Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ANIL KARUNAN L1 |
|---|---|---|---|---|
| 1.00side protection | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 120 | sqm | 8.02 ₹962.4 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 37.09 | cum | 316.77 ₹11,750.58 Lowest |
| 1.00 | OD507682/2024-2025:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing | 192.28 | cum | 3,724.16 ₹7,16,092.66 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 7.88 | cum | 12,258.85 ₹96,612 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 28.5 | sqm | 357.67 ₹10,193.6 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 551.32 | kilogram | 104.86 ₹57,811.42 Lowest |
| 1.01 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 500 | per Letter per cm height | 5.95 ₹2,975 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,141
Closing Date
1 Oct 2025, 5:00 pmClosed
Executive engineer
Office of executive engineer Kalpetta
Annual Plan-Wayanad DP - 2024-25 - Pr No. 661/25 - Melekkappu ST Unnathi Sidekettu Protection - Pulpally GP-1000000/--General Civil Work--Quotation
2025_LSGD_800987_73
D2-2374/2025(4)
Open Tender
Civil Works - Roads
Item Rate
300 days
Kalpetta
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹21,141
Yes
21 Nov 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
1 Oct 2025
24 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1331485.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .