| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.4 LAccepted-AOC | L1 | Accepted-AOC L1 PARTY |
| Sl No | Description | Qty | Unit | ARDEN INFRATECH PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Labour charges | ||||
| 1.01 | Labour charges for unskilled worker for chipping, cleaning, uprooting overgrowth from the building and unforeseen work if any. | 30 | Day | 1,300 ₹39,000 Lowest |
| 2.00Dismantling | ||||
| 2.01 | Dismantling old/ weak plaster over masonry or skirting, raking out joints and cleaning the surface for plaster including scaffolding upto 4mtr height, tools and tackles and disposal of rubbish to the dumping ground within 1 Kms lead, at all height | 200 | sqm | 65 ₹13,000 Lowest |
| 3.00Chipping | ||||
| 3.01 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual chisel and/or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts, scaffolding upto 4 mtr height, all complete as per direction of Engineer-In-charge. 50mm average thickness | 500 | sqm | 280 ₹1,40,000 Lowest |
| 4.00Dismantling and removing existing water proof layer | ||||
| 4.01 | Dismantling and removing the existing water proofing layer including cleaning and disposal of the debris up to a lead of 1 km, including scaffolding, tools, tackles,clearing the surface to remove all dust, dirt, loose mortar etc. as directed by Engineerin-Charge. | 550 | sqm | 150 ₹82,500 Lowest |
| 5.00TMT steel bar anchoring- upto 12mm dia | ||||
| 5.01 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make including scaffolding upto 4 m height but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.Upto and including 12mm dia. | 650 | holes | 180 ₹1,17,000 Lowest |
Tender Value
₹50.1 L
EMD Value
₹50,000
Closing Date
31 Mar 2026, 3:00 pmClosed
HOU(TP)
KMML,CHAVARA
Dismantling of old concrete Repair of plaster Cleaning reinforcement Applying bonding coat Applying micro concrete Applying thixotropic compound plastering and SBR plastering PCC and RCC waterproofing Pressure grouting Scaffolding
2026_KMML_846303_1
EAF/CIV/1320/2025-2026 Dtd16/02/2026
Open Tender
Civil Works - Buildings
Item Wise
365 days
KMML, CHAVARA
Refer Tender Documents
6 documents required · 6 mandatory
₹2,950
₹50,000
15 Oct 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
31 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges | |||||
| 1.01 | Labour charges for unskilled worker for chipping, cleaning, uprooting overgrowth from the building and unforeseen work if any. | 30 | Day | - | - |
| 2Dismantling | |||||
| 2.01 | Dismantling old/ weak plaster over masonry or skirting, raking out joints and cleaning the surface for plaster including scaffolding upto 4mtr height, tools and tackles and disposal of rubbish to the dumping ground within 1 Kms lead, at all height | 200 | sqm | - | - |
| 3Chipping | |||||
| 3.01 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual chisel and/or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts, scaffolding upto 4 mtr height, all complete as per direction of Engineer-In-charge. 50mm average thickness | 500 | sqm | - | - |
| 4Dismantling and removing existing water proof layer | |||||
| 4.01 | Dismantling and removing the existing water proofing layer including cleaning and disposal of the debris up to a lead of 1 km, including scaffolding, tools, tackles,clearing the surface to remove all dust, dirt, loose mortar etc. as directed by Engineerin-Charge. | 550 | sqm | - | - |
| 5TMT steel bar anchoring- upto 12mm dia | |||||
| 5.01 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make including scaffolding upto 4 m height but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.Upto and including 12mm dia. | 650 | holes | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD.pdf
Tender Documents • 4.84 MB
AM.pdf
Other Document • 0.34 MB
BOQ_1432503.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .