Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 LAdmitted-Finance 204B SENTHAMANGALAM GOTHANDARAMPURAM VILLAGE PERUMANADU POST VAYALOGAM VIA PUDUKKOTTAI DIST TN | PUDUKKOTTAI | TAMIL NADU | 622104 | ₹43.9 L | L1 | Admitted-Finance |
| 2 | L2₹45.7 L+₹1.8 L (4.05%)Admitted-Finance NO 10 130B ST1 JAGATHALA ROAD ARUVANKADU VINAYAGAR KOVIL STREET KETHI THE NILGIRIS TAMIL NADU 643 202 | KETHI | THE NILGIRIS | TAMIL NADU | 643202 | ₹45.7 L+₹1.8 L (4.05%) | L2 | Admitted-Finance |
| 3 | L3₹46.0 L+₹2.1 L (4.83%)Admitted-Finance E 11 CWE WELLINGTON A I A II A V B I | KOLKATA | WEST BENGAL | 700001 | ₹46.0 L+₹2.1 L (4.83%) | L3 | Admitted-Finance |
| 4 | L4₹46.5 L+₹2.6 L (5.96%)Admitted-Finance | ₹46.5 L+₹2.6 L (5.96%) | L4 | Admitted-Finance |
| 5 | L5₹46.6 L+₹2.7 L (6.06%)Admitted-Finance | ₹46.6 L+₹2.7 L (6.06%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M Govindarajan L1 | p.chinnasamy L5 | Vishnu Infrastructures L7 | RAJASEKARAN L4 | SREE CONSTRUCTIONS L8 | P2 CONSTRUCTION L2 | VENKATESH L3 | RISHAN INFRA ENTERPRISES L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Preparation of old decorated surfaces of ceiling and applying one coat of white washing complet all as specified and directed. | 1,000 | SQM | 17 ₹17,000 Lowest | 20 ₹20,000 | 20 ₹20,000 | 19.5 ₹19,500 | 20 ₹20,000 | 20 ₹20,000 | 19 ₹19,000 | 24 ₹24,000 |
| 2.00 | Preparation of old plastered surfaces of walls and applying one coat of cement base paint on wall surfaces complete all as specified and directed. | 4,000 | SQM | 56 ₹2,24,000 | 59 ₹2,36,000 | 60 ₹2,40,000 | 59 ₹2,36,000 | 36 ₹1,44,000 Lowest | 57 ₹2,28,000 | 58 ₹2,32,000 | 59 ₹2,36,000 |
| 3.00 | Applying one coat of oil bound distemper on old deorated plastered surfaces of walls including preparation of surfcaes and filling holes and undulations with wall putty all as specified and directed. | 4,900 | SQM | 58 ₹2,84,200 | 60 ₹2,94,000 | 65 ₹3,18,500 | 61 ₹2,98,900 | 35 ₹1,71,500 Lowest | 59 ₹2,89,100 | 60 ₹2,94,000 | 61 ₹2,98,900 |
| 4.00 | Applying one coat of wall care putty to cover old uneven plastered surfaces in wall/ ceiling upto 1mm to cover undulations and finished even and smooth using emery paper all as specified and directed . | 80 | SQM | 115 ₹9,200 | 120 ₹9,600 | 125 ₹10,000 | 119 ₹9,520 | 16 ₹1,280 Lowest | 117 ₹9,360 | 118 ₹9,440 | 119 ₹9,520 |
| 5.00 | Taking down cement or cement lime plaster on brick walls incl racking out joints hacking for key scrubbing down with water etc all as specified and directed. | 190 | SQM | 100 ₹19,000 | 110 ₹20,900 | 110 ₹20,900 | 112 ₹21,280 | 60 ₹11,400 Lowest | 111 ₹21,090 | 110 ₹20,900 | 115 ₹21,850 |
| 6.00 | Rendering 15mm thick on fair faces of brick work or concrete surfaces of walls in Cement Mortar 1:4 finished even and smooth without using extra cement complete all as specified and directed. | 120 | SQM | 340 ₹40,800 Lowest | 347 ₹41,640 | 400 ₹48,000 | 348 ₹41,760 | 390 ₹46,800 | 345 ₹41,400 | 346 ₹41,520 | 350 ₹42,000 |
| 7.00 | Rendering 5mm thick in cement mortar 1:3 on concrete surfaces of ceiling finished even and smooth (without using extra cement) complete all as specified | 70 | SQM | 240 ₹16,800 Lowest | 250 ₹17,500 | 250 ₹17,500 | 252 ₹17,640 | 280 ₹19,600 | 249 ₹17,430 | 250 ₹17,500 | 255 ₹17,850 |
| 8.00 | Applying two coats of cement base paint over a coat of alkali resistant primer on newly plastered surfaces of wall including preparation of surfaces all as specified and directed. | 60 | SQM | 120 ₹7,200 | 150 ₹9,000 | 150 ₹9,000 | 131 ₹7,860 | 90 ₹5,400 Lowest | 129 ₹7,740 | 130 ₹7,800 | 135 ₹8,100 |
| 9.00 | Applying three coats of whitewash on newly palstered ceiling surfaces including preparation of ceiling surface all as specified and directed. | 70 | SQM | 40 ₹2,800 | 50 ₹3,500 | 50 ₹3,500 | 53 ₹3,710 | 25 ₹1,750 Lowest | 48 ₹3,360 | 50 ₹3,500 | 55 ₹3,850 |
| 10.00 | Preparation of new plastered wall surfaces and applying two coats of distemper oil emulsion over a coat of alkali resistant primer complete all as specified and directed. | 60 | SQM | 90 ₹5,400 | 115 ₹6,900 | 120 ₹7,200 | 115 ₹6,900 | 80 ₹4,800 Lowest | 109 ₹6,540 | 110 ₹6,600 | 115 ₹6,900 |
Tender Value
₹43.0 L
EMD Value
₹86,000
Closing Date
13 Jul 2026, 6:00 pmClosed
GE WELLINGTON
Garrison Engineer Wellington Barrack Post The Nilgiris Pin code-643231
COMPREHENSIVE MAINTENANCE INCLUDING PERIODICAL SERVICES, REPAIRS TO JOINERY, WALL FLOORING AND REPAIR / MAINT OF ROAD INCLUDING FOOT PATH AND OTHER CONNECTED WORKS AT TRICHY AREA UNDER GE WELLINGTON
2026_MES_773476_1
8283/E8
Open Tender
Civil Works
Item Rate
180 days
Trichy
As per tender document
7 documents required · 7 mandatory
₹500
GE WELLINGTON
₹86,000
Yes
17 Aug 2026
19 Jun 2026
22 Jul 2026
20 Jun 2026
13 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of old decorated surfaces of ceiling and applying one coat of white washing complet all as specified and directed. | 1,000 | SQM | - | - |
| 2 | Preparation of old plastered surfaces of walls and applying one coat of cement base paint on wall surfaces complete all as specified and directed. | 4,000 | SQM | - | - |
| 3 | Applying one coat of oil bound distemper on old deorated plastered surfaces of walls including preparation of surfcaes and filling holes and undulations with wall putty all as specified and directed. | 4,900 | SQM | - | - |
| 4 | Applying one coat of wall care putty to cover old uneven plastered surfaces in wall/ ceiling upto 1mm to cover undulations and finished even and smooth using emery paper all as specified and directed . | 80 | SQM | - | - |
| 5 | Taking down cement or cement lime plaster on brick walls incl racking out joints hacking for key scrubbing down with water etc all as specified and directed. | 190 | SQM | - | - |
| 6 | Rendering 15mm thick on fair faces of brick work or concrete surfaces of walls in Cement Mortar 1:4 finished even and smooth without using extra cement complete all as specified and directed. | 120 | SQM | - | - |
| 7 | Rendering 5mm thick in cement mortar 1:3 on concrete surfaces of ceiling finished even and smooth (without using extra cement) complete all as specified | 70 | SQM | - | - |
| 8 | Applying two coats of cement base paint over a coat of alkali resistant primer on newly plastered surfaces of wall including preparation of surfaces all as specified and directed. | 60 | SQM | - | - |
| 9 | Applying three coats of whitewash on newly palstered ceiling surfaces including preparation of ceiling surface all as specified and directed. | 70 | SQM | - | - |
| 10 | Preparation of new plastered wall surfaces and applying two coats of distemper oil emulsion over a coat of alkali resistant primer complete all as specified and directed. | 60 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tender8283.pdf
Tender Documents • 1.16 MB
BOQ_866073.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .