| 1 | L1₹31.5 LAccepted-AOC KANNUR | KERALA | 670001 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹32.0 L+₹3.0 L (10.4%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹32.6 L+₹3.5 L (12.2%)Rejected-AOC | L3 | Rejected-AOC Third lowest |
Tender Value
₹30.5 L
EMD Value
₹50,000
Closing Date
16 Jan 2023, 6:00 pmClosed
Executive Engineer
The Executive Engineer, IN Division, Kannur 2
Canal bund road
2022_Irrig_545451_1
IRR/KP/TR/5230/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Edachery
Please refer tender documents
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
23 Mar 2023
4 Jan 2023
23 Jan 2023
4 Jan 2023
16 Jan 2023
4 Jan 2023
Amount
bund road
3.19.2:Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
3.18:Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4.1.B.3:Granular Sub-Base with Close Graded Material (Table:- 400-1):- By Mix in Place Method - For Grading - III Material Construction of granular sub-base by providing close graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD10462/2022-2023:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD18686/2022-2023:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD10418/2022-2023:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata bellow bed level including cost conveyance labour charges etc complete.
OD10419/2022-2023:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata(soft to medium clay soil) including all hire charges and labour for fixing and other appliances necessary for pile driving after pointing the bottom end. details for one post of 6m long and 15 numbers per day
9.1:Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days
9.2.A:Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first-class bedding of granular material in a single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in headwalls and parapets. 1000 mm dia
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
M MOHAMMADKUNHI
K V RAMAKRISHNAN
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
M MOHAMMADKUNHI
K V RAMAKRISHNAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_797999.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .