| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC KARUR | ₹36.4 L | L1 | Accepted-AOC Below Est rate |
| 2 | L2₹36.9 LRejected-Finance KARUR | ₹36.9 L | L2 | Rejected-Finance Above Est Rate |
| Sl No | Description | Qty | Unit | Sri Navaladiyar And Co L1 | SPE CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Sanjai Nagar I street to 6th street 0/0 - 1/500 ( R-637) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 466.2 | Sqm | 6 ₹2,797.20 | 6 ₹2,797.20 |
| 3.00 | Picking 5 cm to 10cm old metalled surface and sectioning 1 sqm | 942.71 | Cum | 23 ₹21,682.33 | 24 ₹22,625.04 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 353.51 | Cum | 2,442 ₹8.6 L | 2,474 ₹8.7 L |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 2,828.14 | Sqm | 88 ₹2.5 L | 89 ₹2.5 L |
| 6.00 | providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 2,828.14 | Sqm | 21 ₹59,390.94 | 21 ₹59,390.94 |
| 7.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 2,059.39 | Sqm | 35 ₹72,078.65 | 35 ₹72,078.65 |
| 8.00 | Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 122.2 | cum | 11,578 ₹14.1 L | 11,731 ₹14.3 L |
| 9.00 | Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface | 252 | Sqm | 888 ₹2.2 L | 900 ₹2.3 L |
| 10.00Upgradation of the road from Amman City 0/0 - 0/0450( R-639) | |||||
Tender Value
₹37.5 L
EMD Value
₹38,000
Closing Date
23 Feb 2026, 3:00 pmClosed
District Collector/Chairman
DRDA, Collectorate, Karur
1.Strengthening sanjai nagar 1st to 6th cross street R637 2.Upgradation of the road from Amman city Km 0/0-0/045 (R639)
2026_RDTN_658183_16
A6/0514/2026
Open Tender
Civil Works - Roads
180 days
DRDA, Collectorate
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹38,000
DRDA, Collectorate, Karur
10 Apr 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
23 Feb 2026
18 Feb 2026
17 Feb 2026
Strengthening of the road from Sanjai Nagar I street to 6th street 0/0 - 1/500 ( R-637)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10cm old metalled surface and sectioning 1 sqm
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Upgradation of the road from Amman City 0/0 - 0/0450( R-639)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for Road Stud with Lens Reflector
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_789679.pdf
techsummary_789679.pdf
finance_789679.pdf
BOQ Comparative Chart
xlsx
finsummary_789679.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
10Pricebid.pdf
Additional Documents • 0.80 MB
BOQ_789679.xls
BOQ • 0.24 MB
10Technicalbid.pdf
Tender Documents • 2.59 MB
Download all tender documents and submit your bid