Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.8 L+₹1.3 L (48.4%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹3.8 L+₹1.3 L (48.4%) | L2 | Rejected-Finance As Per TCR |
| 3 | L3₹3.9 L+₹1.3 L (49.4%)Rejected-Finance | ₹3.9 L+₹1.3 L (49.4%) | L3 | Rejected-Finance As Per TCR |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per NIT. |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per NIT. |
| Sl No | Description | Qty | Unit | CENTRAL ENGINEERS L2 | M/S PATEL ENTERPRISES L3 | ANIKET BHARDWAJ L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of DGE copper strip with DGE H class insulation. A)Cost of copper strip DGC(SWG-6) 5.005 KG B) Cost of moldings of Class 'H' insulation DGE with as required | 60 | Nos. | 6,000 ₹3,60,000 | 6,827 ₹4,09,620 | 5,530 ₹3,31,800 Lowest |
| 2.00 | Cost of terminal connecting lead | 9 | Mtrs. | 11,000 ₹99,000 | 1,149 ₹10,341 | 910 ₹8,190 Lowest |
| 3.00 | Cost of insulating material | 1 | No. | 52,000 ₹52,000 | 61,453 ₹61,453 | 38,600 ₹38,600 Lowest |
| 4.00 | Cost of Labour charge | 1 | No. | 30,000 ₹30,000 Lowest | 48,149 ₹48,149 | 39,500 ₹39,500 |
| 5.00 | Less scrap value(60% of cost of SE copper wire) | 1 | No. | 2,16,000 ₹-2,16,000 | 2,02,455 ₹-2,02,455 | 1,99,080 ₹-1,99,080 Lowest |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
2 May 2026, 9:00 amClosed
Project Engineer EnM Bhurkunda Colliery
Office Of Project Engineer EnM Bhurkunda Colliery
Repairing and rewinding of 260KW, 3.3KV, 3phase, 1486 RPM sq. cage induction motor was running under Bhurkunda Colliery.
2026_CCL_358561_1
PE(EnM)/BHK/e Tender/26-27/02
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Office Of Project Engineer EnM Bhurkunda Colliery
Please refer tender documents.
2 documents required · 2 mandatory
₹4,500
18 Jun 2026
21 Apr 2026
4 May 2026
22 Apr 2026
2 May 2026
22 Apr 2026
22 Apr 2026 - 27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of DGE copper strip with DGE H class insulation. A)Cost of copper strip DGC(SWG-6) 5.005 KG B) Cost of moldings of Class 'H' insulation DGE with as required | - | Nos. | - | - |
| 2 | Cost of terminal connecting lead | - | Mtrs. | - | - |
| 3 | Cost of insulating material | - | No. | - | - |
| 4 | Cost of Labour charge | - | No. | - | - |
| 5 | Less scrap value(60% of cost of SE copper wire) | - | No. | - | - |
| 6 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_371433.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .