| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹10.3 L+₹32,142.35 (3.21%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Nidhin L2 | MOHAMMED SABIR E K L1 |
|---|---|---|---|---|---|
| 1.00VOLLEY BALL COURT CONSTRUCTION | |||||
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 77.35 | cum | 430 ₹33,260.5 | 411.03 ₹31,793.17 Lowest |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 4.73 | cum | 617 ₹2,917.79 | 520.75 ₹2,462.63 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 36 | cum | 4,800 ₹1,72,800 Lowest | 6,297.93 ₹2,26,725.48 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.08 | cum | 7,500 ₹607.5 | 7,332.67 ₹593.95 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.09 | cum | 8,600 ₹3,36,156.8 | 7,910.81 ₹3,09,217.74 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,563.52 | kilogram | 98 ₹1,53,224.96 | 89.26 ₹1,39,559.8 Lowest |
| 1.01 | OD36298/2026-2027:Supply and installation of ITF certified 5 layers acrylic system with thickness up to 2 mm.the flooring should have application as first layer of primer (% 100 acrylic latex based emulsion to improve bond of acrylic court system to the asphalt sw face having consumption ratio of 0.014 kg/sqft)second layer of acrylic Re surface ( Filling and smoothing asphalt or concrete smface in preparation of Acrylic Volley ball court/Badminton court system and also fills the surface chips,voids and conceals repairs while providing a smooth surface for colour coating.It should have a consumption ration of 0.046 kg/ sqft),3 third and fourth layer of precoat (Quartz filled %100 acrylic latex based textured Volley ball court/Badminton court with total consumption ratio of 0.078 kg/sqft) and Fifth layer of Topcoat (100 %acrylic latex polymer & amp : colour coat for the textured tennis coat with total consumption ratio of 0.078 kg/sqft ) and Fifth layer of Top coat (100 % acrylic latex polymer &amp: color coat for the finished surface to protect from UV. It should have consumption ratio of 0.023 kg/sqft ) On top of these 5 layers,the line marking should be done with Overline paint (100 % acrylic latex based high hiding line paints. It should have consumption ratio of 4 kg/ court.4 The acrylic resurfacer must have silica sand in fill to be embedded into it with consumption ratio of 0.065 kg/sqft | 360 | sqm | 800 ₹2,88,000 | 686.17 ₹2,47,021.2 Lowest |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 40.91 | kg | 150 ₹6,136.8 | 148.51 ₹6,075.84 Lowest |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 2 | sqm | 130 ₹260.39 Lowest | 130.82 ₹262.03 |
Tender Value
₹11.9 L
EMD Value
₹29,658
Closing Date
19 Sept 2026, 6:00 pmClosed
Assistant Execurtive Engineer
Office of the Executive Engineer LID AND EW DIVISION, KASARAGOD P.O. VIDYANAGAR
Construction of Volley Ball Court
2026_LSGD_868762_1
56/2026-27
Open Tender
Civil Works - Buildings
Item Wise
180 days
KODOM BELOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹29,658
Yes
8 Oct 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1VOLLEY BALL COURT CONSTRUCTION | |||||
| 1.001 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 77.35 | cum | - | - |
| 1.002 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 4.73 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 36 | cum | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.08 | cum | - | - |
| 1.005 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.09 | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,563.52 | kilogram | - | - |
| 1.007 | OD36298/2026-2027:Supply and installation of ITF certified 5 layers acrylic system with thickness up to 2 mm.the flooring should have application as first layer of primer (% 100 acrylic latex based emulsion to improve bond of acrylic court system to the asphalt sw face having consumption ratio of 0.014 kg/sqft)second layer of acrylic Re surface ( Filling and smoothing asphalt or concrete smface in preparation of Acrylic Volley ball court/Badminton court system and also fills the surface chips,voids and conceals repairs while providing a smooth surface for colour coating.It should have a consumption ration of 0.046 kg/ sqft),3 third and fourth layer of precoat (Quartz filled %100 acrylic latex based textured Volley ball court/Badminton court with total consumption ratio of 0.078 kg/sqft) and Fifth layer of Topcoat (100 %acrylic latex polymer & amp : colour coat for the textured tennis coat with total consumption ratio of 0.078 kg/sqft ) and Fifth layer of Top coat (100 % acrylic latex polymer &amp: color coat for the finished surface to protect from UV. It should have consumption ratio of 0.023 kg/sqft ) On top of these 5 layers,the line marking should be done with Overline paint (100 % acrylic latex based high hiding line paints. It should have consumption ratio of 4 kg/ court.4 The acrylic resurfacer must have silica sand in fill to be embedded into it with consumption ratio of 0.065 kg/sqft | 360 | sqm | - | - |
| 1.008 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 40.91 | kg | - | - |
| 1.009 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 2 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1471642.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd56.pdf
Tender Documents • 1.82 MB
BOQ_1471642.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .