Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.5 LAccepted-AOC 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L-1 | Accepted-AOC Lowest Bidder | |
| 2 | L-2₹15.3 L+₹1.8 L (13.3%)Rejected-Finance | L-2 | Rejected-Finance Quoted Higher |
Tender Value
Refer Docs
Closing Date
4 Feb 2021, 3:00 pmClosed
Chief General Manager/Business Development
C-4, District Center, Saket, New Delhi
Prebid Consulting Services for 1. Four/Six lane Greenfield Ludhiana - Rupnagar NHAI Project Pkg 1 2. Four/Six lane Greenfield Ludhiana - Rupnagar NHAI Project Pkg 2. 3.Four/Six lane Greenfield Ludhiana - Rupnagar NHAI Project Pkg 3
2021_IRCON_68157_1
IRCON/BD/2021/T/H/N/L-R/P 1 - P 3
Limited
Consultancy
Lump-sum
15 days
Saket, New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
23 Sept 2022
25 Jan 2021
5 Feb 2021
25 Jan 2021
4 Feb 2021
28 Jan 2021
Amount
Consultancy Services
Pre-Bid Engineering Services for the work of, (i) Construction of Four/Six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode, Package-1 (Section from Design Ch. To Design Ch. 37.700, total length 37.700 km)on Hybrid Annuity Mode. (ii) Construction of four/six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode, Package-2 (Design Ch. 37.700 to Design Ch. 66.000 and Ludhiana Bypass Design Ch. 0.000 to Design Ch. 18.500, total length 46.80 km) (iii) Construction of Four/Six lane Greenfield Ludhiana – Rupnagar National Highway no. NH-205K from junction with NE-5 village near to Manewal (Ludhiana) to junction with NH-205 near Bheora Village (Rupnagar) including spur to Kharar with Ludhiana bypass under Bharatmala Pariyojana in the State of Punjab on Hybrid Annuity Mode : Package-3 (Design Ch. 66.000 to Design Ch. 91.000 and spur to kharar Design Ch. 0.000 to Design Ch. 19.500, total length 44.50 km).
Shweta Technophile Consultants Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .