Tender Value
₹12.7 L
EMD Value
₹1.3 L
Closing Date
26 Sept 2026, 5:00 pmClosed
EEMI BAREILLY
MINOR IRRIGATION BAREILLY
CLUSTER 13 RAMNAGAR 04- UCCH P.V. VILLAGE ISLAMPUR DALEEPUR BLOCK RAMNAGAR 05- PANCHAYAT GHAR VILLAGE JAGTEERA BLOCK RAMNAGAR 06- J.H.S. VILLAGE CHURDAIDALPATPUR BLOCK MEERGANJ DISTRICT BAREILLY.
2026_UPMID_1185497_13
555/M.I./RWH/E-Tender/2026-27 Date 25.08.2026
Open Tender
Civil Works
Percentage
30 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
EEMI
₹1.3 L
16 Oct 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING SYSTEM CLUSTER-13 | |||||
| 1.01 | Dismentling C.C work including clearing and staking of material within 60.0 mtr. | 8.76 | Cum | 35 | ₹306.6 |
| 1.02 | Earthwork in Excavation of Ordinary soil and Soil mixed with Kankar. | 118.86 | Cum | 120 | ₹14,263.2 |
| 1.03 | Cement Concrete with 1:4:8 Cement, sand, stone ballast (20-50 MM) including cost of material at site Labour, T&P etc. required for proper completion of work | 9.65 | Cum | 6,394 | ₹61,727.68 |
| 1.04 | Laying of P.V.C pipes including jointing ,coupling, cutting for making correct length | 474 | Mtr | 15 | ₹7,110 |
| 1.05 | Earth work in back filling of trenches after laying P.V.C pipe | 4.59 | Cum | 25 | ₹114.75 |
| 1.06 | Dismantling old plaster including raking out jiont and disposal of debris within 60 mtr distance | 38.5 | Sqm | 30 | ₹1,155 |
| 1.07 | M -150 brick work in 1:4 (cement and coarse sand of 2.25 F.M. mortar)in foundation and plinth including supply of materials , labour and T& P etc. required for proper completion of work . | 47.05 | Cum | 5,660.4 | ₹2,66,299.18 |
| 1.08 | Plain Cement concrete with 2cm guage stone grit course sand & cement in proportion of 4:2:1 including supply of materials , labour and T& P etc. required for proper completion of work . | 51.97 | Cum | 6,836.5 | ₹3,55,292.9 |
| 1.09 | Plaster Work in 1:4 Cement Sand Mortar Over BrickMasonary | 434.15 | Sqm | 224.3 | ₹97,379.85 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.53 MB
BOQ_2231222.xls
BOQ • 0.30 MB
CLUSTER13BAREILLY.pdf
Tender Documents • 1.40 MB
RWHBLY.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .