Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.5 LAccepted-AOC | 1 | Accepted-AOC BEING L1 BIDDER.ACCEPTED | |
| 2 | 2₹13.8 L+₹50,020.78 (3.76%)Rejected-AOC | 2 | Rejected-AOC BEING L2 BIDDER.REJECTED |
| Sl No | Description | Qty | Unit | S P thomas L2 | P V BABYCHAN L1 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 97.15 | cum | 833.2 ₹80,942.05 | 802.97 ₹78,005.32 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 158.75 | cum | 283.37 ₹44,984.14 | 273.09 ₹43,352.22 Lowest |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 58.29 | cum | 1,886.97 ₹1,09,987.71 | 1,818.51 ₹1,05,997.31 Lowest |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 101.97 | cum | 4,392.41 ₹4,47,880.87 | 4,233.07 ₹4,31,633.45 Lowest |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 76.12 | cum | 3,263.61 ₹2,48,419.47 | 3,145.22 ₹2,39,407.86 Lowest |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 17.22 | cum | 10,735.93 ₹1,84,904.92 | 10,346.47 ₹1,78,197.25 Lowest |
| 1.01 | 5.9.15:Centering and shuttering including strutting, etc. and removal of form for:Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | 92.91 | sqm | 424.74 ₹39,462.59 | 409.33 ₹38,030.85 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,463.95 | kilogram | 123.66 ₹1,81,032.68 | 119.18 ₹1,74,474.16 Lowest |
| 1.01 | OD26284/2025-2026:Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 14.94 | cum | 1,000.44 ₹14,946.57 | 964.14 ₹14,404.25 Lowest |
Tender Value
₹12.5 L
EMD Value
₹31,352
Closing Date
24 Sept 2025, 5:30 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer M I Subdivision Aluva
Reconstruction of side protection wall
2025_Irrig_798925_1
IRR/IA/TR/5973/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Kadungallur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹31,352
29 Oct 2025
18 Sept 2025
25 Sept 2025
18 Sept 2025
24 Sept 2025
18 Sept 2025
18 Sept 2025 - 24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1324672.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .