Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.22% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | +1.11% | ₹3.0 L | L2 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer
As BOQ
2026_RDPR_305640_13
e-NIT No- 156 REW Samba of 2026 Dated-07-03-2026
Open Tender
Civil Works
30 days
Purmandal
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹6,000
28 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: . -All kinds of soil.
Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded crushed stone aggregate 40mm nominal size
Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size
Dumping of Stone including the cost of stone , All Leads Lifts Complete (*plus carriage)
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for Soffits of Slabs
Centering and shuttering including strutting, propping etc. and removal of form work for Edges of Slabs
Centering and shuttering including strutting, propping etc. and removal of form work for Columns, piers, abutments, pillars, posts and struts
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Carriage of sand 1KM
Carriage of Stone 1KM
Carriage of Aggregate 5km by M.T
Add cost of sign Board/Plate
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.35 MB
BOQ_992648.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid