Loading…
Loading…
Tender Value
₹3.6 L
EMD Value
₹3,561
Closing Date
17 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Kutiyana Nagarpalika
CONSTRUCTION OF PIPE CULVERT AT MODARIYA DUNGAR VADI AREA IN KUTIYANA NAGARPALIKA. DIST. PORBANDAR
292482
KutiyanaNP/PipeCulvert/T44/4-R00
Open
Civil - All
Porbandar
3 documents required · 3 mandatory
₹600
Chief Officer, Kutiyana Nagarpalika, Kutiyana
₹3,561
2 Apr 2026
2 Apr 2026
2 Apr 2026
17 Apr 2026
2 Apr 2026
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-B at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be written in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender :
SCHEDULE NAME OF WORK AMOUNT
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for
under all conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design
then the difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as
mentioned in tender. However no extra payment shall be made for use of additional Quantity of cement as per actual
concrete mix design. Concrete mix design shall be done in GERI laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification
and details of work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for
testing shall be paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be
recovered from the running account bills of the works. (As per G.R. (R&B) Dept.., No. TNC/1085/4/C Dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS".
In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other
construction workers regulation of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) GST Will Be Paid Extra as actual Bill Amount.
Signature of contractor Kutiyana Nagarpalika
KUTIYANA NAGARPALIKA
KUTIYANA, DIST. PORBANDAR
Name of Project: CONSTRUCTION OF PIPE CULVERT AT MODARIYA DUNGAR VADI AREA IN KUTIYANA
NAGARPALIKA. DIST. PORBANDAR
SCHEDULE - "B-1"
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A) Rupees One Hundred Twenty
9.12 Loose or soft soil 128.79 Eight and Seventy Nine Paise Cum
2 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (B)
Rupees One Hundred Sixty
Dense or Hard soil
19.68 164.82 Four and Eighty Two Paise Cum
3 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(E)
Rupees Six Hundred Fifty
9.60 657.36 Seven and Thirty Six Paise Cum
4 Providing and laying cement concrete 1:3:6 (1 Cement :
3- coarse sand :6- Hand broken stone aggregate
Rupees Three Thousand One
mm. Nominal size) and curing complete excluding cost
Hundred Eighteen and Seven
of form work in :(a) Foundation and plinth
33.92 3118.07 Paise Cum
5 Filling in foundation and plinth with murrum or selected
soil in layers of 20 cm thickness including watering,
ramming and consolidating etc. complete. Rupees Three Hundred Seven
7.84 307.41 and Forty One Paise Cum
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
6 Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts including setting
and joining the pipes in C.M. 1:2 watering and laying
(To level of slops of I.S. 458 / 1971 Class NP3 casted by Rupees Two Thousand One
vertically vibrated technology of following internal Hundred Eight and Eighty Six
56.00 diameter. (iv) 600 mm dia. 2108.86 Paise RMT
7 Providing and casting in situ controlled cement concrete
M-200 for average 150 mm thick wearing coat laid as
directed dincluding tamping, vibrating, finishing, curing
and fillingin joints with bitumen Rupees Five Thousand Three
complete Hundred Thirty Nine and
10.80 5339.93 Ninety Three Paise m3
8 Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (B) Walls,
Rupees Seven Thousand Nine
from top of foundation level upto floor two level
Hundred Seventy Two and
4.00 7972.94 Ninety Four Paise MT
9 Providing and laying in position FE 500/500D TMT bar
reinforcement including cutting, bending, hooking and
tying complete as per detailed drawings for the
Rupees Seventy Three
following.(A) RCC Kerb (B) RCC Footpath (C) R.C.C.
Thousand Eight Hundred Fifty
Approch slab (D) Wearing Coat
0.40 73858.69 Eight and Sixty Nine Paise MT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. Mile Stone Dates and Tender Nivida.pdf
6. Specification Index.pdf
4. TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
5. Details of Work.pdf
7. Qualification Criteria.pdf
1. SBD.pdf
3. Schedule-B.pdf
8. CIVIL SPECIFICATIONS.pdf
D - ELECTRIC SPECIFICATION.pdf
9. Vendor Civil work.pdf
B - ROAD WORK SPECIFICATIONS.pdf
C - LED light Specification.pdf
A - BUILDING SPECIFICATIONS.pdf
Download all tender documents and submit your bid