Executive Engineer Panchayat R&B Division Devbhumi Dwarka.
Request for proposals for project management consultant services including construction supervision services for all infrastructure work of various grant under district panchayat, Devbhumi Dwaraka. (Third Attempt)
311111
06/2026-27
Open
Civil Works
Devbhumi Dwarka
7 documents required · 7 mandatory
₹1,800
Executive Engineer Panchayat R&B Division Devbhumi Dwarka.
₹1 L
4 Jun 2026
4 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
Name of Work: Request for Proposals for Project Management Consultant
Services Including Construction Supervision Services for All
Infrastructure Work of Various Grant Under District
Panchayat, DEVBHUMI DWARAKA.
TENDER DOCUMENT
LastDateofdownloadingof
11/06/2026upto18:00hrs
Date & Time of Physical
within 7 days from the last date of
SubmissionofDocument
12/06/2026@ExecutiveEngineerRoad and
DateofopeningofTender Building Panchayat Devbhumi Dwaraka
Division, Devbhumi Dwaraka
EXECUTIVEENGINEER
ROADANDBUILDINGPANCHAYATDEVBHUMI
DWARAKADIVSION DIST: -DEVBHUMI DWARAKA
Nameof Work: REQUEST FOR PROPOSALS FOR PROJECT
MANAGEMENT CONSULTANT SERVICES INCLUDING
CONSTRUCTION SUPERVISION SERVICES FOR ALL
INFRASTRUCTURE WORK OF VARIOUS GRANT UNDER
DISTRICT PANCHAYAT, DEVBHUMI DWARAKA.
EXECUTIVEENGINEER
ROADANDBUILDINGDEPARTMENT,PANCHAYAT DEVBHUMI
DWARAKADIVISION DEVBHUMI DWARAKA.
1. TenderfeesRs.1,800/-informofD.D.
2. Earnest money deposit is Rs. 1,00,000/- in form of D.D./FDR in the Name of
ExecutiveEngineerRoadandBuildingDepartmentPanchayatpayableatDevbhumi
Dwaraka of any Scheduledbank.
3. LastdateofTenderDocumentreceivedondated//2026byR.P.A.D.orspeed post only.
4. Executive Engineer Road and Building Department Panchayat reserves all the
rights to approve/reject any or all tender without giving any reason thereof.
5. For any information/ detail contact Road and Building Panchayat DEVBHUMI
DWARAKADivision Construction department in office time.
ANNEXURE–IINOTICEINVITINGON-LINETENDER
DepartmentName :- RoadandBuildingDépartementPanchayat
Devbhumi Dwaraka Division, DEVBHUMI
IFBNo./TenderNoticeNo. :- 06/2026-27
Request for proposals for project
NameofProject :- management consultant services including
construction supervision services for all
infrastructure work of various grant under
district panchayat, Devbhumi Dwaraka. (Third
Request for proposals for project
management consultant services including
NameofWork :- construction supervision services for all
infrastructure work of various grant under
district panchayat, Devbhumi Dwaraka.(Third
EstimatedContractValue(INR) :- Rs.--
PeriodofCompletion(inYears) :- 03Yearsafter issuance of work order to
consultant (Time limit may be extended if
required based on mutual consent)
BiddingType :- Open
BidCall (Nos) :- One (1)
TenderCurrencyType :- Single
TenderCurrencySettings :- IndianRupee(INR)
JointVenture :- NotApplicable
Rebate :- NotApplicable
BidDocumentFee :- 1,800/-
BidDocumentFeePayableto :- Demand Draft in favour of
ExecutiveEngineer,RoadandBuilding
Department Panchayat Devbhumi Dwaraka
BidSecurity/EMD(INR) :- Rs.1,00,000.00 in form of DD/FDR/BG in
favour of Executive Engineer,
RoadandBuilding Department Panchayat
Devbhumi Dwaraka Division.
BidSecurity/EMDinfavourof :- EXECUTIVE ENGINEER, Road and Building
Department Panchayat Devbhumi Dwaraka
StartDateofTender Receive 04/06/2026 Hrs 12:00
EndDateofTender Receive 11/06/2026,Hrs.18:00
LastDate&TimeforPhysical within 7 days from the last date of tender opening
BidValidityPeriod :- 120daysafteropeningofpricebid
Technical Presentation cum interview :- Date: 12/06/2026 At 12:00 hrs at
District PanchayatDevbhumi Dwaraka
1. EMD (FDR) shall be scanned & upload
along with Technical Documents.
2. E.M.D. and Other Physical Documents
Remarks :- Submissionshall be sent through R.P.A.D. or
SpeedPosttoreachtoEXECUTIVEENGINEER,
Road and Building Department Panchayat
Devbhumi Dwaraka Division, Dist.:Devbhumi
Dwarakawithin upto 18:00 during office
Executive Engineer, Road and Building
OfficerInvitingBids :- DepartmentPanchayatDevbhumi
DwarakaDivision,
Dist.:Devbhumi Dwaraka
R&B Panchayat Division, District
Address :- PanchayatDevbhumi Dwaraka.
ContactDetails :-
**OtherTerms&Conditionsasperdetailedtenderdocument
Bidderhave to submit Tender Fee in form of Demand Draft has to be issued by any
nationalized bank or as per list mentioned in GR of Finance Department, GR No. FD GR.
No.: FD/MSM/e-file/4/2023/4020/D.M.O Dt. 11/03/2024 ,and Earnest Money Deposit in
form of FDR/BG and other valid documentsasmentioned above in electronic format only
through online (by scanning)
whileuploadingthebidandsamedocumentsinPhysicalcopywhilesubmittinginphysical
submission. Accordingly, after of those shall be opened whose Tender Fee and EMD is
received in physical form. For the purpose of realization of DD or FDR bidder shall send
the Original through R.P.A.D./ speed post in Physical form so as to reach the office on
dateshown aboveduringofficehoursat RoadandBuildingPanchayatDevbhumi Dwaraka
Division Dist.Devbhumi Dwarakaonly.TenderFee,EMDandothervalid
documentsreceivedearlyorlater then stipulated time will not accepted in any case and the
bid of that bidder shall be considered non responsive. Any document in supporting of bid
shall be submitted in electronic format only through on line by scanning and hard copy
will not be accepted separately.
The Broad Scope of work includes:
1. District Panchayat, Devbhumi Dwarakarequirestheservicesofsuitablyqualified and registered
domestic Consulting Firms/Agencies/Companies to provide Consultancy
servicesforcarryingoutfeasibilitystudies,preparationofDetailedProjectReportsand Bid Documentation
for providing in infrastructure project consultancy services to selected Project of District panchayat,
Devbhumi Dwaraka. The scope of work includes Preparation of DPR, Bid document for bid process
management, project management, Construction Supervision and Inspection for all infrastructure
work of various grant under District Panchayat, Devbhumi Dwaraka Including preparation of
Feasibility Report to Describe Existing Facility in village & to provide proposed infrastructure
facilities in village like (1) Potable water distribution scheme with allied infrastructure and house
hold connections.(2) Drainage scheme for disposal of Dry/wet sewage . (3) Sewage treatment plant
(4) Main village road passing through the village market (R.C.C. road) (5) E – library with internet
facilities (6) Play ground (With accompanied facilities for the sports of Box cricket, Pickle ball,
jogging track, volley ball, etc.) (7) Internal R.C.C. roads of village (8) Walkway with plantation
around village pond (9) Street lights and C.C.T.V. camera (10) Public toilets (11) Public garden (12)
Community hall (13) E- gram center.(14) Atalwadi (15) Any Other , etc. complete. Including
preparing presentation for the above DPR to the concerned authority and approval of the DPR from
the concerned authority.
2. Prepare design brief and DPR based on discussions with District Level Committee, along with
conceptualization of the Village Development Plan.
3. Carry out all the investigations and surveys that may be required for the said project (from
planning, detailed design to the implementation stage) which includes SBC data, contour sheet of
the entire area, topographical layout etc.
4. Procure all clearances that may be required for the project implementation. The Authority shall
bear all the statutory fee for this purpose.
5. Undertake Comprehensive Architectural Consultancy including detailed drawings, preparation of
BOQ and estimates, assistance in tendering towards selection of Contractors and Agencies.
6. Preparation of detailed design and drawings towards structure design, landscaping, services
Including but not limited to mechanical, electrical, plumbing, and fire safety.
7. Undertake day-to-day Project supervision during the implementation period.
8. Performance Security:
(A) Consultant has to provide performance security of 10% of quoted professional fees of Total
accepted value of consultancy contract for each work/Package and to be paid to concern Executive
Engineer as follows:
1) 2.5 % of the total accepted fees in the form of Bank Guarantee (BG) while signing the contract. 2)
2.5 % of the total accepted fees in the form of BG within two months from the date of actual start
of the services after full mobilization.
3) 5.0 % of the total accepted fees on completion of 50 % time of services (i.e. one year from the
award of services).
9. Bid Security (EMD):
Consultant has to furnish, as part of its proposal, Bid Security/Earnest Money Deposit amounting
to Rs. 1,00,000.00/- Lump Sum for the work
The Bid Security (EMD) shall be given in favor of Executive Engineer, Panchayat Road And
Building Division, Devbhumi Dwaraka for the valid period of not less than 180(One hundred eighty)
days and shall be in any one of the following form:
The full amount of Earnest money deposit shall be in the form of Fixed deposit receipt
Cheque shall not be accepted.
The Earnest Money Deposit shall be valid for a period of not less than one hundred eighty
(180) days from the last date of online submission of Tender in the first instance. The same
may be extended by the bidders for a further period of one hundred eighty (180) days, if
required by District Panchayat, Devbhumi Dwaraka. Tenders without submission of Earnest
Money Deposit shall be rejected as nonresponsive. If during Tender validity period, the
bidder withdraws his Tender, the Earnest Money Deposit shall be forfeited and the bidder
will be disqualified from tendering for further works of SSNNL for one year from date of
withdrawal of his proposal.
The Earnest Money Deposit will be returned promptly to the unsuccessful bidders except top
three ranked bidders. The Earnest Money Deposit will be returned to these bidders after first
ranked bidder furnishes Security Deposit 38 | P a g e for performance and duly enters into
Within Ten (10) days from the date of issue of the letter and acceptance of Tender by the
bidder, the successful bidder shall furnish the required Security Deposit for performance
with the condition of the Contract and attend the office of the Engineer – In – Charge for
execution of the Contract documents. If agency fails to furnish the Security Deposit for
performance or to execute the Contract for the work offered to him, his EMD shall be
forfeited and the bidder may be disqualified from tendering for further works.
10. The services required to be provided by the Consultant towards the projects is more particularly set
out in Annexure-A. The Consultant shall provide the required deliverables specified in This
Agreement in conformity with the time schedule and payment schedule stated therein Part- II of
12.1 Any sum falling due or any loss caused due to this agreement shallbe
recoverablebytheclientfromtheconsultant’ssecuritydepositand consultancy fees.
12.2 The consultant shall be liable for defects, discrepancies and disorders etc. in preparing cost
12.3 TheConsultantsshallbe liableforarithmetical calculationsincostestimates & DPR, All plans,
drawings, specifications, design, reports other document and software prepared by the consultant
for the client under this agreement shall become and remain the property of the client. The
Consultant shall, not later than upon termination or expiration of this agreement, delivery all such
document etc. to the Client, together with a detailed inventory thereof.
Restrictionsaboutthefutureuseofthesedocumentsandsoftware,ifany, shall be specified
12.4 The consultants, their sub-consultants and the personnel of either
duringthetermorwithintwo(2)yearsaftertheexpirationofthis agreement,disclose
anyproprietaryorconfidentialinformationrelatingto theproject,theservices, this agreement or the
Client’s business or operations without the prior written consent of the Client.
12. Settlement Of Disputes:
12.1 AmicableSettlement:The parties shall use their best efforts to settle amicably all disputes arising
out of or in connection with this agreement or the interpretation thereof.
12.2 Dispute Settlement: Any dispute between the parties as to matters
arisingpursuanttothisagreementwhichcannotbesettledamicably withinthirty(30) days after receipt
by one party of the other party’s
requestforsuchamicablesettlementmaybesubmittedbyeitherpartyfor settlement in accordance with
the provisions specified in the document to the Client=(DistrictPanchayat-Devbhumi Dwaraka
,(P)R&Bdivision-Devbhumi Dwaraka),Devbhumi Dwarakaand
hisdecisionshallbefinalandbindingtobothparties.
12.3 Jurisdiction: The contract has been entered into the State of Gujaratand its validity, construction,
interpretation and legal effect shall be the exclusive jurisdiction of the courts in concerned district
or of the courts at the place where this agreement entered into. No other jurisdiction shall be
13. TAXES AND DUTIES:
The consultants and the personnel shall pay the taxes, duties; fees, levies and other
impositionsleviedunder the existing,amended or enacted laws during life of this agreement
and the Client shall perform such duties in regard to the deduction of such tax as may be
lawfully imposed.
14. SPECIAL CONDITIONS:
14.1 If Consultant fails to complete work within stipulated time limit, the Consultant
will be terminated and the deposit shall be forfeited.
14.2 AllapplicableGovt.andLocal taxesshallbeborneby thecontractor. Alltherates shall be
including of all the prevailing taxes including GST.
14.3 Being unit rate tender, the quantity/amount of work is uncertain. Any Objection
regarding the same will not be entertained from consultants.
14.4 Theconsultantshallcarryoutonlythatactivity/activitieswhichis/areassignedtohim by
respective Engineer / Officer in charge on behalf of District Panchayat Devbhumi
ANNEXURE-A: SERVICES
The detailed scope of work is as below.
A . Services as an Architect cum Consultant
Stage A.1: Concept Design
1. Ascertain requirements, examine site constraints & potential, and prepare a design brief after
verification of land records and availability, suitability for the project after considering existing
bylaws & prevalent regulations for Authority's approval.
2. Review of the projects identified by the Authority (if applicable) and ascertain the feasibility of the
same based on local studies and surveys, along with identification of further projects for holistic
development of the area.
3. Prepare a site evaluation report, along with state of existing buildings and Infrastructure, and
analysis and impact of existing and/or proposed development on its immediate environs, both
positive and negative. The Site evaluation should be backed by detailed site study, and due
diligence, including but not limited to verification of the Site suitability to the proposed project,
land ownership, dimensions, areas available for implementation of project.
4. The Consultant shall check & verify the land details, suitability & user rights available with the
Authority, conditions of utilization of the land parcel, and requirement of any particular/special
permission towards the utilization of the land for the purpose of the project, and report the same to
the Authority promptly.
5. Identify and undertake all studies, surveys and investigations required for the project, including but
not limited to topographical surveys, contour surveys, bathymetric surveys, soil bearing capacity,
structural analysis of the existing structures (if any), etc. The cost of all surveys and investigations
shall be borne by the Consultant.
6. Identify all stakeholders associated with the project to understand their roles devise strategies to
systematically engage them through all stages of the project.
7. Identification of all statutory clearances required for the project,
8. Prepare conceptual designs with reference to requirements given and prepare rough estimate of
cost on area basis and submit the same for the feedback of the Authority.
Stage A.2: Preliminary Design and Drawings
1. Modify the conceptual design incorporating required changes and prepare the preliminary drawings,
sketches, study model, etc. for Authority's approval along with estimate of cost.
2. Prepare SBC data as per requirements with detailed topography study of the entire site area
including contour survey of total land.
3. Structural Design: Prepare design of foundation and buildings structure after taking into account soil
test report to withstand cyclone / windstorm, seismic loads and earthquake and shall be in
accordance with National Building Code and Indian Standard Code of practice.
4. Design of services including but not limited to, a) Sanitary, plumbing, drainage, water supply and
sewerage design, b) Electrical, electronic, communication systems and design, c) HVAC, d) Building
automation system, and c) Fire detection, Fire protection and Security systems etc.
5. Design and drawing for components like: Landscape, Conservation, graphic design and signages shall
also be part of the scope of works.
Stage A.3: Statutory Clearances
1. The consultant shall endeavour towards Identification of projects which require minimal special
clearances and are sensitive to the natural and cultural environment of the site.
2. The Consultant shall be responsible for getting all clearances, both Pre and Post-construction, from
the Department/agencies like Environment, Forest, CRZ Clearance, Local Authority, Archaeology
etc, that may be required for the projects as identified.
3. It is clarified that the statutory fee for the clearances shall be borne by the Authority at actuals.
Aller costs including technical inputs, hiring of any specialized consultant required for mapping of
data or any such other technical requirements/studies, testing of various parameters, travel etc.
shall be borne by the Consultant.
Stage A.4: Working Drawings and Tender Documents
1. The Consultant shall Prepare working drawings, specifications, and schedule of quantities (precise
detailed measurements sheets with clear location references and Rate Analysis) sufficient to
prepare estimate of cost and tender documents including code of practice covering aspects like
mode of measurement, method of payments, quality control procedures on materials & works and
other conditions of contract in accordance with codal procedures.
2. The Consultant shall assist the Authority in evaluating all new item quotations and make
recommendations in connection with the specifications and drawings connected with the project
Stage A. 5: Assistance in tender invitation, analysis, negotiations, and selection of agencies
1. Preparation of integrated time schedule for execution.
2. Preparation of Request for Proposal Document/s for shortlisting of vendors and agencies for
execution, In lines with the guidelines issued by the Roads and Buildings Department, Government
of Gujarat and For any other guidelines mandated by the Authority, from time to time.
3. Scrutiny, evaluation, and thorough analysis of technical and financial bids.
4. The approach and methodology for batter implementation of project professionally &
comprehensive planning is to be submitted for approval and smooth implementation of the project
in time bound manner.
5. Liaising & co-ordination with the local authorities, contractor/agency and the Authority for
obtaining necessary permissions/NOCs/statutory approvals, if any
6. Furnish three copies of working drawings (duly signed & stamped), schedules, new specification, and
quantities to enable them to fulfil their obligations under the conditions of the Tender.
7. Assist the Authority in evaluating all new item quotations and make recommendations in connection
with the specifications and drawings connected with the project.
8. Following the design phase, the Consultant shall render services as a PMC and provide day to day
supervision services.
Stage B. Services as a PMC
Stage B.1: Supplying Drawings during the Construction
1. Prepare and issue working drawings, specification, and details for proper execution of works during
2. Issue the plinth level drawings on issuance of LOA to selected contractor/agency.
3. All Working drawings required for execution shall be issued in advance, as required by the
Contractor from time to time.
4. Approve samples of various elements and components.
5. Check and approve drawings submitted by the Contractor/vendors when required.
6. Prepare drawings necessary for Authority's statutory approvals and ensure compliance with codes,
standards and legislation, as applicable and assist Authority's in obtaining the statutory approvals
thereof, if required
7. Prepare and submit complete drawings and details sufficient to commence work at site and lot
proper execution during the construction.
8. Approve the schedule of work of progress submitted to the contractors.
9. Prepare and supply to the contractors such drawings, schedule, now specifications, and quantities
enable them to fulfil their obligations under the conditions of the contract.
10. Assist the corporation in obtaining all necessary permission, license and approval form the different
authorities required by the corporation for execution of the project,
11. Render technical advice and assistance necessary for the project.
12. The Consultant shall Issue running bill certificate within 5 days of the claim of the contractor I
agency & final completion certificate for the work executed by the contractor/agency within one
Stage B.2: Execution/Implementation of work
1. Interact with various Agencies, Contractor & Other Consultants for speedy flow of information
clarification etc. with verification of actual Site situation in relation to the Drawings issued,
2. Supervise / monitor the works continuously on daily basis for conformity with quality, good
workmanship, line, levels etc, and provide total superintendence to works.
3. Co-ordinate with participating agencies, Liaison with Local Authorities / stakeholders on daily basis
to ensure all the works progress in a systematic, synchronized manner and time bound manner.
4. Conduct regular site meetings to sort out the bottlenecks holding the progress, Including taking the
required permissions & sort out the Land Use issues (if any) & in case the work is hold up for a week
PMC should report to Authority's Head office (HO) in person and coordinate to resolve the issues
from Head office, Authority by deputing Senior Engineer till it is resolved to further recommence
5. Interact regularly with Authority on all matters related to execution including submission of weekly
progress reports, cost status etc.
6. Verify the contractor's site measurements, bills and issue appropriate payment certificate with
taking and recording MB (Measurement Book). The same shall be signed & stamped by the In-charge
Engineer of Consultant & Jointly signed by the Consultant's authorized signatory for certification of
contractor's bills and periodical verification should be done by senior staff for monitoring the
performance of the Contractor.
7. Organize and witness the testing along with various lest reports of contractor and commissioning of
services and systems.
8. Prepare cash flow charts and update budget estimate as per actual execution and keep Authority
informed on all the changes prior to Implementation & execution of works if any with submission of
specific reports.
9. Monitor the variations and deviations from the original designs, concept and work order and keep
the Authority informed including obtaining prior approvals from the client whenever required with
submission of Excess/Saving Statements.
10. Following Registers should be maintained along with other registers required as per necessity at
every site with addition of other registers required as per need basis which will be inspected by
Authority Engineers as and when there is site visit.
a) Site visit Register
b) Drawing Register- which should clearly depict the Drawing No, Title, Date of Issue, Received
date, Revision Dates & Revision Nos
c) Tender's Technical & Financial Bid
d) Steel and Cement consumption Register
e) Quality control Register
f) BBS Register
g) Cube Test Register
h) Item wise Procurement Register with Chatan (For items having Tender value more than Rs
i) Test Register of all Aggregates
j) Pour card Register
k) Site Instruction & compliance Register
11. The Consultant shall not make any deviations, alterations or omissions from the approved drawings,
Involving financial implications without prior consent of the client.
12. Work has to be carried out only after understanding all Drawings, should follow in totality the note
written in the structural drawing for Implementation & before starting the work according to
Drawings, in case if there is any discrepancy (higher/lower) in tendered quantity, it should be
immediately informed to Authority for taking written permission.
13. The Consultant shall not, without prior written sanction of the Authority, make any deviation in the
plans, specification, approved rates & quantities etc. for any items approved by the Authority.
14. The Authority shall be communicated for all changes, decisions, etc. in writing as shortest in time as
possible well in advance.
15. Drawings, plans and specification are the property and ownership of Authority, irrespective of
whether the work has been executed or not.
16. Consultant should check the specification of all the aggregates including sand, grit & kapachi &
should be used as per gradation / specification of work only.
17. 17. Consultant shall supervise thoroughly and get the work implemented for structural soundness &
operational effectiveness of the works by the Contractor.
18. The Consultant is required to provide services in respect of monitoring, supervision,
implementation, execution and recording of work as being correctly interpreted/ implemented with
the design by the Contractor.
19. At any point of time, if doubt or discrepancy found in allotted drawing/design, Consultant shall
submit the clear alternate/solution with technical justification to Authority.
20. The Consultant shall supervise and monitor the construction work for preoperative and execution on
day to day basis during the work under progress to achieve the stipulated standards of quality of the
project and timely completion.
21. 21. Consultant shall develop and follow the computerized reporting and record management system
and shall obtain prior concurrence of the same from Authority.
22. To Co-ordinate with participating agencies on dally basis to ensure all the works progress in a
systematic, synchronized and lime bound manner & has to submit weekly report to Authority
showing clearly whether work progress is as per the work bar-chart, time limit and scheduled of
implementation with highlighting delayed activities & action required from whom, along with any
critical issue /bottleneck to be resolved & if the work is held up for more than 10 days, Consultant
should report to Authority head office and resolve the issues from Authority office and follow up the
matter till resolved.
23. To monitor the variation and deviation from the original designs, concept and quantity in the work
order and keep the client informed including obtaining prior approvals from the client whenever
24. In no case Consultant will allow excess in execution of items where quoted rate is higher than
estimated rate & No saving will be there - where quoted rate is below estimated rate, except
written approval of Authority.
25. Consultant shall mandatory establish separate fully equipped local site office within 15 km radius of
26. The Consultant shall deploy experienced resources, full time at the site as below during the
implementation stage:
a) (number) resources having a minimum qualification of [BE Civil, with [number] resource having a
minimum of (years) years of relevant experience.
b) [number] resources having a minimum qualification of [Diploma in Civil Engineer), with [number)
resource having a minimum site experience of (years) years
c) (number) resource having a minimum qualification of BE Electrical with minimum (years) years
of relevant experience.
d) [any additional resource as per the requirements of the mandate].
27. The Consultant must ensure that resources to be deputed at site shall conform to the Minimum
experience as given above at all times. The CVs of all such resources shall be got duly approved by
the Authority before deployment.
28. In addition to the full-time resources to be deputed on site, the, Consultant shall ensure that
periodic site visits are also undertaken by senior technical resources / subject experts and Key
Personnel through the implementation of project.
29. The Consultant shall ensure the availability of a Structure Engineer and IT Engineer, who shall be
available for discussions with the Authority as visit site, as and when required.
30. The Consultant shall identify a local technical resource person, who shall act as the point of contact
with the Authority during the implementation of the project.
31. During the course of implementation of projects, prior & post execution stages, including
settlement of claims & arbitration matters, if any, Consultant should indemnify & safeguard the
interest of Authority.
32. If the works gets stop due to some or the other encroachments, Consultant is supposed to inform
the respective Department and fill the works get started on site the concerned Engineer should
remain present in the Office of the Concerned Engineer in the Department.
33. Other than the fee which is to be given to the Consultant, no other expense, what so ever (Le,
Laboratory testing, to and fro transportation cost to attend the meetings etc.) will be given by the
Department. The fees will be paid by checking the actual work carried out by the Contractor on
Stage B.3: Post Execution Stage
1. Obtain integrated as-built up drawing, incorporating the details of various works actually executed.
2. Obtain guarantee certificate, maintenance manuals from specialist agencies and compile them in a
easily understandable for future reference.
3. Assist Authority in obtaining Completion Certificate and/or Occupancy Certificate and / or BU
permission and/or Project use permission, similar clearance and certificate as may be required,
from statutory authorities, wherever required.
4. Prepare an integrated housekeeping, operation and maintenance manual for proper upkeep of the
5. Assist Authority to appoint suitable agencies for operation, maintenance, and housekeeping.
6. Assist Authority In settlement of contractor(s)/agency(les) accounts.
7. Assist Authority in settlement of any extra / excess items if any.
8. The Consultant shall monitor the Project (both physical & financial) during entire Project duration
and shall submit weekly/monthly (or at an interval as specified by the Authority) reports, as
required by Authority.
9. The Consultant shall submit specific reports Including excess / saving statement and statement of
extra items with recommendation of reasonability of rates and justification for the same.
10. The Consultant shall produce one Master Overall schedule and report overall progress every month
The Consultant shall prepare detailed discipline wise schedules for setting out targets, coordinate
and on request by authority in work progress presentations/discussions as may be required.
11. The Consultant shall be required to provide status of monthly (or at on interval as specified by the
Authority) progress report, in the form of a presentation and report. The Consultant may be
required to attend various presentations/meetings, wherever required, at short notice.
12. Other Conditions
1. The Consultant shall be fully responsible for the implementation of the detailed design, day to day
supervision, recording of all measurements, Inspection and evaluation of the works.
2. The Consultant shall not assign, sub-let or transfer their interest under this assignment.
3. Drawing, plans and specification are the property and ownership of the Authority, irrespective of
whether the work has been executed or not.
4. The Consultant should indemnify & safeguard the Interest of Authority during the course of
Implementation of projects, prior & post execution stages, including settlement of claims &
arbitration matters, if any.
5. The Consultant shall ensure that the disposal of debris is undertaken as per prudent practices and
sensitive to the sensitive nature of the site.
6. The Consultant shall coordinate the activities such as site take over, discussion with Authority and
the EPC Contractor(s), review Contractor's work schedule, work plan and implementation schedule
as per the Agreement, review of master list of equipment's and materials, review of master list of
personnel, review of the Contractor's insurance policy, making arrangements for items like site
office, laboratories etc.
Coordination related
1. Interact with Contractor & Other Consultants for seamless coordination towards the flow of
Information and verification of actual site conditions in relation to the drawings issued.
2. Coordinate with all stakeholders on a daily basis to ensure that the progress of the works is in a
systematic, synchronized and time bound manner.
3. The Consultant shall interact regularly with the Authority on all matters related to execution and
submit weekly progress reports, status of cost and other details as necessary etc.
4. Communicate to the Authority all changes, decisions, etc. in writing well in advance and only after
the prior written approval of the Authority on the same should they be executed.
PART-II: Timelines and Payment Schedule
1. The Consultant shall be paid at the rate of [A.BCD] % [[In words] percentage) of the total sanctioned
project cost of [in numbers] Cr (Rupees [in words] only), which is Inclusive of all taxes excluding
GST, against submission of Invoices.
2. The fee as mentioned above is inclusive of all surveys, Investigations, testing, laboratory costs, fee
towards design, planning, preparation of DPR, Interior design, structural design, plumbing &
sanitation design, landscaping, detailing towards electrical & electronics (Internet, computer, CCTV
camera, HVAC, etc.) design, preparation of estimate, BOQ, tender papers, tender evaluation, cost
of resources, site office, printing, preparation of models etc., which may be required for providing
services for this Project.
3. Consultant will be required to provide its services as per the Annexure A and depute resources as
mentioned in the detailed scope of work. The payment terms shall be as under:
Percentage of Timelines
Payment (cumulative)
1st release: Sanction of DPR From State Level
Committee And submission of pre tender 05% [number] months
architectural and Engineering working drawings
2nd release:submission of detailed specifications,
bill of quantities, detailed architecture working
designs together with estimates of cost sufficient to 15% [number] months
invite Tenders and drawings for obtaining approval
from statutory bodies
3rd release: on award of the project to the
10% [number] months
Distributed over
4th release: During the course of the corresponding
[number] months
constructionproportionate according to the progress payments as made
to the executing
5th release: On completion of Project/work 05% [number] months
6th release: After releasing of B.G. and S.D. to /all
05% [number] months
the executing agency
Important Note:
1. For normal variation not involving any major revisions, no additional fee shall be paid to the
Consultant. However, if the Authority has mandated major changes, the Consultant will be paid for
revision in drawings and a mutually decided timelines. Major changes shall mean revision which
creates more than 10% increase in the project cost, and after 2nd release.
2. Authority will refer to all relevant clauses of the GR while making payments.
3. All submittals (Reports and Drawings) shall be made in requisite number of coloured printed copies
at an appropriate scale and soft copies to be submitted over email/pen drive.
4. The Authority shall endeavour to give feedback, if any, on each submittal within 15 days of the
submission, after which the Consultant shall re-submit the revised reports and maps. Payments shall
be released stage wise upon successful acceptance of the submittals at each stage by the Authority
5. 5% of the total bill amount from each bill shall be retained by the Authority ("Retention Moneys")
and shall be released in full and without any interest to the Consultant within 90 (ninety) days
(without any interest) following the release of last milestone (provided there are no outstanding
claims of the Authority on the Consultant in terms hereof in which event amount of outstanding
claims shall be appropriated from such retained amounts.
6. In an event the project completion is delayed beyond [number] years, no additional compensation in
any manner shall be given to the Consultant.
PROPOSALEVALUATION
Atwo‐stageprocedurewillbeadoptedinevaluatingthe proposals (1) Technical Proposal
and (2) Financial Proposal;
EvaluationofTechnicalProposal:
Theevaluationcommitteeappointedbytheclientwillcarryoutitsevaluation applying the
evaluation criteria as per mentioned below:
Onlythoseconsultantswhofulfillfollowingminimumeligibilitycriteriashallbe eligible for
consideration: ‐
1. The consultant should have experienced Technical Team readily available whenever
askedforPresentation/Supervision/DPRPreparations/Reportsafterduefield visit.
Consultancy Firm should have Registered for Last 10 Years
2. The updated average annual turnover for last three financial years should not be less
than Rs. 3.00 Crore for last three years. (C.A Certified Copyattached, F.A:2022-23, 2023-
3. Theconsultantshouldhavehisownofficesatisfyingallthe necessary requirements to carry out
the assignment efficiently.
4. Experience of Management Consultancy Services for All Kind of Infrastructure
Development Work of Government Department within the last 7 years of project cost
Crore or above. ( Minimum 5 Projects Needed) ,Completion Certificate or Form 3A must
be sign by Responsible Officer.
5. Consultant should have following minimum technical staff. He should engage
additionalstaffaspertherequirementoftheproject.(Note:-thestaffmust the Part of the
Consultant Firm at least 01 Year (at the date of the Date of Publication of the tender
Sr. Particular Numbers Qualification Minimum Remarks
1 TeamLeader 1Nos M.E/M.Tech 10Years Must have experience Execution
Civil/Structure /PMC Work of Roads, Bridges,
/TownPlanning Buildings,Water &Waste Water
/Transportation Treatment, Sanitation, Sewage &
Drainage line Execution works Out
2 Quality Inspector 2Nos B.E./B. 5Years of which Min. 05 Years Experience
/ProjectEngineer Tech(Civil) or to workwithanyGovernment/
Higher Department/PSU’s/AutonomousBody
3 Sr. 1Nos M.E/M.TechStructu 5Years
Structural Engineer ral Engineer
4 Sr. 1Nos B.Arch/M.Arch 5Years
Architect Engineer
5 Surveyor/ 2Nos Diploma in Civil 5Years
QuantitySurveyor Engineering
6 Safety Engineer 1Nos Diplomain 05Years
7 Town Planner 1 Nos. M.E/B.E 05 Years
(civil)/B. Arch
8 Surveyor 1 Nos. Draftsman 05 Years
On the basis of rates quoted by lowest bidder and agreed upon after
negotiation (if any), all other qualified consultants, bidders will be invited to negotiate
and to agree for the lowest rates of each of the items and all those who agrees, shall be
entitle for empanelment for the work.
AWARDOFCONTRACT
1.0 Onthebasisofratesquotedbylowestbidderandagreeduponafternegotiation(if any)
2.0 TheselectedConsultantisexpectedtocommencetheassignmentfromthedateand at the
location specified in empanelment order.
3.0 The Appointment letter does not stand for any kind of work assurance. Final work
scrutiny will be carried out by District Panchayat Devbhumi DwarakaOnly.
(1) BuildingsWorks.
Consultants should have successfully completed preparation of
Estimation/D.P.R./SupervisionatleastonesingleBuildingsprojectnotlessthan
Rs.5.00 crores.
(2) AsphaltRoad,R.C.C.RoadandPaverBlock work.
ConsultantsshouldhavesuccessfullycompletedpreparationofTA/QA/PMClike
AsphaltRoad,R.C.C.RoadandPaver Blockwork10.00crore.
(3) Water & Waste Water Treatment, Sanitation, Sewage & Drainage line Execution works
atleast02.00crore.
(4) WaterbodyRejuvenationatleast2 nos.ofprojectcompletedandongoingwork order
of the same must be attached.
Essential for Submission of bids:
Sr. Particulars
1 Thepricebidtobesubmittedonlineinthegivenformatonly.
2 Theformstobesubmittedonlineandbyregisteredpostinhard
3 TenderfeesandEMDshouldbesubmittedonlineandinHardcopy
FORM–1(Detailsof Firm)
Sr. Particulars Attachment
1. NameofBidder:
2. NationalityofBidder:
OfficesAddress:
3. Telephone Number:
E-mailaddress.:
4. YearofEstablishment:
5. LocationofEstablishment:
Bid is to be submitted bythe
companies registered with ROC
6. Joint Ventures, Business Take
Over Agreement, MOU if
submitted should
CertificateofIncorporationNo.
7. &Date(Establishment)
Haveyoueverleftthework
8. awardedto youincomplete?
(Ifso,givenameofprojectand
fornotcompletingwork)
Inhowmanyofyourproject’s
were imposed for
delays?(Pleasegive
FORM–2(TurnoverDetailsofFirm)
TheturnoverdetailsoflastthreeyearstobefurnishedwithdulysignedbyThe Chartered
Accountant in following format
Sr. Year Turnover(Rs.In Lakhs)
An average annual
turnoverof3.00 crore in
thelastthreefinancial
FORM–3(ListofProjectsCarriedoutbyOrganization)
Thelistofprojectsonhandorcompletedistobefurnishedasunder.
Thehardcopiesofworkorderandcompletioncertificatestobesubmitted.
Sr. No. Detailsofproject Costofproject Descriptionof
(InLakhs.) project
FORM–4(DetailsofStaffMembers)
Theinformationofstaffshouldbeprovidedasunder.
Sr. Detailsofstaff Qualifications Experience Remarks
FORM–5(Price Bid)
Company / Firm Name
Sr.No. Descriptionofservices Unit Percentageoftheproje
%Infigure %In words
1 Provide Services as architect and PMC as Job
mentioned In Scope Of Work Including
Preparationof DPR, TechnicalSanction&
Administration approval fromConcern
Authorityofprepared detailed Project reports for
various components. Preparation of
TenderDocuments,OpeningoftenderwithtenderEv
aluation Report/Prequalification Report as per
Tender condition. Full time Supervision work,
QA, quality control including checking Samplesof
Material, Cubes test and other testing Reports
required as Per Government rules and submitting
the material, cube to Concern Lab
GERI/approved lab and test
reportsubmittedtoConcerned Technical Officer of
District Panchayat, Devbhumi Dwarakataking
measurement of the work, and preparation of
bills and all allied work till Completion of work
with completion certificate.
Authorized person ofconsultants
1) Consultancyfees shallbequotedon%basisoftheprojectcost.
2) Project costmeansthecostoftheproject excluding all the taxes e.g. G.S.T., labour cess etc.
finally approved asperevaluation of thebidwhich isincluded inthe contract agreementandduly
certified by District Panchayat, Devbhumi Dwaraka. The cost of theconsultancy is the
onegiven inthe summary as above and payment isto be made asagreed during negotiation.
3) Consultantcanclaimonly onetimefor the surveywork, whichshallbedone
onthefinalalignment only, no payment shall be made for alternative routes.
4) The consultantwill carry out onlythat activity which is assigned tohim foraparticular project.
Payment to the consultant will be made, for only those activities which are assigned to him
and satisfactorily completed.
5) Inthecaseofabnormallylowratesquotedbytheparticularconsultant/sand ifhisrates are
accepted by the client, he shall liable to carry out the assignment with his quoted rates for
any quantum provided by the client. In case of the non-satisfactory performance, his
deposits will be forfeited and proposal for the blacklisting shall be initiated by the client. A
self-declaration in Perfoma-2 shall be submitted with thetechnical proposal.
6) As per the guidelines of the Mukhyamantri Grammothan Yojna Various works Of Water
supply and Distribution,Solid/Liquid Waste management,Waste Water Management (with
and Without Treatment),Road (C.C/B.T), Infrastructure development work, Sports
Facilities, Lake development works, Street light or any other works Suggestedby
Sign&Sealofthe EXECUTIVEENGINEER,
BidderRoadand BuildingPanchayat Division
Devbhumi Dwaraka
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
ONLINE ADVT.pdf
Tender PMC-Devbhumi Dwaraka.pdf
Download all tender documents and submit your bid