Tender Value
₹82.4 L
EMD Value
₹82,500
Closing Date
7 Apr 2026, 6:10 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Civil Engineer Vijapur Nagarpalika, Vijapur, Dist : Mahesana
Construction Work for C.C. Road,Fixing precast rubber dye inter locking concrete Block,Slab Drain,Compound Wall And Drainage Line In Nagarpalika Vistar at Vijapur Nagarpalika,Vijapur
289492
24 of 2025-26
Open
Miscellaneous Works
Mehsana
3 documents required · 3 mandatory
₹2,832
Chief Officer Vijapur Nagarpalika
₹82,500
24 Mar 2026
24 Mar 2026
24 Mar 2026
7 Apr 2026
24 Mar 2026
Name of Work : Construction Work for C.C. Road,Fixing precast rubber dye inter locking concrete Block,Slab
Drain,Compound Wall And Drainage Line In Nagarpalika Vistar at Vijapur Nagarpalika,Vijapur.
Memorandum showing items works to be carried out :
Item QuantitiesEs Item Of Work Tendered Rate Unit Total Amount
Item QuantitiesEs Item Of Work Tendered Rate Unit Total Amount
No. timated Qty. according to
In Figure In Words
A Construction Drainage Line For Iswarkrupa at Vijapur Nagarpalika,Vijapur.
Excavation for Pipeline Trenches : Excavation for pipe
line trenches incl.all safety Provisions using site rails and
Stacking excavated stuff up to a lead of 90.oo mts Cleaning Rupees Four Hundred
1 11.00 the site etc. Completed for lifts and strata as Specified. Up to 427.80 Twenty Seven and Paise Cu.Mt
1,50 mt Depth (D) In hard rock and / or in C. C. 1:2:4 or Eighty Only
RCC with blasting, breaking, chiseling, or by
chiseling/breaking only
Excavation for Pipeline Trenches : Excavation for pipe
line trenches incl.all safety Provisions using site rails and Rupees One Hundred
2 60.00 Stacking excavated stuff up to a lead of 90.oo mts Cleaning 102.35 Two and Paise Thirty Cu.Mt
the site etc. Completed for lifts and strata as Specified. Up to Five Only
1,50 mt Depth (a) In all sorts of soil and soft murrum
RCC PIPE (Horizontally cast) Providing and Supplying ISI
standard R.C.C.Pipes (of Sulphate Resising Cement) in
Standard lengths of following class and diameter Suitable for
Either coller Joints or rubber ring joints including all taxes
Insurance Transportation Freight Charges octrol Inspection
Charges loading unloading convence to departmental stores Rupees Six Hundred
stacking etc Completed. Note : One Collar Should be Supplied Seventy Two Only
with each full length plain ended RCC pipe Cost included in
rates below One Rubber ring should with each full length
socketed pipe cost including rates. (D) Class NP -2 Test
Pressure 0.7 Kg/Sq.Mt (A) 300mm Dia
lowering ,laying and Jointing R.C.C. pipes in C.M 1:1 1/2 of
following diameter in proper position grade and Alignment Rupees One Hundred
4 100.00 as directed by Engineer in - charge including Conveyanve 136.85 Thirty Six and Paise R.Mt
from stores to site of work ,labour giving hydraulic testing as Eighty Five Only
per ISI code (A) 300mm Dia
Refilling of Pipeline trenches : Refilling the pipe line
Rupees Twenty Five and
5 61.00 trenches incl. ramming, watering Consolideting desposal of 25.30 Cu.Mt
surplus stuff as directed within a radius of 3 Km
Paise Thirty Only
Chamber for House Connection :Providing and constructing
rectangular brick masonry chamber for house connection as
per type design in brick masonry in C. M. 1:3 including M-
Rupees Seven Thousand
100 in foundation M-150 in benching inside plastering in C.
M. 1:3 and outside plastering in C. M. 1:3 coping in M200 and
7922.00 Nine Hundred Twenty NOS
fixing RCC precast manhole frame and covers, but Excl. Two Only
supply of manhole and cover etc. complete excl. excavation.
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 Crushed stone aggregates 40 mm nominal
size) and excluding cost of reinforcement in reinforced
concret for following grades, machine vibrated concrete Rupees Two Thousand
using graded hard stone aggregate of 40mm nominal size Seven Hundred Forty
obtained from quarry including mechanical mixing, Eight and Paise Eighty
mechanical vibrating, compaction, finishing, curing One Only
Completed as approved by the Architect and Engineer-in-
charge, in cement mortar in proportion recommended by the
manufacturer.., (A) Foundation and plinth.
Providing and Laying cement concrete 1:1.5:3 (1 Cement :1.5
Course sand :3 graded stone aggregate 20mm nominal size) Rupees Three Thousand
for C.C. road and curing. Finising the cement concrete road Nine Hundred Fifty Six
by trimix process inclusive of labour charges for trimix , and Paise Eighty Nine
surfece floater as per direction by engineer incharge and as Only
per Specification
B Fixing precast rubber dye inter locking concrete Block Buddhinagar at Vijapur Nagarpalika
Earthwork for embankment including breaking clods,
dressing with all lead and lift and including watering rolling
Rupees One Hundred
and consolidation of subgrade in layers at O.M.C. to required
dry density including filling the depression which occur
177.91 Seventy Seven and Paise Cu.Mt
during the process using power roller 8T to 10T.(E) From Ninety One Only
Borrow area within 3.0KM. lead
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 Crushed stone aggregates 40 mm nominal
size) and excluding cost of reinforcement in reinforced
concret for following grades, machined batched & machine
Rupees Two Thousand
vibrated concrete using graded hard (black trap) stone
Seven Hundred Forty
2 36.00 aggregate of 40mm nominal size obtained from quarry 2748.81 Cu.Mt
including mechanical mixing, mechanical vibrating, Eight and Paise Eighty
compaction, finishing, curing Completed as approved by the One Only
Architect and Engineer-in-charge, in cement mortar in
proportion recommended by the manufacturer.., (A)
Foundation and plinth.
Providingandfixingpre-castRubberDye/steelDye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated Rupees Six Hundred
3 360.00 mechanicallyandasperapproveddesignConfirmingto IS 699.84 Ninety Nine and Paise Sqmt.
15658 : 2006 including 35 mm Sand layer for levelling and Eighty Four Only
filling the joint with sand in proper line and level as
perguidlinesofIRC:SP63-2018etc.Complete
Providing and fixing pre-cast concrete kerb stone of gray
cement based concrete block 30cm length,30cm heightand
Rupees Three Hundred
15cm thick of M250 grade concret as per approved design
and including excavation for fixing in proper line and
374.92 Seventy Four and Paise Rmt.
level,filling the joint with C:M 1:3 (1cement:3fine sand) etc Ninety Two Only
Raising of I.C. Chamber av 0.180 mtrs Height with Brick
Masonary in C.M 1:6 at top including cost of excavation
Rupees Nine Hundred
refiting of frame & cover in C.C. 1:2:4, Plastring in C.M 1:3
5 3.00 922.12 Twenty Two and Paise Nos
curring % Disposal of Dismentaling Material from site etc.
Completed incl. all carting and providing of materials which Twelve Only
is required for the purpose (except frame and Cover)
C Construction For Slab Drain In Vimal Samashan Gruh To Narmada Pumping Station at Vijapur Nagarpalika
Excavation for foundation upto 1.5 m depth including sorting Rupees One Hundred
1 311.00 out and stacking of useful materials and disposing off the 122.99 Twenty Two and Paise Cu.Mt
excavated stuff upto 50 Meter lead.(A) Loose or soft soil Ninety Nine Only
Providing and laying cement concrete 1:3:6 (1-Cement : 3- Rupees Two Thousand
coarse sand : 6- hand broken stone aggregates 40 Nine Hundred Sixty Eight
mmnominal size) and curing complete excluding cost of and Paise Ninety One
formwork in (A) Foundation and Plinth Only
Providing and laying controlled cement concrete M.250 and Rupees Four Thousand
curing complete including the cost of formwork and Nine Hundred Ninety One
reinforcement for reinforced concrete work in (A) and Paise Twenty Nine
Foundations, footings, Base of columns and Mass concrete. Only
Providing and laying controlled cement concrete M.250 and
Rupees Five Thousand
curing complete including the cost of formwork and
4 32.00 5521.30 Five Hundred Twenty Cu.Mt
reinforcement for reinforced concrete work in (B) Walls,
from top of foundation level upto floor two level One and Paise Thirty Only
Providing and laying controlled cement concrete M.250 and
curing complete including the cost of formwork and Rupees Five Thousand
reinforcement for reinforced concrete work in (C)
Seven Hundred Ninety
5 36.00 Slabs,landing,shelves,Balconies, Lintels, Beams, Girders and 5794.07 Cu.Mt
Cantilever upto floor two level.
Four and Paise Seven
Providing TMT Bar FE 500D reinforcement for R.C.C. work Rupees Seventy Seven
6 6903.00 including bending, binding and placing in position complete 77.29 and Paise Twenty Nine kg
upto floor two level Only
Earthwork for embankment including breaking clods,
dressing with all lead and lift and including watering rolling
Rupees One Hundred
and consolidation of subgrade in layers at O.M.C. to required
7 90.00 177.91 Seventy Seven and Paise Cu.Mt
dry density including filling the depression which occur
during the process using power roller 8T to 10T.(E) From Ninety One Only
Borrow area within 3.0KM. lead
Clearing and grubbing road land including uprooting rank
Rupees Thirty Four
vegetation grass bushes,shrubs,sapling and trees girth up to
Thousand Eight Hundred
8 1.00 300 mm removal of stumps of trees cut earlier and disposal 34889.38 Hector
of unserviceable materials(D) By mechanical means in area
Eighty Nine and Paise
of thorny jungle Thirty Eight Only
D Construction work for C.C. Road DoshiVada At-Vijapur Nagarpalika
Demolition and disposal of unserviceable materials with all Rupees Six Hundred
1 399.00 lead and lift.(i) cement concrete. 622.36 Twenty Two and Paise Cu.Mt
Thirty Six Only
Box cutting the road surface to proper slope and camber for
making a base for road work including removing the
Rupees One Hundred
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead. Add Lead for 2.00 K.M
158.92 Fifty Eight and Paise Cu.Mt
(107.97+49.38 = 157.35) Lead Page no Item code -3.2.1.A (1) Ninety Two Only
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 Crushed stone aggregates 40 mm nominal
size) and excluding cost of reinforcement in reinforced
concret for following grades, machine vibrated concrete Rupees Two Thousand
using graded hard stone aggregate of 40mm nominal size Seven Hundred Forty
obtained from quarry including mechanical mixing, Eight and Paise Eighty
mechanical vibrating, compaction, finishing, curing One Only
Completed as approved by the Architect and Engineer-in-
charge, in cement mortar in proportion recommended by the
manufacturer.., (A) Foundation and plinth.
Providing and Laying cement concrete 1:1.5:3 (1 Cement :1.5
Course sand :3 graded stone aggregate 20mm nominal size)
for C.C. road and curing. Finising the cement concrete road
by trimix process inclusive of labour charges for trimix , Rupees Four Thousand
4 332.00 surfece floater, surface vibrator including channeling and 4603.29 Six Hundred Three and Cu.Mt
making grooves % rough finish to surface by providing Paise Twenty Nine Only
expansion joints, construction joint and Contraction joint
with fillings of joints with asphalt filler as per direction by
engineer incharge and as per Specification
Raising of I.C. Chamber av 0.180 mtrs Height with Brick
Masonary in C.M 1:6 at top including cost of excavation
refiting of frame & cover in C.C. 1:2:4, Plastring in C.M 1:3 Rupees Nine Hundred
5 25.00 curring % Disposal of Dismentaling Material from site etc. 922.12 Twenty Two and Paise Nos
Completed incl. all carting and providing of materials which Twelve Only
is required for the purpose (except frame and Cover)
E Construction for Compound Wall Narmada Pumping Station Near New Under Ground Sump And Pump Room Around at Vijapur
NagarpalikaExcavation
Vijapur for foundation upto 1.5 m depth including sorting
Rupees One Hundred
out and stacking of useful materials and disposing off the
1 165.00 122.99 Twenty Two and Paise Cu.Mt
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
Ninety Nine Only
Excavation for foundation for depth from 1.5 m to 3.0 m
Rupees One Hundred
including sorting out and stacking of useful materials and
2 22.00 136.33 Thirty Six and Paise Cu.Mt
disposing off the excavated stuff upto 50 Meter lead.(A)
Loose or soft soil Thirty Three Only
Filling available excavated earth (excluding rock) in
Rupees One Hundred
trenches, plinth, sides of foundations etc. in layers not
3 126.00 136.92 Thirty Six and Paise Cu.Mt
exceeding 20 cm. in depth consolidation each deposited
layer by ramming and watering. Ninety Two Only
Providing and laying cement concrete 1:3:6 (1-Cement : 3-
Rupees Three Thousand
coarse sand : 6- hand broken stone aggregates
4 17.00 3074.36 Seventy Four and Paise Cu.Mt
mmnominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth Thirty Six Only
Providing and laying cement concrete work 1:2:4 (1- Cement
: 2- Coarse sand : 4- graded stone aggregates 20 mm
Rupees Four Thousand
nominal size) and curing complete including cost of
formwork and excluding cost reinforcement for reinforced
4203.27 Two Hundred Three and Cu.Mt
concrete work in (A) Foundations, footings, Base or columns Paise Twenty Seven Only
and Mass concrete
Providing and laying cement concrete work 1:2:4 (1- Cement
: 2- Coarse sand : 4- graded stone aggregates 20 mm Rupees Six Thousand
nominal size) and curing complete including cost of Three Hundred Forty
formwork and excluding cost of reinforcement for reinforced Four and Paise Ninety
concrete work in (D) Columns, Pillars posts and struts upto Only
floor two level.
Providing and laying cement concrete work 1:2:4 (1- Cement
: 2- Coarse sand : 4- graded stone aggregates 20 mm
Rupees Five Thousand
nominal size) and curing complete including cost of
Seven Hundred Thirty
7 25.00 formwork and excluding reinforcement for reinforced 5730.85 Cu.Mt
concrete work in (B) Slabs, landing, shelves, Balconis , and Paise Eighty Five
Lintels, Beams, Girders and Cantilever upto floor two level. Only
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation
Rupees Three Thousand
and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)
Extra for brick work in superstructure above plinth level
3706.17 Seven Hundred Six and Cu.Mt
upto floor two level (B) Conventional(upto 10 Paise Seventeen Only
Providing and laying cement concrete 1:2:4 (1- Cement : 2-
Rupees Four Thousand
Coarse sand : 4- crushed stone aggregates 20 mm nominal
9 5.00 4292.02 Two Hundred Ninety Cu.Mt
size) and curing complete including cost of formwork in (A)
Wall Caps / Coping Two and Paise Two Only
Providing TMT Bar FE 500D reinforcement for R.C.C. work Rupees Seventy Seven
10 5985.00 including bending, binding and placing in position complete 77.29 and Paise Twenty Nine Kg
upto floor two level Only
20mm thick sand faced cement plaster on walls upto height
10 metres above ground level consisting of 12mm thick
Rupees Three Hundred
backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
321.10 Twenty One and Paise Sq.Mt
Finishing wall with weather proof exterior emulsion paint on
wall surface (two coats) to give an required shape even Rupees Seventy Three
12 886.00 shade after thoroughly brushing the surface to remove all 73.75 and Paise Seventy Five Sq.Mt
dirt, and remains of loose powdered materials.etc complete Only
Providing and fixing 1.20 Metre high fencing with 2.0 Metre
long M.S. Angle posts 40mm x 40 mm x6 mm and oil painting
3 coats fixed at 2.5 Mt,C/c. with five Horizontan lines and Rupees Three Hundred
13 200.00 two diagonals of galvanised steel barbed wire weighting 9.38 391.93 Ninety One and Paise rmt
Kg. per 100 Metre, strained and fixed to posts with Ninety Three Only
G.I,staples including fixing the postsin ground with 0.5 M x
0.5.M x 0.5 M. block inC.C1:5:10 etc complete.
Clearing and grubbing road land including uprooting rank
Rupees Twenty Eight
vegetation grass bushes,shrubs,sapling and trees girth up to
Thousand Four Hundred
14 1.00 300 mm removal of stumps of trees cut earlier and disposal 28455.09 Hector
of unserviceable materials (C) By mechanical means in area Fifty Five and Paise Nine
of light jungle Only
Providing and fixing M.S. grills of required pattern to wooden
frames of windows etc. with M.S. flats at required spacings Rupees One Hundred
15 438.00 and frame alround, square or round bars with round headed 162.95 Sixty Two and Paise Kg
bolts and nuts or by screws. (B) ORNAMENTAL GRILL (upto Ninety Five Only
F Fixing Pre-Cast Rubber Dye Inter Locking Concrete Block Mahabibi Fali Vijapur Nagarpalika,Vijapur
Demolition and disposal of unserviceable materials with all Rupees Six Hundred
1 38.00 lead and lift.(i) cement concrete. 622.36 Twenty Two and Paise Cu.Mt
Thirty Six Only
Box cutting the road surface to proper slope and camber for
making a base for road work including removing the
Rupees One Hundred
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead. Add Lead for 2.00 K.M
158.92 Fifty Eight and Paise Cu.Mt
(107.97+49.38 = 157.35) Lead Page no Item code -3.2.1.A (1) Ninety Two Only
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 Crushed stone aggregates 40 mm nominal
size) and excluding cost of reinforcement in reinforced
concret for following grades, machine vibrated concrete Rupees Two Thousand
using graded hard stone aggregate of 40mm nominal size Seven Hundred Forty
obtained from quarry including mechanical mixing, Eight and Paise Eighty
mechanical vibrating, compaction, finishing, curing One Only
Completed as approved by the Architect and Engineer-in-
charge, in cement mortar in proportion recommended by the
manufacturer.., (A) Foundation and plinth.
Providingandfixingpre-castRubberDye/steelDye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated Rupees Six Hundred
4 375.00 mechanicallyandasperapproveddesignConfirmingto IS 699.84 Ninety Nine and Paise Sqmt.
15658 : 2006 including 35 mm Sand layer for levelling and Eighty Four Only
filling the joint with sand in proper line and level as
perguidlinesofIRC:SP63-2018etc.Complete
Providing and fixing pre-cast concrete kerb stone of gray
cement based concrete block 30cm length,30cm heightand
Rupees Three Hundred
15cm thick of M250 grade concret as per approved design
and including excavation for fixing in proper line and
374.92 Seventy Four and Paise Rmt.
level,filling the joint with C:M 1:3 (1cement:3fine sand) etc Ninety Two Only
Raising of I.C. Chamber av 0.180 mtrs Height with Brick
Masonary in C.M 1:6 at top including cost of excavation
refiting of frame & cover in C.C. 1:2:4, Plastring in C.M 1:3 Rupees Nine Hundred
6 10.00 curring % Disposal of Dismentaling Material from site etc. 922.12 Twenty Two and Paise Nos
Completed incl. all carting and providing of materials which Twelve Only
is required for the purpose (except frame and Cover)
G Construction work for C.C. Road & Percolating Well Raval Vaas At-Vijapur Nagarpalika,Vijapur
Demolition and disposal of unserviceable materials with all Rupees Six Hundred
1 209.00 lead and lift.(i) cement concrete. 622.36 Twenty Two and Paise Cu.Mt
Thirty Six Only
Box cutting the road surface to proper slope and camber for
making a base for road work including removing the
Rupees One Hundred
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead. Add Lead for 2.00 K.M
158.92 Fifty Eight and Paise Cu.Mt
(107.97+49.38 = 157.35) Lead Page no Item code -3.2.1.A (1) Ninety Two Only
Providing & laying cement concrete 1:4:8 (1 cement :
coarse sand : 8 Crushed stone aggregates 40 mm nominal
size) and excluding cost of reinforcement in reinforced
concret for following grades, machine vibrated concrete Rupees Two Thousand
using graded hard stone aggregate of 40mm nominal size Seven Hundred Forty
obtained from quarry including mechanical mixing, Eight and Paise Eighty
mechanical vibrating, compaction, finishing, curing One Only
Completed as approved by the Architect and Engineer-in-
charge, in cement mortar in proportion recommended by the
manufacturer.., (A) Foundation and plinth.
Providing and Laying cement concrete 1:1.5:3 (1 Cement :1.5
Course sand :3 graded stone aggregate 20mm nominal size)
for C.C. road and curing. Finising the cement concrete road
by trimix process inclusive of labour charges for trimix , Rupees Four Thousand
4 174.00 surfece floater, surface vibrator including channeling and 4603.29 Six Hundred Three and Cu.Mt
making grooves % rough finish to surface by providing Paise Twenty Nine Only
expansion joints, construction joint and Contraction joint
with fillings of joints with asphalt filler as per direction by
engineer incharge and as per Specification
Raising of I.C. Chamber av 0.180 mtrs Height with Brick
Masonary in C.M 1:6 at top including cost of excavation
refiting of frame & cover in C.C. 1:2:4, Plastring in C.M 1:3 Rupees Nine Hundred
5 15.00 curring % Disposal of Dismentaling Material from site etc. 922.12 Twenty Two and Paise Nos
Completed incl. all carting and providing of materials which Twelve Only
is required for the purpose (except frame and Cover)
Excavation for foundation upto 1.5 m depth including
Rupees One Hundred
sorting out and stacking of useful materials and
6 29.00 122.99 Twenty Two and Paise Cu.Mt
disposing off the excavated stuff upto 50 Meter lead.(A)
Ninety Nine Only
Loose or soft soil
Providing and supplying in standard length ISI mark
rigid unplasticised PVC pipes suitable for potable water
with ringfit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
the departmental stores and including cost of jointing
Rupees One Hundred
7 50.00 meterial etc. complete.One coupler / ring shall be 199.00 R.Mt
Ninety Nine Only
provided with each full length pipe cost of which is
included in rates below.3% (Three percent) Discounted
rate tobe consider for Coupler jointed pipe.Rate for PVC
Resin as Rs.134700/M.T.(Price Without GST)
PVC PIPES 6 kg/ sq.cm 110 mm dia 6 Kg/cm2 PVC Pipe.
Providing and supplying in standard length ISI mark
rigid unplasticised PVC pipes suitable for potable water
with ringfit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
the departmental stores and including cost of jointing
Rupees Four Hundred
8 40.00 meterial etc. complete.One coupler / ring shall be 420.00 R.Mt
provided with each full length pipe cost of which is
included in rates below.3% (Three percent) Discounted
rate tobe consider for Coupler jointed pipe.Rate for PVC
Resin as Rs.134700/M.T.(Price Without GST)
PVC PIPES 6 kg/ sq.cm 160 mm dia 6 Kg/cm2 PVC Pipe.
Providing and Construction of Junction chamber of size
Rupees One Thousand
X 0.35 X 0.60 mt,including connecting rainwater pipes as per
9 5.00 1050.72 Fifty and Paise Seventy Nos
detailed dwaing and as directed by Engineer in charge.
Providing and Constructing filter chamber of size 2.06X
1.21X 1.20 mt, as directed including connection rainwater Rupees Ten Thousand
10 2.00 pipes as per detailed as directed by Engineer in charge. 10457.54 Four Hundred Fifty Seven Nos
and Paise Fifty Four Only
Providing water harvesting pit of 2.00mtX2.00mtX4.00mt.
Size for water logging with excavation in any strata upto four
meter depth,filling the pit with B.T.metal 40mm in 0.60 mt. Rupees Sixty Thousand
depth with 25-40mm kapchi,0.30 mt. depth and 2.0mt. Eight Hundred Twenty
Depth with coarse sand in layers including making coarse Nine and Paise Eleven
sand in layers including making P.V.C. line for water inlet etc. Only
as directed with 250mm dia P.V.C. pipe of 10kg.f/Cm2 casing
with gravel packing or as directed
TOTAL AMOUNT PUT TO TENDER Rs…………
TOTAL AMOUNT PUT TO TENDER Rs…………
Estimated amount Estimated amount
Put to tender Rs …8236826.00 Put to tender Rs…8236826.00
Deduct .............% below Rs………… Add............% above Rs……………
Total Rs………… Total Rs……………
(*Please strike out whichever is not applicable).
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture,
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
The Chief Officer
Vijapur Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 ONLINE_TENDER NOTICE.pdf
2 Standard Bidding Document.pdf
3.BUILDINGSPECIFICATIONSBOOK.pdf
4 Material spesification.pdf
5 All GR.pdf
6 ROAD WORKS SPECIFICATIONS.pdf
7.SCHEDULE - B.pdf
Download all tender documents and submit your bid