Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC VILLAGE THARAS P O HURLA TEHSIL BHUNTAR DISTT KULLU H P 175125 | KULLU | HIMACHAL PRADESH | 175125 | L1 | Accepted-AOC Eligible | |
| 2 | L2₹5.1 Cr+₹42.9 L (9.12%)Rejected-Finance GOPAL CHOWK SUNDERNAGAR | SUNDERNAGAR | MANDI | HIMACHAL PRADESH | 175018 | L2 | Rejected-Finance In Eligible | |
| 3 | L3₹5.7 Cr+₹1.0 Cr (22.1%)Rejected-Finance VILL PANOH PO CHOURI TEHSIL SUJANPUR DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | L3 | Rejected-Finance In Eligible | |
| 4 | L4₹6.0 Cr+₹1.3 Cr (27.4%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance In Eligible |
Tender Value
₹7.1 Cr
EMD Value
₹7.9 L
Closing Date
1 Feb 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Jal Shakti Division Kullu
SH Construction of RCC cantilever retaining wall toe wall and apron river diversion removal of obstruction at RD 50000 to 50300 300
2025_HPIPH_98526_2
11093-11142 Bhunter Bridge
Open Tender
Civil Works
Item Rate
90 days
Near Bhunter Bridge
Please refer Tender documents.
15 documents required · 15 mandatory
₹10,000
Executive Engineer
₹7.9 L
21 Mar 2025
22 Jan 2025
3 Feb 2025
22 Jan 2025
1 Feb 2025
22 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting of all kinds of soil using mechanical means (Hydraulic Excavator and tippers) / manual means disposal upto all lead and lifts complete in all respect as per direction and to the entire satisfaction of Engineer-in-charge. | 4,378.5 | Cum. | - | - |
| 2 | Earthwork in excavation by mechanical means (Hydraulic Excavator and Tippers)/manual means i/c dressing of sides , ramming of bottoms and bailing out water from river , retaining the required soil into trenches in 15 cm layers duly ramming & stacking the excavated soil for use in back filling and disposal of surplus excavated earth with in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 8,109.3 | Cum. | - | - |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40 mm nominal size ) and curing complete excluding cost of formwork in foundation and plinth with in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 307.5 | Cum. | - | - |
| 4 | Providing and laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size ) and curing complete excluding cost of formwork in foundation and plinth with in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 1,201.5 | Cum. | - | - |
| 5Providing form work with mild steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering and removal of the same for insitu- reinforced concrete work and plain concrete work in with in all lead and lift. The plates shall be sand papered and properly graced with oil before its placement for formwork complete in all respect as per direction and to the entire satisfaction of Engineer-in-charge.:- | |||||
| 5.01 | In foundation , footings bases of columns etc and mass concrete. | 5,610 | Sqm | - | - |
| 5.02 | In Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. | 3,306 | Sqm | - | - |
| 6Providing and laying cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded stone aggregate 20 mm nominal size )i/c bailing out water , pumping of water or diversion of river flow and curing complete excluding cost of formwork and reinforcement for reinforced concrete work complete in all respect as per direction and to the entire satisfaction of the Engineer-in-Charge. | |||||
| 6.02 | i) In foundations ,footings bases of columns and the like and mass concrete work complete in all respects | 1,992 | Cum. | - | - |
| 7 | Providing and laying tor steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete i/c cost of binding wire complete in all respect within all leads and lifts as per the direction and to the entire satisfaction of the Engineer-in-charge. | 1,11,160.56 | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_144824.xls
BOQ • 0.28 MB
161440729.pdf
Tender Documents • 0.35 MB
161440731.html
Tender Documents • 0.07 MB
FORMEIGHT.pdf
Tender Documents • 0.55 MB
FORMSIX.pdf
Tender Documents • 0.31 MB
TERMSANDCONDITION.pdf
Tender Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .