualify any bidder / applicant
without assigning any reason.
35.18 The Bidder shall be disqualified if any untrue statement or misrepresentation
is made in the Bid forms, attachments and other supporting documents
submitted by the Bidder.
35.19 GIPCL reserves the right to opt for e-Reverse Auction of the subject work at
the sole discretion of GIPCL.
35.20 To participate in e-Reverse Auction, bidders have to register on n Procure’s
e-Auction Portal: https://e-auction.nprocure.com.
35.21 After e-Reverse Auction process, L1 bidder shall be decided on lowest offered
rate amongst other bidders during specified e-Reverse Auction Process.
36) STATUTORY REQUIREMENTS:
a. COMPLIANCE OF LABOUR LAWS:
1. The contractor shall at his own cost comply with the provision of labor laws, rules, orders
and notifications whether central or state or local as applicable to him or to this contract
from time to time. These Acts/Rules include without limitation of the followings.
2. Contractor shall be solely responsible and shall fully comply with all the provisions of all
the Code on Wages, 2019 / Industrial Relations Code, 2020 / Code on Social
Security, 2020 / Occupational Safety, Health and Working Conditions (OSH)
Code, 2020 (labor laws applicable such as the Minimum Wages Act, 1948, Contract
Labor (Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus Act
1965, Employees Provident Fund and Miscellaneous Provision Act 1952, Industrial
Dispute Act 1947, Workmen Compensation Act 1923, Payment of Gratuity
Interstate Migrant Workmen Act 1979, Equal Remuneration Act with Rules, Order and
Notifications issued/made there under from time to time.)
3. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future applicable to
the contractor from time to time for performing the contract job.
3.1 The Contractor shall provide and be responsible for payment of Wages,
Salaries, Bonus, Social charges, Insurance, Medical and other statutory
privileges and facilities to his personnel as per law/rules/regulations and orders
of the Central Government, State Government, Local Authorities or other
authorities as are in force from time to time. All employees of the Contractor
shall be employee of the Contractor.
3.2 The contractor shall have a valid license obtained from Licensing Authority
under the Contract Labor (Regulation & Abolition) Act-1970 at the time of
execution of the contract covering all his employees working at GIPCL-
Vadodara site and furnish the same failing which GIPCL may terminate the
contract at its sole discretion.
3.3. The Contractor shall at the time of execution of the contract have an EPF Code
Number obtained from the Authorities concerned under the Employees Provident
& Miscellaneous Provisions Act, 1972 and remit contributions in respect of the
employees employed by him at GIPCL-Vadodara Site to the P.F office concerned
every month failing which GIPCL will recover from the outstanding payment to the
contractor from GIPCL.PF code of Gujarat region should be taken.
3.4. The Contractor shall maintain all records/registers required to be maintained by
him under various labor laws mentioned above and produce the same before the
Statutory Authorities whenever required.
3.5 The Contractor shall also submit periodical reports / returns to the various
statutory authorities such as the Contract Labour (Regulation & Abolition) Act-
1970, Employees Provident Fund Act etc. Under intimation to HR & Admin. Dept.
3.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
3.7 The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed hours
under law as per applicable rates.
3.8 The contractor shall take Workmen Compensation Insurance Policy for all his
employees working at GIPCL-Vadodara. The contractor shall indemnify the
company against any liability due to any work injury or accident to any of its
3.9 The Contractor shall in the event any of his workmen / employee sustains any
injury or disablement due to an accident arising out of and in the course of his
employment, provide necessary medical treatment and pay compensation as
applicable, required under the Workmen’s Compensation Act,
3.10 If any of the persons engaged by the Contractor misbehave with any of the
officials or the Company or commit any misconduct with regard to the property of
the Company or suffer from any serious communicable disease, the Contractor
shall replace them immediately.
3.11 The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
3.12 GIPCL will have right to deduct and disburse the claims of the individual / parties
being a principal employer on any account whatsoever in relation to their
employment with the contractor. The Security deposit will be released to the
contractor at the end of the contractual tenure subject to an undertaking by the
contractor that in the event any of his workmen or the heirs of workmen puts up a
claim for recovery of money due to him from the contractor before the appropriate
authority under the I.D.Act 1947 or under any other labor laws or for compensation
under the Workmen’s Compensation Act, 1923 and the appropriate authority has
given a direction for making payment the contractor will meet the same or
indemnify GIPCL if in the event GIPCL pays it as Principal Employer.
3.13 The contractor shall make payment of wages to his employees on fixed date
within the period specified under the applicable Law, in presence of representative
of the company. He will submit a true copy of wage sheet, attendance register
and P.F. remitted challans on monthly basis to HR&A dept. for verification and
3.14 The Contractor shall provide Safety items / kits to his employees such as safety
shoes, goggles, ear plugs, hand gloves, safety belts etc., if any, required under
3.15 The contractor shall conduct pre-induction and periodic medical checkup of his
workmen as per applicable laws.
4. The contractor shall be solely responsible for any accident caused to his workers and
should adhere to all rules / regulations as per labor laws of Government and other
statutory laws as applicable.
5. The contractor should register himself under the Contract Labor Act, Employee
Compensation Act and PF Act (Code no. to be mentioned) and submit the copy of
registration certificate and should possess the same from the date of commencement of
work, failing which the contract is liable to be cancelled. The E.C. Policy copy should be
submitted to the GIPCL before commencement of the work and Labor License should be
obtained within one week from the date of issue of form-V. Contractor should apply for
Form-V immediately after receipt of LOI. A copy of Labour License shall be submitted to
GIPCL, HR & A Department.
6. Contractor shall have to insure his workmen /supervisors etc. under Group Insurance
7. The Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund Act,
All Labor Laws Act in respect of employees engaged by him for the work and Shall have
to maintain necessary records. In case any amount becomes due to be payable by him
to his employees or to the Government under the above rules, regulation, Acts, GIPCL
reserves the right to recover the same from the running bill of the contract.
8. Documentary evidence of deposit of PF paid shall have to be produced by the contractor
along with the next bill.
9. Records as per the provisions of various statutory Acts will have to be maintained by the
contractor and submitted as and when required.
10. All employees of contractor should maintain due discipline and respect local sentiments.
GIPCL reserves the right to direct the contractor to remove any such person who does
not comply with it.
The list is indicative in nature and not an exhaustive one. Any amendment/ alteration/
Notifications or addition to the existing Law or a new statute shall automatically and
immediately become applicable.
b. LEGAL ASPECTS:
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the provisions of
Contract Labour Act, 1970 and maintain necessary records and registers under the said
3. The contractor shall submit a copy of each requisite license and registration / coverage
certificate with respect to labour Act 1970, the employee provident fund & miscellaneous
provision Act (&A) and workmen compensation act within one week from the date of
award of the contract. It will be the responsibility of the contractor to maintain necessary
record & register required as per various acts.
4. Record of compliance under various Code on Wages, 2019 / Industrial Relations
Code, 2020 / Code on Social Security, 2020 / Occupational Safety, Health
and Working Conditions (OSH) Code, 2020 will be verified by GIPCL HR & Admin
dept. from time to time. The contractors therefore has to maintain up to date records like
(1) Attendance register (2) Wage Register (3) Bonus register (4) Leave wage register (5)
PF Challan (6) Form 12 (A) revised (PF Act) (7) Form 3A / 6A (PF Act) (8) Returns under
Contract Labour act etc.
5. Contractor’s employees, agent or sub-agent shall not smoke or light anything within the
premises of the GIPCL and carry match box / lighter or any other explosive and /or
inflammable material inside the plant.
6. Contractor shall abide by all the statutory rules and regulations like P.F, Labour Laws etc.
7. Contractor shall issue an appointment order to each casual labourer stating therein the
nature of job to be performed by him and fix time for which the concerned labourers are
likely to be deployed. Contractor shall also issue a temporary identity card specifying the
period for which the labourer has been deployed.
8. Contractor is fully liable for the persons engaged by him for above work; however, GIPCL
reserves the right to deduct any amount legally justified towards any liability not fulfilled.
9. Contractor shall indemnify GIPCL from any liabilities arising out of the employment of the
10. If the contractor fails to complete the allocated job within specified time frame, GIPCL
shall get the work done by third party at the risk and cost of contractor.
37) GENERAL SAFETY CLAUSES:
1. The Contractor shall observe and comply, with regard to his workmen working at the
GIPCL-Vadodara site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the GIPCL-Vadodara Plant and the
Contractor shall brief them regarding the same and use of the Personal Protective
Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that his
workmen wears the protective equipments at all times during the work operation. Brand
name for safety shoe & safety helmet shall be suggested by safety representative of
GIPCL-Vadodara site.
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots, full
body safety uniform and belts, safety net etc. shall be issued and used as per the job
requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor will
5. procure safety shoes & safety helmet from a reputed company with at least 12 months’
guarantee and shall produce the guarantee certificate and IS standard certificate to the
safety department. Contractor should purchase safety shoes of reputed brands. Safety
shoes will be issued every year. IS certificate and guarantee certificate must be obtained
from the vendor and submitted to the Safety department. Safety shoes should be heat,
water, oil and chemical resistant, having an anti-slippery sole of 15298- 2002 make.
6. It is the duty of contractor to ensure that his workmen are wearing required PPEs as per
work requirement. Contractor should ensure that their workers are wearing Safety helmet,
safety shoes, dust mask, goggles, ear plug etc. at all times when they are at work
throughout the contract period. The contractor has to maintain the PPE issue register
with signature of workmen.
7. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
8. The contractor shall be responsible for providing first aid or emergency medical help and
treatment to his workmen in the event of any accident or injury.
9. If it is observed that contractor is not issuing required PPEs timely and that of required
quality, GIPCL will issue the required PPEs to contract workers and back charge the
same with 25% overhead charges of GIPCL.
10. When working at height, working on ceiling or roof covered with fragile materials, full body
harness safety belt, ladders and crawling boards shall be used to prevent accident.
Further, during working on height, contractor should arrange proper scaffolding of still
pipes, safety net, full body safety belt, fall arrestor system etc. Advice and instructions of
engineer in charge/ safety in charge shall be strictly complied with in this regard. All
necessary safety precautions shall be taken by the contractor to prevent accident and
personnel injuries while working on height.
38) PAYMENT OF WAGES:
38.1 The contractor shall not pay wages and other legal dues less than the prevailing
minimum wages as per minimum wages Act 1948 & amendment thereof time to time
and other applicable statutory allowances / benefits.
38.2 The contractor shall be responsible to make payment of wages & allowances,
including bonus, P.F., Workman Compensation, Leave & such other obligation as
may be required as per the laws of land, the wages should be paid on or before 7th
of every month in presence of GIPCL’s representative.
38.3 The contractor shall comply with all applicable statutory provisions under various laws
such as Minimum wages Act, the payment of wages Act, P.F. and Miscellaneous
provisions Act, The Bonus Act, Gratuity Act, ESI Act etc. The contractor’s hall also
obtain necessary license, registrations as required under the laws of land.
38.4 GIPCL shall be entitled to recover full amount from contractor on account of non-
compliance of any statutory provision or breach of any terms of contract/tender.
39) SETTLEMENT OF DISPUTES:
a. Any disputes or difference of opinion between parties arising out of the contract to the
extent possible shall be settled amicably between the parties. If amicable settlement
cannot be reached all the disputed issues shall be resolved through arbitration before
a Sole Arbitrator appointed by Managing Director, GIPCL according to the provisions
of The Arbitration & Conciliation Act, 1996. The place of arbitration shall be at
Vadodara city only state of Gujarat as may be mutually agreed by the parties in
consultation with the tribunal.
b. In appointment of the Sole Arbitrator, if the dispute claim is up to a sum of Rs. 25/-
Lac, a person having a position equivalent to a Retired District Judge shall be
appointed; for the claim higher than Rs. 25/- Lac and up to Rs. 100/- Lac, the same
shall be referred to a Retired High Court Judge and for a claim exceeding Rs. 100/-
Lac, the same shall be referred to a Retired Supreme Court Judge.
c. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless the
decision of the Arbitration proceedings is obtained.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may
sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor. In case, in any
litigation pertaining to labour employed through contractor if any direction or order is
issued by court at any point of time the contractor shall comply with and implement
such direction or order whether passed at the time of award of contract or during the
pendency of contract. Further, the Contractor shall indemnify the GIPCL against all
consequences arising and affecting GIPCL owing to the compliance of the orders by
the Contractor.
41) INTERPRETATION OF CLAUSE:
In case of disputes as regards interpretation of any of the clauses or specification,
the decision of General Manager (HR & A) - GIPCL will be final and binding on the
42) GOVERNING LAW AND JURISDICTION:
This tender document and contract shall be governed by the laws of India and the
Courts at Vadodara shall have jurisdiction regarding the same.
43) Where any portion of the General Condition of Contract is repugnant to or at variance
with any provisions of the Special Condition of Contract, then unless a different
intention appears, the provision of the Special Conditions of Contract shall prevail to
the extent of such repugnancy of variance
44) JURISDICTION:
Any and all actions and proceedings arising out of in relation to the Contract
including any arbitration in terms hereof shall lie in the court of competent jurisdiction
in this behalf at Vadodara city, Gujarat only.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
DETAILS OF FACILITIES TO BE PROVIDED BY GIPCL
A. FACILITIES TO BE PROVIDED BY THE GIPCL COMPANY:
1. Utensils, Crockery, Cutlery, Furniture, Fixtures, Geyser and other Canteen
equipment’s and premises for running the Canteen and Pantry.
2. Fuel (LPG Cylinder) (PNG), However, Contractor shall be required to
maintain stock of stand by fuel like Diesel, Kerosene etc., to meet with
emergency requirements.
3. Free supply of Water & Electricity.
4. Electrical gadgets like Computer, Fans, Lights, Water Coolers, deep
Freezers, Refrigerator, Pulverizer, Atta Maker, Baine-Marie etc.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
DAILY LUNCH MENU AND SNACK ITEMS SECHDULE
1. Shall includes 8 Puri (150 Gms.) or 06 Roti (150 Gms) or 04 Paratha (150
Gms) Rice (100Gms) with Dal or Kadhi (200 Ml. each), Sabji Seasonal (100
Gms), Mixed Green Salad 20 gms, Kathol (100 Gms) / Soup (200 Ml),
Curd (50 Gms) / Butter Milk (150 ml)
2. Banana Medium Size (@ 100 gms) / Cut Seasonal Fruit (100 gms).
Read note 03, 04 & 05 as mentioned in the Annexure along with it.
B) Vegetables: shall include Potato-Bringal, Suki Bhaji, Couli Flower Potato, Cabbage-
Potato, Palak Potato, Mixed Vegetables, Dry Potato fry, Stuffed Brinjal Potato,
Brinjal Bharta, Fried Tindora-Potato, Sev Tomato, Capsicum Tomato Potato, Bhindi
Potato fried, Undhia, Suran, Tomato-Vatana-Potato, Palakh Cofta, Dudhie Cofta,
Masalabhindi, Green Peas, etc.
C) Wet Snacks (Total Quantity 100 Gms): Shall include Batata Pauva, Khaman, Sev
Khamni, (50 gms. Khamni & 50 gms. Sev), Dhokla, Uttapa, Upma, Idli (100 gms.
each) with chatni, Vadapav (1 No Vada- & Pav), Sabudana vada (100 gms.), Batata
& Chilley's Bhajiya, Bread Pakoda, Bataka Vada, Samosa, Medu Vada, Cutlet, Veg.
sandwich etc. along with Cut mixed fruit (100 Gms - on daily basis only in the
D) Dry Snacks (Quantity 75 gms) such as Sev, Chevda, Dalmuth-Sev, Sev with makai
chevda, Mixture, Sakkara Pada, Chana Dal, Sing Bhajiya, Sev Mamra, Bhavnagri
Gathiya, Papdi, Potato Chips Shing Dana (Bake/Fry) etc. These snacks may
change/with additions of new varieties from time to time.
Note: In place of Rice with Dal, Khichadi / Masala Khichadi / Veg. Pulao with Kadhi /
Veg. Biryani with raita may be served for two / three days in a week.
The above food items i.e. Meals / Snacks / Tea shall be prepared inside the Canteen
premises and served by the Contractor in respective department of the plant areas to
the employees. Change of any snack or meal item is subject to prior approval of GIPCL
in writing and GIPCL reserves the rights to change the menu with twenty-four hours prior
notice in writing to the Contractor.
1. Please refer Annexure-F for preparing and serving the above canteen items.
2. Items including Vegetable & Kathol will be served as decided by the company OR
Canteen Committee.
3. The serving quantity at “A” (Meals) above, shall be fixed per plate for Contract
Workmen side canteen and tiffin’s (mostly for the shift employees working
inside plant premises).
4. The serving quantity for employees and guest taking lunch in Employee side
dining hall of canteen shall be unlimited for items mentioned at “A-1” above
and fixed for items mentioned at “A-2” above (A-Meals: 1 and 2 respectively).
Service shall be in the form of buffet set up.
5. Undhiya shall be served once in a week during the month of December and Pav bhaji
shall be served once in a week during the month of January / February at Canteen
serving Employees and Contractors.
6. All the food rates quoted by bidder are inclusive of GST and excluding Labour cost.
7. Along with daily evening wet snack as per menu decided by canteen committee
/ Company, contractor shall keep Cut Mixed Fruit as an option on daily basis.
E) ITEMS TO BE SERVED AT MARKET RATE:
1 Biscuits / Cookies One 100/75/50 Gms Actual Market Rate
(Make of Parle / packet
Britania / Any Good
2 Beverages - Cold Bottle / 200/300 ML Actual Market Rate
drinks, Juice, Amul
F) BRANDED ITEMS TO BE PURCHASED FROM reputed supplier and specifically
for Loose items to be purchased from reputed mall (i.e. D- Mart, Reliance
Fresh Mall, Bansal Mall, Osia Hyper mart Mall) (except item no 14, 15 & 16):
1. Rice should be Jirasar or Masoori or Gujarat-17. For Pulav & VIP Canteen,
Basmati of Dawat or Kohinoor brand shall be used.
2. The cooking oil should be ground nut oil / Sunflower Oil/ Corn oil of Gulab or
Tirupati or Fortune Brand or any reputed brand.
3. Tuvar Dal should be Angoor or Laxmi Brand, Vasad, Madhi any other brand as
approved by company.
4. Biscuits should be Britannia or Parle Brand or Gooday or any reputed brand only.
5. Bread should be fresh and of Super, Gandhi Bakery or any other as may be
approved by the company.
6. Ghee should be of Amul, Sagar or Vadodara Dairy Brand.
7. Papad should be Lijjat Brand or any other brand as approved by in writing by the
Head of (HR&A).
8. All masala used in cooking should be of agmark quality (either Ranchhodrai,
Everest masala or any standard masala brand approved by the company.
9. All other pulses grains should be of highest quality which shall be approved by the
10. Tea leaves should be of Wagh-Bakri Brand,Tea preparation must be of Good
quality. Green tea should be Lipton tea bag or any standard brand approved by
11. Coffee should be of Nescafé Brand.
12. The wheat atta should be of Navjeevan/ Aashirvaad Select Sharbati Atta/Tirupati
Chakki Fresh Atta/Madhuram/ wheat Atta/ Patanjali Whole Wheat Atta brand, if
not available then other brand may be used with prior approval of Head (HR &A).
The besan should be of Navjeevan/ Gaay chhap brand, if not available then other
brand may be used with prior approval of Head (HR &A).
13. Butter & Cheese shall be Amul Dairy or Britania make.
14. Cold drinks & Fruit drinks manufactured by Parle, Pepsi, Coco-cola, Dabur, Godrej,
and Tropicana shall be served.
15. Ice Cream should be Amul or Havmor make.
16. The milk will be of Standard Quality (Standardized Milk) of Amul/Vadodara dairy
and requirement will depend upon employee’s strength and same milk will be used
for preparing curd.
Items at serial number 14, 15 & 16 can be purchased from reputed supplier.
Only In case of non-availability of any raw material from supplier approved by
GIPCL (Likely to purchase loose raw material from D- Mart, Reliance Fresh
Mall, Bansal Mall, Osia Hyper mart Mall), the contractor shall procure it from
other reputed Supplier with due approval of GIPCL officials.
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
DETAILS OF SERVICE POINTS AND SCHEDULE TIMINGS FOR
PROVIDING CANTEEN SERVICES FOR GENERAL & SHIFT
[A] MEALS WILL BE SERVED AS PER THE FOLLOWING SCHEDULE:
[1] Between 11.30 AM to 12.00 AM for “A” Shift personnel (6.00 AM to
PM) Tiffin’s will be collected by the dept. peons as per requirement.
[2] Between 12.30 PM to 13.00 PM for “G” for plant staff.
[3] Between 13.00 PM to 14.00 PM for “G” for administrative staff.
[4] Between 12.30 PM to 1.30 PM for contract Labour and outsiders.
[5] Between 08:00 PM to 9.00 PM for “B " Shift personnel dinner in the plant.
[B] [1] No food will be provided to anyone except for outside guests on company
account in the office. In case of the outside guest, food will be served
against the note/slip from concerned departmental head.
[2] Senior officers who want food in their own office for any reason shall
send their own peon and coupons for the items required.
[3] No glasses or spoons will be provided outside canteen to anyone.
[4] Between 9.00 AM to 9.30 AM tea and snacks for Plant side.
[5] Between 3.00 PM to 3.30 PM tea and snacks for Plant side.
[6] Between 10.30 /01.00 /3.30 AM midnight tea and dry snacks items will be
Served for “C “S hif t Persons (10.00 PM to 6.00 AM).
[C] DEPARTMENT SERVICES FOR TEA /SNACKS/ LUNCH / DINNER:
SR LOCATION SHIFT TIMING
Morning Hours a) 9.00 A.M. TO 09.30 A.M.
(Tea & Wet & Dry Snacks)
After hours b ) 3.00 P.M. TO 3.30. P.M.
(Tea & Dry Snacks)
[D] PENTRY SERVICE:
1) Contractor will make arrangement to collect Tea/Coffee and Snacks items from pantry
at admin Building.
2) Tea/Coffee and Snacks shall be made available to company’s Guest during General
Shift working hours. No pantry services will be available after 5.30 pm
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
SCHEDULE OF DEVIATION FROM GENERAL AND TENDER
All the deviations from the general and technical specifications shall be filled by Bidders
clause by clause in this schedule.
Sr. SECTION CLAUSE NO AS PER TENDER DEVIATION
The Bidder hereby certify that the above mentioned are the only deviations from GIPCL’s
General / Technical Condition(s) of this tender enquiry. The Bidder further confirms that,
in the event any other data and information presented in the Bidders proposal and
accompanying documents are at variance with specific requirements laid out in the
GIPCL’s General / Technical Specifications, then the latter shall govern and will be
binding to the Bidder for the quoted rates / price.
Sign & Stamp of bidder:
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of appropriate value)
B.G. No. Date :
1. WHEREAS M/s. Gujarat Industries Power Company Limited having its Corporate Office at
PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter called “The
Company Owner” which expression shall unless repugnant to the subject or context
includes its legal representatives, successors and assigns) has issued tender paper vide
---------- (hereinafter called “the said tender”) to M/s.
……………………………(hereinafter called the said Tenderer(s)” which expression
shall unless repugnant to the subject or context includes their legal representatives,
successors and assigns and as per terms and conditions of the said tender,
the tenderer shall submit a Bank guarantee for Rs.………. (Rupees
……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this guarantee
without any demur, merely on a demand from the Company stating that in the
opinion of the company which is final and binding, the amount claimed
is due because of any withdrawal of the tender or any material alteration to the
tender after the opening of the tender by way of any loss or damage caused to or
would be caused or suffered by the Company by reason of any breach by the said
tenderer(s) of any of the terms and conditions contained in the said tender or
failure to accept the letter of Intent Agreement or that the amount covered
under this Guarantee is forfeited. Any such demand made on the Bank by the
owner shall be conclusive as regards the amount due and payable by the Bank under
this guarantee, However, our liability under this guarantee shall be restricted to an
amount not exceeding Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the tenderer (s) in any suit or
proceeding pending before any office, court or tribunal relating thereto our liability
under this present guarantee being absolute and unequivocal. The payment so made
by us under this bond shall be a valid discharge of our liability for payment there
under. Our liability to pay is not dependent or conditional on the owner
proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said tenderer(s) but shall in all respect and for all
purposes be binding and operative until payment of all money due or liabilities
under the said contract(s)/ Order(s) are fulfilled..
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
finalization of the said tender and that it shall continue to be enforceable till the said
tender is finally decided and order placed on the successful tenderer(s) and or
till all the dues of the company under or by virtue of the said tender have been fully
paid and its claims satisfied or discharged or till a duly authorized officer of the
company certifies that the terms and conditions of the said tender have been fully
and properly carried out by the said tenderer (s) and accordingly discharges the
6. That the Owner Company will have full liberty without reference to us and
without affecting this guarantee to postpone for any time or from time to time the
exercise of any of the power of the owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission
Date………. ………………………… Bank
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE
GUARANTEE BY SELLER / CONTRACTOR.
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office
at PO: Ranoli, Dist. Vadodara – 391 350, Gujarat State, India (hereinafter referred
to as “The Company/Owner” w h i c h expressions sha ll unless
repugnant to the subject or context includes its legal representatives, successors
and assigns) has entered into a contract with M/s. ………………………………../
has placed a purchase order on M/s………………………….(hereinafter
referred to as “Contractor(s)/ Seller(s)” which expression shall unless
repugnant to the subject or context includes their legal representatives,
successors and assigns ) for …………………………….on the terms and
conditions as set out inter alia, in the Company’s contract No./
P.O.No.…………..date …………and various documents forming part thereof
hereinafter referred to as the “said contract” which expression include all
amendments, modifications and/ or variations thereto and whereas the
Contractor(s)/ Seller(s) has agreed for due execution of the entire contract and
guarantees its performance including any parts executed through any other
agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is
that “contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a
bank for ….% (……….percent) of the total value of the “said contract” against due
and faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s)/seller(s) for execution/ supplies made
under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating that
in the opinion of the Company, which is final & binding, the amount claimed
is due by reason of default made by the Contractor(s)/ Seller(s) in performing any
of the terms & conditions of the said Contract including defect liability obligations,
in fulfilling the performance guarantee obligation or loss or damage caused to or
would be caused to or suffered by the Company by reason of any breach by the
said Contractor (s)/ Seller(s) of any of the terms & conditions of the contract. Any
such demand made on the Bank by the owner shall be conclusive as regards the
amount due and payable by the Bank under this guarantee. However, our liability
under this guarantee shall be restricted to Rs.……(Rupees………………………only).
3. We undertake to pay to the Company any money so
demanded not withstanding any dispute or disputes raised by the contractor(s)/
Seller(s) in any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and unequivocal. The
payment so made by us under this bond shall be a valid discharge of our liability
for payment there under. Our liability to pay is not dependent or conditional on the
owner proceeding against the Contractor(s)/ Seller(s).
4. The guarantee herein contained shall n o t be determined or affected or
suspended by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all respect
and for all purposes be binding and operative until payment of all money due or
liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the OWNER/PURCHASER
and further agrees that if this guarantee is extended for a period as mutually agreed
between bidder & owner/purchaser, the guarantee shall be valid for a period so
extended provided that a written request for such extension is received before the
expiry of validity of guarantee.
6. W e ……………Bank further agree with the Company that the company shall have
the fullest liberty without our consent and without affecting in any manner our
obligations hereunder to vary any of the terms and conditions of the said
Contract(s)/ Order(s) or to extend the time of performance by the said Contractor(s)
Seller(s) from time to time or to postpone for any time or from time to time any of
the powers exercisable by the Company against the said Contractor(s)/
Seller(s) and to forbear or enforce any of the terms and conditions relating to the
said Contract(s)/ Order(s) and we shall not be relieved from our liability by reason
of any such variation, or extension being granted to the said Contractor (s) /
Seller(s) or for any forbearance, act or omission on the part of the Company
or any indulgence by the Company to the said Contractor(s)/ Seller(s) or by any such
matter or thing whatsoever which under the law relating to sureties would, but for this
provision, have affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs……………. (Rupees…………only) and s h a l l r em ain i n f orce till.……. Unless
a demand or claim under this Guarantee is made on us within three months from
the date of expiry we shall be discharged from all the liabilities under this
Date………. …………………………. Bank
Corporate Seal of the Bank By its constitutional Attorney
Signature of duly Authorized
person on behalf of the Bank
With Seal & Signature code
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
INSTRUCTIONS TO FILL PRICE BID:
1) The tender shall be read in conjunction with Instructions to Bidders, General
conditions of contract and scope of work.
provisional, and are given to provide a common basis for bidding. The basis of
payment will be actual quantities of ‘Agreement’ and carried out, as measured by the
Contractor and verified by the GIPCL and valued at the rates and prices given in the
contract in the priced Schedule of Rates, where applicable, and otherwise at such
rates and prices as the GIPCL may fix within the terms of contract.
provided under the Contract include all Equipment, Labour, Supervision, Direction,
Control, Materials, Insurance, Profit, Taxes and duties, together with all general risks,
liabilities and obligations set out or implied in the contract.
quantities are stated or not. The cost of items against which the Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
5) The bidder has to quote single rate for canteen and plant serving location. The item
rate for food quoted by the bidder for Industrial canteen will be equally applicable to
the food serve in plant area also.
6) The whole cost of complying with the provisions of the contract shall be included in
the items provided in the priced schedule, and where no items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related
items of works.
with technical bid).
8) No separate amount shall be payable for use of auxiliary equipment incidental to or
in day to day operation in the course of fulfillment of contractual obligation of the
9) COMMON GUIDELINE FOR FILL UP PRICE BID:
(a) The prices are considered as per Schedule of Rate (SOR) fixed through out of
Contract period.
(b) Vendor has to enter value which indicate % price offer above or below or equal to
Schedule of Rate (SOR).
(c) Vendor shall insert negative value like -1, -2, -3 which indicate % below price on
Schedule of Rate (SOR).
(d) Vendor shall insert positive value like 1, 2, 3 which indicate % above price on
schedule of Rate (SOR).
(e) Vendor shall insert value like 0 (zero) which indicate equal to schedule of Rate (SOR).
schedule will not be accepted. (Except un-priced copy to be submitted with
technical bid).
10) E- REVERSE AUCTION:
(a) GIPCL reserves the right to conduct e-reverse auction through N-procure
(b) E-Reverse auction shall be conducted amongst (a) the Lowest 50% bidders
from the total bids received OR (b) Minimum 3 Lowest bidders, whichever is
higher shall be invited for E-reverse auction through n-procure platform.
(c) Opening Price, Detrimental value and duration for the E-Reverse Auction shall
be informed to the qualified bidders before start of E-Reverse Auction.
(d) The basis of e-reverse auction shall be the lowest price received through initial
price bid. The participating bidders in the e-reverse auction shall offer price
lower than the initial lowest price then any the e-reverse auction will be
declared as completed.
(e) E-reverse auction shall be on total value of item Sr. No. 1 to 10 of price
schedule. Final evaluation shall be done on total value of item Sr. No. 1 to
received after E-reverse auction.
(f) To participate in e-Reverse Auction, Bidders have to create e-Auction USER
ID on https://e-auction.nprocure.com and have to submit the same to GIPCL
that the bidder shall be allowed to participate the E- Reverse Auction.
the contract for the period of 24 months. GIPCL does not guarantee for utilization /
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
(On bidder’s Firm’s Letter Head)
I / We ______________________________________________ authorized signatory of
M/s _____________________________________ here by certify that
M/s _________________________________________ is not related with other firms
who have submitted tenders for the same items under this inquiry / Tender for the work
of Biannual Rate Contract for running of Industrial Canteen at the Plant premises located
at GIPCL, AT & POST: RANOLI, DIST: VADODARA - 391
Seal of the Firm Signature of the Bidder
With Designation
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
(On bidder’s Firm’s Letter Head)
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
I ______________________ on behalf of ………Name of Party/Company………...hereby confirm, agree
and undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall
be strictly followed for all types of works at GIPCL site during the period of the Contract, if awarded to me.
Further, I ……Name of Party/Company…… also hereby confirm, declare and undertake that there has not
been any major Safety Violation and any single Fatal Accident at any site(s) during the execution of the
contract/contracts awarded to me during the period of preceding Three years.
Signed and Stamped by the
Authorized Signatory
(On bidder’s Firm’s Letter Head)
Declaration for Contractual Disputes/ Litigations
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm that I/We
have not been engaged in any Industrial Dispute(S) or have invoked legal recourse e.g. Arbitration and/or
litigation against any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations for the last Five (05) years. There are no ongoing/pending legal
matter(s) with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including GIPCL.
I/We also confirm that M/s ……………... ……. Have not been Blacklisted/ deregistered / listed under stop
Deal by any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported companies
/ undertakings / organizations, including GIPCL for the last Five (05) years.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard
shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
GUJARAT INDUSTRIES POWER COMPANY LIMITED
AT & POST: RANOLI, TALUKA: VADODARA, DIST: VADODARA
PIN: 391 350 (GUJARAT)
PHONE NO.: (0265)
Tender Notice No. GIPCL / BRD / CANTEEN / 2026-2028
(On bidder’s Firm’s Letter Head)
of M/s _____________________________________ here by certify that M/s
_________________________________________ has not been black listed,
deregistered as under by any Government / Semi Government / Public Sector
Undertaking / Private sector in last Five years.
Seal of the Firm Signature of the Bidder
With Designation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
INDUSTRIAL CANTEEN TENDER ANNEXURE A- TO - O.pdf
INDUSTRIAL CANTEEN TENDER ANNEXURE- P.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .