Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l-1₹1.4 LAccepted-AOC | l-1 | Accepted-AOC LOW RATE | |
| 2 | l-2₹1.5 L+₹10,786 (7.58%)Rejected-Finance PREMNAGAR TAPIN RAUTA TAPIN RAMGARH 825326 | RAMGARH | JHARKHAND | 825326 | l-2 | Rejected-Finance high rate | |
| 3 | l-3₹1.8 L+₹38,299 (26.9%)Rejected-Finance | l-3 | Rejected-Finance high rate |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
7 Feb 2025, 5:00 pmClosed
ACE PB AREA
PB AREA
Renovation of room for installation of Power winch at 2 pit (m) in Gopalichak colliery under PB Area
2025_BCCL_327022_1
GM/PBA/ACE/ENIT/24-25/89 DT 27.01.2025
Open Tender
Civil Works - Others
Item Rate
15 days
GOPALICHAK
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,300
18 Feb 2025
28 Jan 2025
10 Feb 2025
28 Jan 2025
7 Feb 2025
28 Jan 2025
28 Jan 2025 - 3 Feb 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources).
Brick work in clay flyash brick F&P (1:6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Brick work in clay flyash brick (1:6) S:S
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
P/F/F GI sheet Labour charge
Colour wash with two/more coat
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
P/F/F angle Labour charge
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Total impact of GST for the purpose of CTC
Dhananjay Kumar Singh (BID ID -1124241)
JAGJEET SINGH CHAWLA (BID ID -1125606)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .