| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-AOC | ₹11.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹13.3 LRejected-AOC | ₹13.3 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | REVATHY CONSTRUCTIONS L1 | Mohammed Ali L2 |
|---|---|---|---|---|---|
| 1.00Gabion Wall | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 52.5 | sqm | 15.26 ₹801.15 | 16.22 ₹851.55 |
| 1.00 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 91.38 | cum | 2,103.72 ₹1.9 L | 2,236.27 ₹2.0 L |
| 1.00 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 91.38 | cum | 638.25 ₹58,323.29 | 678.46 ₹61,997.67 |
| 1.00 | 16.96:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ±2%), Zinic+10%Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD),mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbersof openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge | 162 | cum | 4,568.42 ₹7.4 L | 5,308.13 ₹8.6 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 11.55 | sqm | 346.97 ₹4,007.50 | 368.84 ₹4,260.10 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.3 | cum | 7,623.94 ₹1.2 L | 8,104.3 ₹1.2 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 244.8 | kilogram | 101.72 ₹24,901.06 | 108.13 ₹26,470.22 |
| 1.01 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 68.28 | cum | 544.12 ₹37,152.51 | 578.41 ₹39,493.83 |
| 1.01 | OD38556/2024-2025:Providing filter for gabion wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched together pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed prevent erosion of soil through gabion layers including conveyance and all leads and lifts etc. complete. | 78 | sqm | 94.95 ₹7,406.10 | 100.93 ₹7,872.54 |
Tender Value
₹12.1 L
EMD Value
₹30,209
Closing Date
6 Nov 2025, 5:00 pmClosed
AEE
O/o AEESouthsubdivisiontvm
GENERAL-Neyyar River Basin-NGT- Urgent rectification
2025_Irrig_756445_3
IRR/IA/TR/91/2022_5_21_22/1
Open Tender
Civil Works - Others
Neyyattinkara
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹30,209
3 Jan 2026
1 Nov 2025
10 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
Amount
Gabion Wall
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
16.96:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ±2%), Zinic+10%Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD),mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbersof openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD38556/2024-2025:Providing filter for gabion wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched together pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed prevent erosion of soil through gabion layers including conveyance and all leads and lifts etc. complete.
Mohammed Ali (BID ID -2430577)
Bidder Name
Mohammed Ali
REVATHY CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370872.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewnit.pdf
Tender Documents • 0.04 MB
viewsbd.pdf
Tender Documents • 1.84 MB
BOQ_1370872.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid